HV Connector and Endcaps, Part II After the discussion at this week’s LST meeting we went back to the drawing board and tried to implement Mauro’s suggestion.

Slides:



Advertisements
Similar presentations
Crimping Get the pinouts for the desired connector and application. 2.Identify the proper connector and the associated pins for your application.
Advertisements

Garfield Graphics included with kind permission from PAWS Inc. All Rights Reserved. Making a PowerPoint Presentation 02 Adding Sound.
Magnetic Force Types/Properties of Forces and Motion Teacher Page.
Electronics Merit Badge Class 4 5/17/2015Electronics Merit Badge Class National Scout Jamboree1.
Rapid Prototyping for Casting Rapid Prototyping for Casting Aaron Agostino Mechanical Engineering – Union College Advisor – Professor Amy Hsiao, Ph.D.
How to Replace Your Desktop PC’s Power Supply Computer Based Training Objectives.
BaBar/LST Meeting Dec 8, 2003K. Honscheid, Ohio State University Module Assembly Quality Control High Voltage Ohio State Status Report.
1. What does each strip on a resistor tell you? Label each ring on the diagram below: Name: Date: 2. Explain in your own words what a resistor does _____________________________________.
Costs P6. Costs An important part of an e-commerce strategy is identifying the costs. Whether they are specific prices or just isolating where the business.
Large Cell Scope Pictures, Part II HV Gnd 1nF Large Cell Tube Anode signal Phi Cathode signal scope S1 S2 S1 S2 This is a follow-up on Richard’s measurement.
Service Bulletin 161 SUBJECT: Upgrade to current production level UNITS:D27105 DATE CODE RANGE: All units up to date code to be checked ISSUED.
(2003/Jul/28) Phenix Aerogel Upgrade ReviewSusumu SATO1 Contents: [1] Heat: (at PMT Base) [2] Fire: (from Material) [3] Electrical: (at HV connector) [4]
Current ILC work at Fermilab Electrical Engineering Dept.
Infrastructure Update As at 11 th March 2009 Remaining four plates now fitted to North shield wall North & South walls and all galleries are considered.
Setting up the Ricoh C305 Press F5 to start the Presentation
Selecting, Formatting, and Printing a finished Report…….
Bell Work After an increase in his weekly wage of 20% Joe has $450.What was his wage before the increase? $450 is 120% of  Complete a number line with.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
Ways to Check for Divisibility Dividing By 1 All numbers are divisible by 1.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
Undergrad Research Problems: 650 undergraduate majors unrealistic student expectations student uncertainty about how to enter research no central student.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Survey Questions First: Part I A change was made after a few classes to not adhere strictly by the book because I felt it went off on too many tangents.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Practical electricity 2: uses and safety. a battery… a current can only flow when a circuit is complete… 12V 0 V.
WEEK 1 You have 10 seconds to name…
Do Now 1/9/12 1.) Draw 2 triangles 2.) In the first one, draw the perpendicular bisectors. 3.) In the second one, draw the angle bisectors.
INSTALLING HARDRIVES AND FLASH DRIVES Objective: install a flash drive and test the installation. How is a Flash drive different to a Hard Drive? Hard.
V. Bobillier1 Cable installation status.
Source Page US:official&tbm=isch&tbnid=Mli6kxZ3HfiCRM:&imgrefurl=
Read your mind ???????. Write down secretly a number x which is between 1 and 63 Done Already ????
Stacks. What is a Stack? A stack is a type of data structure (a way of organizing and sorting data so that it can be used efficiently). To be specific,
HV Cable and Snout Conflict: Problem and Possible Fix James Mott g-2 Tracker Meeting 02/25/16.
T HE PDM INTEGRATION P. Barrillon (LAL) & G. Prévôt (APC) On behalf of the PDM crew (Simon, Lech, Philippe, Sylvie B) EUSO-SPB/MiniEUSO progress meeting,
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
1 Process mapping template - Instructions The following two pages include simple templates for starting a process map –Process mapping shapes –Process.
ΒΡΑΔΙΕΣ ΚΟΙΝΟΥ – ΑΣΤΡΟΝΟΜΙΑ ΓΙΑ ΟΛΟΥΣ Ε.Γ. Ανασοντζής – Ε.Κ.Π.Α. Τίτλος WP5, Paris, Feb.09.
Version 0.1 TPAC Irradiation board Upgrade 2/06/2010.
Mauro Citterio - Mi meeting
Teleconf ACS – FREIA 13th March 2017
LAV HV repair plans Matthew Moulson
Your Name (Delete these words and replace it with your name)
Safety Clearance of NA62 01/09/14 FV.
A Software Architecture Model……
Firs samples Injection direction
Source filename: MS Gothic as default test.xlsx
Page 1. Page 2 Page 3 Page 4 Page 5 Page 6 Page 7.
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
Testing of the EMCO Prototype Boards
II //II // \ Others Q.
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
Injection mold specification
As you enter class... Take out all parts of your rough draft. Planner
e- tunes-witness bunch 42
VIGNESH POLYTECHNIC COLLEGE
EMMC Provider Training:
Date: August 1, 2016 Today's Bellringer:
PowerPoint Information
Injection mold specification
WHAT ARE WE DOING FOR HOMECOMING??????????????
Injection mold specification
Insert Presentation Title Here Insert Presentation Summary Here
Please insert Title Please insert sub-title 1
Injection mold specification
Modified at -
Intro to Arduino Part 2 The Breadboard
e+ tunes-witness bunch 42
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,

Presentation transcript:

HV Connector and Endcaps, Part II After the discussion at this week’s LST meeting we went back to the drawing board and tried to implement Mauro’s suggestion to add a sheath to the HV pins on the endcaps. This will provide mechanical protection and removes any electrical safety concerns (at no time is the metal part of the pin exposed when the connector is being inserted) The following pages show a bunch of AutoCAD drawings with the modified endcap and HV connector. The design of the HV connector is slightly more complicated but we believe it can still be done by injection molding. Frederico has to tell us whether the endcaps can be built this way. Please note that there is still some uncertainty in the position of the “mechanical” holes. The autocad files can be found at and