B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Title Sub Title B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power.

Slides:



Advertisements
Similar presentations
Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
Advertisements

DC Responses Received WA OR ID MT WY CA NV UT CO AZ NM AK HI TX ND SD NE KS OK MN IA MO AR LA WI IL MI IN OH KY TN MS AL GA FL SC NC VA WV PA NY VT NH.
Proposed Federal Renewable Electricity Standard (RES) April 20, 2009.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power Administration - Pumped Storage Evaluation Northwest Hydroelectric Association.
Overview of the U.S. Electrical System & the Bonneville Power Administration (BPA)
Northwest Electricity The Council An interstate compact of ID, MT, OR and WA, not a federal or state agency. An interstate compact of ID, MT, OR and.
3/16/20001 BPA’s traditional revenue stream varies with water supply (higher water conditions, higher revenues) BPA’s revenues from Slice are independent.
Made Possible by the Broadband Technology Opportunities Program Funded by the American Recovery and Reinvestment Act of 2009 Made Possible by the Broadband.
Pan American Advanced Studies Institute Simulation and Optimization of Globalized Physical Distribution Systems Santiago, Chile August, 2013 – Case 1 Case.
AASHTOWare Program Benefits Standing Committee on Highways October 18, 2013 Tom Cole, Idaho DOT AASHTO Special Committee on Joint Development.
1 Jesse Jenkins (RNP) November 7th, 2006 Northwest Energy: A Look at the Past, Present and Future of Electricity Generation in the Pacific Northwest.
Legal Department Outside Counsel Management 1 Enhanced Outside Counsel / Vendor Management Processes Timekeeper level budgeting for litigation matters.
Federal Columbia River Power System Operations Planning.
National Center for Higher Education Management Systems 3035 Center Green Drive, Suite 150 Boulder, Colorado Financing in Sync: Aligning the Pieces.
Automated Draws vs. Numbered Ball Drawings Tennessee Education Lottery.
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
Canadian Columbia River Basin Forum Stephen Oliver VP Generation Supply Bonneville Power Administration November 10, 2005.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N McNary Dworshak Anderson Ranch Palisades Ice Harbor Grand Coulee Revelstroke Lower Monumental.
Using BEA`s Gross State Product (GSP) Estimates George K. Downey Understanding Regional Economic Data for Policy and Planning—Dallas, Texas September 8,
Introduction to Bonneville Power Administration
1 Climate Action Team Presentation Peggy Duxbury Seattle City Light September 12, 2007 (206)
Recovery Act Smart Grid Funds: $4.5 Billion Office of Electricity Delivery and Energy Reliability$ Millions Smart Grid Investment Grant Program; ≤3 years.
Why Reform Government? Federal Spending National Debt: $13.23 Trillion Federal Spending National Debt: $13.23 Trillion Your personal share? Over $42,000.
1 Practicing What We Preach Dr. James Fenton, Director A Research Institute of the University of Central Florida Creating Energy Independence Since 1975.
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
NW Regional -- Washington n n Washington’s residents, businesses and industries spend $10 billion on their energy costs each year. n n Washington’s long-term.
Northwest Power and Conservation Council Regional Conservation Update: News From the Front January 24, 2007 Tom Eckman Northwest Power and Conservation.
Bonneville Power Administration BPA Debt Restructuring Presentation to the Energy Northwest Board Audit, Legal, and Finance Committee March 28, 2002.
BUILDING STRONG SM 1 Columbia River Salmon and Federal Columbia River Power System Rock Peters Senior Program Manager.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Smart grid in the Pacific Northwest – best practices from the largest demo project in.
