Fred Doherty Module Work Fred Doherty. Stave Module Building Hybrid Bonding Bonding table for the BJ820 still in workshop Modified working height of the.

Slides:



Advertisements
Similar presentations
RP4AN 21/2 – 6. Modification Overview Production of the RP4AN series began in Production of the RP4AN series began in The 4AN indicates an.
Advertisements

Testing Relational Database
1 jNIK IT tool for electronic audit papers 17th meeting of the INTOSAI Working Group on IT Audit (WGITA) SAI POLAND (the Supreme Chamber of Control)
Eeprom/MCU Reader This is a function for advanced users who wish to read data from an Eeprom or MCU without the user friendly step-by-step Immobiliser.
SOFTWARE TESTING. INTRODUCTION  Software Testing is the process of executing a program or system with the intent of finding errors.  It involves any.
RockOn! Canister Integration RockOn! 2009.
Click on this image to open the full PDF document.
Test-Driven Development and Refactoring CPSC 315 – Programming Studio.
ATLAS Module building at Glasgow
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
Hybrid assembly at Glasgow. Placing ASICs Arrange 20 ASICs in ASIC tray with strip bond pads facing outwards – ASICs to be used in ‘Cat A’ sample boxes.
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
An Introduction to - Computer Numerical Control. Introduction CNC: Computer Numerical Control Production of machined parts whose production is controlled.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
Ergonomics Is the study of how the human form moves at work and at play. Ergonomics must be taken into account when products are being designed, because.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Checking data Chapter 7 Prepared by:Sir Mazhar Javed.
Measuring length in infants and young children Baby’s back rests on this Foldable foot plate Foldable head plate Central sliding panel attached to the.
1 Jim Thomas - LBL New Pad Plane Design Proposal & Specifications Jim Thomas, John Hammond, Bob Scheetz, Jon Wirth, etc., etc., and a cast of thousands.
Testing 1 © Minder Chen, Source: Developing Web Applications with Microsoft Visual Basic.NET and Microsoft Visual C#.NET Testing Test plan objectives.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Stavelet Update Peter W Phillips 29/07/2011. Serial Powering with a Stavelet Module: Recent Results Whilst single SP modules in the “chain of hybrid”
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Preventive Maintenance.
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
Prisms & Cylinders Development with a cut surface 1 J. Byrne 2014.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Gluing, measuring and shearing Heated plate curing Is the process feasible? Tests with 130nm hybrids Measure resulting glue thickness Determine the shear.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Setting up correctly Different types and their use
Loading stave 4000  Receiving test of modules : No problem despite some damages at one edge of few modules (AMS) One MCC failure in one module, reworked.
Valencia Report 5 Pre-qualification (2 mechanical + 3 electrical) All inside mechanical specification in XY after assembled. However, Pre3-Pre5 bad planarity.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Tessellation Project Supplies needed: 3 x 5 index card for every 2 students Scissors Ruler One sheet of white paper One sheet of construction paper Pencil.
Glasgow Report W. H. Bell, A. Cheplakov, F. Doherty, M. Horn, J. Melone, V. O’Shea UK-V Meeting 03/03/04 -Glasgow.
4-4-3 Shift registers. Learning Objectives: At the end of this topic you will be able to; i) recognise, analyse and design circuits containing D-type.
MM Status Mostly unchanged (Feb. 3 rd 2016). Parts Mildly modified bridges, allowing to actually move 130nm pickup tools along r*phi –Turned out to be.
 Software reliability is the probability that software will work properly in a specified environment and for a given amount of time. Using the following.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
Mechanical robustness & associated tension at the DSSD slant part connection Mar-5 th 2013 B2GM KEK S. Uozumi (KNU), T. Tsuboyama, N. Sato (KEK)
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
Vertical Mill Basics Instructor:.
MECHANICAL HANDLING SYSTEMS
→ need to guide UV light into gap; also beware temp effects
Ladder Assembly All tools and jigs produced Glue dispensing works
Pipe Bending Ian Mercer, Harald Fox, Richard French.
Grid Pix Field Simulations and precision needed for a module
Hybrid Issues.
Ladder Assembly All tools and jigs produced Glue dispensing works
Open Issues Modification of Cactus Arm bending tool required
Equipment for Assembly – UK Experiences
RPDA 4AN 21/2” – 6”.
Life Cycle Models PPT By :Dr. R. Mall.
ATLAS Upgrade Module Bonding Trials Using Glass Asics
HIC Assembly - Liverpool
DCDA4AN 2½” – 6”.
Building a Nightstand Woods 1 Final Project Step #1
Unexpected Failures of Modules on Rods
Test Case Test case Describes an input Description and an expected output Description. Test case ID Section 1: Before execution Section 2: After execution.
DC4AN 2½” – 6”.
Presentation transcript:

Fred Doherty Module Work Fred Doherty

Stave Module Building Hybrid Bonding Bonding table for the BJ820 still in workshop Modified working height of the borrowed bonding table provided by Paul from Accelonix –Changed 4 table legs –Also added to the base plate height by introduction of a secondary makeshift base plate. Due to vacuum issues the hybrid panel was – screwed down in various positions across the hybrid vacuum jig – tape applied around areas –The vacuum jig and mounted hybrid board for bonding had to be clamped to the bonding table using a low lying G clamp due to no through holes being available to screw down onto the borrowed Accelonix bonding table.

Fred Doherty Stave Module Building Hybrid Bonding The bonding software program was then loaded and the XY positional re-referencing and Z height of all 20 chips on a single hybrid were performed. Bonding then commenced with intermittent error situations, some of which were resolved easily and others which were left for reworks after initial attempts failed to fix. At the end of the bonding process the board was taken out and bonds analysed visually. There seemed to be 3 distinct problems on this very first attempt at bonding an ATLAS hybrid with our incomplete hardware setup.

Fred Doherty Stave Module Building Vacuum Problem The first problem indicated a possible poor vacuum along the full length of one side of the hybrid. –A regular pattern of failed bonding appeared along the 10 chips on one side of the hybrid closest to the edge of the board, although in contrast the other two thirds of these same 10 chips furthest from the edge/side all bonded ok. –You could draw a straight line down through the 10 chips and separate good bonds from failed bonds. –Implemented further improvements to ensure regular uniform vacuum across all hybrids being bonded.

Fred Doherty Stave Module Building Parameter Program Setting Issues In the second problem It was found that a same region of 6 consecutive bonds on each chip repeatedly had poor bond loop characteristics which caused concern as to their reliability. –This may point to problems with the pre programmed bonding parameters (loop shape) of the software for these particular 6 bonds repeated on more than one chip. Will check program parameters to confirm suspicions for this problem. Bad Bonds – Incorrect Parameters Good Bonds – Correct Parameters

Fred Doherty Stave Module Building Hybrid Board Edge Curl The third problem occurred at the power feed bonding pad area at the hybrid board extremity. -The board seemed to be curled at the edge even when vacuum applied and improvements implemented. This may have been introducing bounce to any attempted bonding in the area whilst off board bonds seemed to take ok.

Fred Doherty Stave Module Building Bonding Reworks Applied extra taping around the hybrid area and put in screw and nut fixing (close to the hybrid being bonded) to further clamp / seal hybrid and bonding jig. This proved effective and enabled completion of the the remaining hybrid chip bonds. At the Power Feed pad area, eventually achieved bonding success at the innermost pad positions furthest from the board edge. First Hybrid fully wire bonded at Glasgow