MICE VC 12-09-2013 Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE FAC Alain Blondel 1 Summary of run meeting 8 August 2011 Present: Andy Nichols Tim Hayler Pierrick Hanlet Gail Hanson Linda Coney Victoria.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 MICE Project Board Schedule and milestones Reconstructing the schedule Present status Monitoring and feedback Key schedule drivers and concerns Andy.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
CMPB Alain Blondel 14 April STATUS OF MICE.
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
MICE - UK Project Progress Roy Preece 30 th April 2013.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
MICE CM39 Alain Blondel CB report 1 Report from the MICE collaboration board.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE Running L. Coney – UCR MPB – 31 Oct Coney - MPB - 31 Oct 2012Outline Current Running Current Running Shift personnel training Shift personnel.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
MICE CM 30 Collaboration Board Summary. Agenda 1. Approval of minutesBooth 2. Spokeʼs remarks & EB reportBlondel 3. Strathclyde request to join MICEKevin.
Executive Board Meeting Roy Preece 23rd May 2014
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
MICE VC 10-Oct-2013 Alain Blondel 1 MICE NEWS VC 162 LOTS OF THINGS HAPPENED! have arrived at RAL: -- EMR (see report today) -- AFC2 see pictures -- SS2.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May o VC 17th June o CM27 (RAL)
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
Alain Blondel MICE collaboration meeting CM25 RAL November   MICE The International Muon Ionization Cooling Experiment.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
MICE VC116 Alain Blondel 18 December MICE NEWS See more details in Macolm’s MICE news!
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting CM36 will be Jun at IIT and the 19th at Fermilab right before.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report General Update –Phase I nearing completion –MICE Power –Actions for Decay solenoid & target –Follow-ups from last VC –Conclusions MICE.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
MICE CM33 – system test? Alain Blondel 1 CM 33 wrap-up TOWARDS CM34.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE RLSR – 13Nov2013 Alain Blondel 1 MICE Project Board 14 November 2013 Alain Blondel.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
MICE CM28 Engineering Session Summary (On behalf of Wing)
Status of the MICE Construction Project
Collaboration Board Report
MICE CM31 Schedule summary
MICE NEWS MICE VC 155 Next Collaboration meeting will be
MICE PM Report Progress with the Infrastructure A few problems
Presentation transcript:

MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things

MICE VC Alain Blondel 2 Upcoming MICE VCs Thursdays: 10 October Next collaboration meeting 6-8 November Organization: V. Blackmore, A-B. J. Cobb S oftware workshop 4-5 November November RLSR November MPB November FAC Upcoming Agenda

MICE VC Alain Blondel  Provisional MICE SCHEDULE update: June 2013 STEP I STEP IV (possibly w/o field: Q2 2014) Q to Q STEP VI Run date: EMR run Oct 2013 Under construction: Target date Q Step V run possible 2018 Resource Loaded Schedule -- MIPO’s hard work! Slip since october 2012 = 2 months

MICE VC Alain Blondel 4 Important decision points -- September 2013: installation of return yokes for step IV? last VC: --original motivation of baseline plan is to run step IV before Q gone -- was not certain that tracker readout could be properly shielded (cryocooler, electronics) without return yoke + what else? -- cost/sched. implications of yoke implementation to be understood internal MICE discussion TODAY Presentations represent work since WG was set up in 2011/2012 EB tomorrow will still need to understand some more about resource loading the retrun yoke option  project manager (MIPO) + EB next week. review in September -- Around summer 2015 : -- decision point for possible step V stop-over in implementation of full return Yoke for step V/VI

MICE VC Alain Blondel 5 Magnetic field mitigation review panel set up: (Andy) Tom Taylor, CERN – Chair (limited to 23/24 th Sept) or 1/2 nd October Jim Clarke, AsTec – magnet group Division Head, (alternative chair to above) Mark Hatch, CERN – experience of integration, services and safety in ATLAS Ken Bell, STFC – Experience of CMS field mitigation problem on electronics and hardware John Thomasson, STFC – newly appointed Head of ISIS Accelerator Division, replacing David Findlay Mike Glover, STFC – Head of ISIS Electrical engineering Martin Hughes, STFC – experience of ISIS electronics hardware Vladimir Kashikin, FNAL – S/C magnet expert

MICE VC Alain Blondel 6 Hardware status 1. EMR construction complete (drink in Geneva tomorrow at 14:00) shipping early next week arrive RAL ~23 September run in October (week-ends) Shifters welcome. (See MOM report) 2. SS2 shipping imminent (preparing magnet for shipping) ETA: end Sep13) 3. SS1 started training but some teething problems (HTS lead? Warming up) 4. AFC1 quesnched at A on Aug16. (acceptance is 188….) This magnet does not pass acceptance for other reasons AFC2 to arrive at RAL end of september for testing. 5. Decay solenoid had a burned cold lead: requires opening and surgery.  no DS for EMR run   will be repaired during the Xmas shut-down 6. «TIARA»: installation and test of of first Amplifier in MICE hall going on to be ready to run in November – EMR run organized to minimize interference:

MICE VC Alain Blondel 7 DRAFT EMR RUN PLAN