Oregon Rural Electric Coop Directors Education Seminar The Future for BPA Jim Litchfield June 2,
Trans-boundary issues in the Pacific Northwest.
Columbia River Basin White Sturgeon Framework Lynn Palensky Northwest Power and Conservation Council Portland, Oregon USA July 2013.
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
Visit by Government Officials from Mozambique COLUMBIA RIVER SYSTEM BRIEFING III U.S. Army Corps of Engineers Northwestern Division North Pacific Water.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 BPA Overview May 2009.
Northwest Power and Conservation Council Action Plan Summary.
1 The Sustainability Network of Washington County January 27, 2010 Jason Eisdorfer Bonneville Power Administration.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
Northwest Power and Conservation Council slide 1 The Columbia River Treaty John Shurts General Counsel Northwest Power and Conservation Council Portland,
Congressional Briefing Winter, Who is Mid-West? Over 250 consumer-owned, not-for-profit electric utilities in the Upper Great Plains Our members.
City of Port Angeles Strategic Planning Workshop for Power Supply June 7, 2011 Scott Corwin Executive Director Public Power Council.
BUILDING STRONG SM Northwestern Division Presented by Lori Rux Chief, Program Support Division June 11, 2009 BPA Direct Funding for Corps Hydropower Projects.
Bonneville Power Administration Significance of Rating Agency Ratings May 2002 Predicisional.
Planning Together to Improve Outcomes for All Students U.S. Department of Education Office of Elementary & Secondary Education (OESE) Office of Special.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
CANADIAN COLUMBIA RIVER FORUM U.S. Flood Control and Operational Perspective Jim Barton, Chief of Corps of Engineers Columbia Basin Water Management Division.
Overview of the Grid Randy Manion, Western Area Power Admin. EPA Clean Power Plan Workshops Farmington, NM, December 7 and 8, 2015 Tuba City, AZ, December.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
State of Solar in North Carolina Amy Heinemann March 7,
Catastrophe Management – An Evolving Strategy Personal Lines Perspective November 15, 2006 Rob Hair Senior State Manager, Allstate Insurance Company.
PRESENTER’S NAME TITLE AMERICAN PUBLIC POWER ASSOCIATION Data from the Energy Information Administration, 2014 and Public Power Statistical Report, 2015.
Strategies for Colorado River Water Management Jaci Gould Deputy Regional Director Lower Colorado Region.
1 Bonneville Power Administration. 2 BPA markets power from 31 federally owned dams, one non-federal nuclear plant, and wind energy generation facilities.
Northwest Power and Power and Conservation ConservationCouncil Extending the PNW’s Legacy Progress to Date & Some Thoughts About Future Opportunities and.
Northwest Power Planning Council Review of Bonneville’s fish and wildlife funding and cost management strategies Briefing to the Northwest Power Planning.
Connecting the Dots: Policy, Markets and the Clean Energy Future New England Restructuring Roundtable Boston, MA September 30, 2016.
ABOUT PUBLIC POWER PRESENTER’S NAME TITLE AMERICAN PUBLIC POWER ASSOCIATION Data from the Energy Information Administration, 2014 and Public.
Efficiency Power Plants
Break-out Session 1A: State audit & controversy
Deregulation Status – U.S. Power
/ March 2015 Net Metering Note: Net Metering rules are being actively discussed in over a dozen state public service & utility commissions.
Recovery Act Smart Grid Funds: $4.5 Billion
Net Metering Note: Net Metering rules are being actively discussed in over a dozen state public service & utility commissions across the country.
Non-Citizen Population, by State, 2011
Dual Eligibles Across the States
Average annual growth rate
Current Status of State Medicaid Expansion Decisions
Presentation transcript:

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Title Sub Title B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Bonneville Power Administration Overview

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2 FCRPS  BPA markets power from 31 Federal Hydropower plants (21 COE/10 BOR) (6,195 avg. MW; 13,934 sustained peak), Columbia Generating Station Nuclear Plant and some non-Federal hydro and wind  More than 80% of the power BPA sells is hydroelectric  BPA accounts for about 33% of the electric power consumed within the region  Canada has 15% of basin area, but provides 30% of 134 million acre feet (maf) average annual flow at The Dalles Federal Columbia River Power System (FCRPS)

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 3 Million Acre-Feet Average 102 MAF January - July Volume Runoff: Columbia River at The Dalles Columbia River Runoff Varies Widely Final for 2011 is

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 4 Columbia Basin Storage Capacity

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 5 Introduction to BPA  1937 Bonneville Project Act Created BPA to market power at cost-based rates with public preference and build transmission system to deliver power.  1961 Columbia River Treaty Enabled 20 million acre-feet of increased water storage via three new Canadian dams and Libby Dam in Montana.  1964 Pacific Northwest Preference Act Established regional preference while authorizing construction of California intertie and surplus power sales outside the Northwest.  1974 Federal Columbia River Transmission System Act Placed BPA on self-financing basis (rates must recover costs) and provided limited borrowing authority from the U.S. Treasury.  1977 Department of Energy Organization Act Transferred BPA to the DOE as “separate and distinct” agency. Key Statutory Provisions

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 6 Introduction to BPA  1980 Pacific Northwest Electric Power Planning and Conservation Act Assure the Pacific Northwest of adequate, efficient, economical and reliable power supply BPA obligation to serve net load requirements of NW utilities, has authority to purchase generating output from electric generation projects. BPA to purchase conservation and renewables where cost effective BPA to provide benefits to residential and small farm customers of investor-owned utilities (residential exchange). BPA to protect, mitigate and enhance fish and wildlife affected by federal hydropower construction and operation. NW Power and Conservation Council to guide power and fish planning for the region. Key Statutory Provisions

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 7 Introduction to BPA  1992 Energy Policy Act Guaranteed open transmission access for wholesale transactions to spur development of wholesale energy market. Authorized FERC to order BPA to provide open, non-discriminatory access to transmission while ensuring BPA’s organic statutes continue in full force and effect.  1996 Omnibus Consolidated Recisions and Appropriations Act Raised interest rate and adjusted principal on BPA’s appropriated debt (for construction of federal power system).  2003 Omnibus Appropriations Bill Increased BPA’s borrowing authority by $700 million to a total of $4.45 billion.  2005 National Energy Policy Act Increased FERC jurisdiction over BPA (and publicly owned utilities) for transmission and power market sales. Established national Electric Reliability Organization (ERO) to establish and enforce mandatory reliability standards on all users, owners and operators of the bulk power system.  2009 American Recovery and Reinvestment Act Granted an additional increment of $3.25 billion in Treasury Borrowing Authority through the American Recovery and Reinvestment Act, bringing the total amount of bonds that may be outstanding at any one time to $7.7 billion. Key Statutory Provisions

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 8 BPA Business Model  BPA is one agency with respect to repaying Treasury debt.  BPA operates separate businesses for setting rates for power and transmission services.  Overlapping, but different customers for power and transmission services.  Consumer-owned utilities have preference rights to Federal power.  BPA operates as an open-access, non-discriminatory transmission carrier.  Important to note that a substantial amount of the wind generation connecting to BPA’s system for transmission service is not sold to BPA or its power services customers. One Agency But Two Businesses

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 9 BPA Business Model  Assure adequate, economical, efficient, reliable power supply.  Ensure transmission access with a high degree of safety and reliability.  Ensure public preference and regional preference.  Fulfill environmental and social responsibilities: Mitigate impacts, protect and enhance fish & wildlife populations affected by the federal hydropower system. Provide regional leadership in conservation and renewable resource development.  Preserve and balance economic and environmental benefits of the FCRPS.  Recover costs through rates. BPA is a self-sustaining non-profit agency. Providing Public Benefits

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 10 BPA Business Model  Publicly Owned Utilities: Entitled to a statutory preference and priority in the purchase of available federal power Northwest Regional Municipalities Public Utility Districts Cooperatives  Investor Owned Utilities: Entitled to the Residential Exchange Program that effectively provides an offset to IOU residential and small farm customers rates Includes Portland General Electric, Puget Sound Energy, PacifiCorp, etc.  Direct Service Industries: BPA is not required to, but may sell power for direct consumption to a limited number of existing industrial companies in the Northwest Aluminum Smelters (e.g. Alcoa, Columbia Falls Aluminum) Chemical and paper, and other metal industries (e.g. Port Townsend Paper Corporation)  Sales outside the Northwest: Public and investor owned utilities in the Southwest and California Sales, purchases, and exchanges of power via the Southern Intertie  Wheeling and other Sales: Network and point-to-point transmission services Generation integration services Conservation and environmental impact analysis services Customers

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 11 FY 2010 FCRPS Operating Revenues (includes interbusiness service revenues) *This information made publicly available by BPA in November 2010 and is consistent with BPA’s FY 2010Annual Report. Variation is due to rounding. Power Services 69% Transmission Services 24% Fish Credits and Other Revenues 7% Revenues (millions) Power Marketing Services$2,11369% Transmission Services$73824% Fish Credits and Other Revenues$2047% $3,055*100 % FCRPS Revenues by Service 2010 Financial Structure

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 12 *This information made publicly available by BPA in November 2010 is consistent with BPA’s FY 2010 Annual Report. Any variation is due to rounding. Power Sales Other Revenues Sales Outside the Northwest $243 million Public and investor-owned utilities in the Southwest and California Direct Service Industries $81 million Publicly Owned Utilities $1,775 million Northwest Regional Municipalities Public Utility Districts Cooperatives Investor-Owned Utilities $134 million Transmission Services $771 million Wheeling and other sales Fish Credits and Other Revenues $172 million 6 FY 2010 Revenues by Customer Groups 4

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 13 Bonds Issued to Treasury $1,616M Wtd. Avg. Int. 4.7% Corps of Engineers Appropriations $2,566M Wtd. Avg. Int. 6.1% Energy Northwest $4,519M Wtd. Avg. Int. 5.2% Bureau of Reclamation Appropriations $629M Wtd. Avg. Int. 6.9% Generation $9,010 million Transmission $3,656 million Lower Snake Fish and Wildlife $232M Wtd. Avg. Int. 7.1% Bonds Issued to Treasury $897M Wtd. Avg. Int. 3.7% *This information made publicly available by BPA January 28, 2011 and is consistent with BPA’s FY 2010 Annual Report. Any variation is due to rounding. Other Non-Federal Projects $450M Wtd. Avg. Int. 4.6% BPA Appropriations $404M Wtd. Avg. Int. 7.2% Other Non- Federal Projects $167M Wtd. Avg. Int. 5.0% Energy Northwest $1,186M Wtd. Avg. Int. 5.2% as of 9/30/2010 $12,666 Million 5.4% weighted average interest Total Liabilities to Federal and Non-Federal Parties Federal Columbia River Power System

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 14 From 2009 EIA State Level Data (rates shown in cents per kilowatt-hour) CT ME NV CA IL MS 7.97 MA NJ OR 8.68 MT 8.93 ID 7.80 MD AZ NH NY WV 5.45 VT FL OH TX CO NM UT 8.48 WY 8.58 OK 8.49 NE 8.52 NC 9.99 MS MN AR 9.14 MO 8.54 WA 7.68 VA BPA STATES KY 8.37 PA WV 7.90 Ranking of Northwest States Idaho: 3 Washington: 4 Oregon: 14 Montana: 15 Average Retail Electricity Rates by State LA. 8.10

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 15 FY Wholesale Energy – Cost Components ($/MWh) (2008$)

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 16 Firm Energy Resources 2010 BPA White Book; November, 2009

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 17 Secondary Revenue from Surplus Sales Net secondary revenue and net sales figures are not final audited values. They are derived from committed transaction data from BPA's Trade Management System, and do not reflect what was actually delivered and billed. Note: secondary revenues increased by sales of additional power supplied under contracts that have since expired

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 18 Energy Efficiency is the priority Resource

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 19 PNW Energy Efficiency Achievements Since 1978 Utility & BPA Programs, Energy Codes & Federal Efficiency Standards Have Produced Almost 4,300 aMW of Savings.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 20 5-Year Regional Public Power Energy Efficiency Targets EE to be accomplished through programs, market transformation, and codes/standards.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 21 Federal Columbia River Transmission System  BPA owns and operates 75% of the Pacific Northwest’s high voltage electrical transmission system.  The system includes more than 15,000 miles of transmission line and more than 200 substations.  The system networks across 300,000 square miles in Oregon, Washington, Idaho, Montana and sections of Wyoming, Nevada, Utah and California.  The system enables a peak loading of about 30,000 megawatts and generates about $690 million a year in revenues from transmission services.  BPA’s Transmission Services operate under an Open Access Transmission Tariff based on FERC’s pro forma tariff as a non-jurisdictional entity.  BPA operates to comply with Electric Reliability Organization standards.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 22 BPA’s high-voltage transmission system  BPA owns and operates 75% of the Pacific Northwest’s high voltage electrical transmission system.  The system includes more than 15,000 miles of transmission line and 285 substations.  The system networks across 300,000 square miles in Oregon, Washington, Idaho, Montana and sections of Wyoming, Nevada, Utah and California.  The system enables a peak loading of about 30,000 megawatts and generates more than $700 million a year in revenues from transmission services.  BPA’s Transmission Business Line operates under an Open Access Transmission Tariff based on FERC’s pro forma tariff as a non- jurisdictional entity. Federal Columbia River Transmission Systems

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 23 Regional Transmission Combined Transmission System

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 24 BPA Fish & Wildlife Objectives  Implement and/or advocate for scientifically based, cost- effective strategies that mitigate for FCRPS (hydro) impacts on fish and wildlife  Deliver public benefits of Columbia River: negotiate and manage mitigation work to achieve best environmental result and dollar value  Advance policy solutions through collaborative working relationships with Regional Entities e.g. Power Council, Tribes, Fish & Wildlife Agencies, Customers, Environmental Groups and other parties

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Northwest Power Act “The Administrator shall use the Bonneville Power Administration Fund to protect, mitigate, and enhance fish and wildlife to the extent affected by development and operation of any hydroelectric project of the Columbia River and its tributaries.” Endangered Species Act Biological Opinions “Each Federal agency shall….insure that any action authorized funded, or carried out by such agency is not likely to jeopardize continued existence…of any endangered species or threatened species…” Non-Listed FISH and WILDLIFE Listed ANADROMOUS FISH RESIDENT FISH WILDLIFE Although BPA has fish and wildlife responsibilities under the Endangered Species Act and the Northwest Power Act, in many cases, both responsibilities can be met in the same set of actions. Fish and Wildlife Legal Mandates Treaty and Non-Treaty Tribal Policy BPA will consult with the Tribal governments prior to BPA taking actions, making decisions, or implementing programs that may affect Tribal resources.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 26 Percentage of Spending Categories Allocated to F&W FY Forecast ($ in Millions ) UNSLICED 50-year Annual Average Hydro Operations Effects (Power Purchases & Foregone Revenues) Fish and Wildlife Integrated Program NWPCC – Annual Average US Fish & Wildlife Service – Annual Average Lower Snake Compensation Plan Corps of Engineers O&M – Annual Average Reclamation O&M – Annual Average 100% 50% 100% ~25% ~7% Depreciation & Interest on COE / Reclamation / USF&WS Capital F&W Investments (based on Plant in Service) Depreciation & Interest on BPA Direct Program Capital F&W Investments 1/ FY data is based on the proposed IPR spending levels as of May 13, Total $ FY Actuals ($ in Millions ) FY Forecast ($ in Millions ) Total Annual Average Cost of BPA Fish & Wildlife Actions 1/

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 27 Wind Generation Capacity in the BPA Balancing Authority Area

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 28 Wind Generations is Variable Red = Load Blue = Wind Generation And Unrelated to Load

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 29 Climate Change Actions  Commitments under the 2008/2010 BiOps are setting the stage for better understanding of climate change impacts and responses.  Existing BiOp and F&W Program actions in the tributaries and estuary are helping to mitigate for climate change through protection of riparian areas, creation of salmon refuges, and water acquisition to protect instream flows.  The 2010 Supp. BiOp calls for measures to monitor climate change impacts and target fish and wildlife habitat efforts to address those impacts.  BPA’s “climate change adaption plan” approved by agency executives July 2012 to prepare for potential impacts of climate change on our business operations.