CLIC CDR in relation to SiD Lucie Linssen SiD discussion at IWLC CERN October 18 th 2010 1 LL, SiD meeting at IWLC, 18/10/2010.

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

SiD Optimization Studies Jan Strube Pacific Northwest National Laboratory.
Charge to the SiD Workshop Andy White University of Texas at Arlington 1/16/20131Charge to SiD Workshop A. White.
The SiD concept Yannis Karyotakis LAPP Annecy / IN2P3 March 21 st ‘05.
Silicon Detector: Simulation & Reconstruction Norman Graf SiD Advisory Meeting September 14, 2009.
Computing plans for the post DBD phase Akiya Miyamoto KEK ILD Session ECFA May 2013.
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
SiD’ and CLIC CDR preparations Outline: Introduction Description of SiD’ detector R&D in software/hardware for SiD’ Preparations for the CLIC CDR Conclusions.
General news CLIC detector and physics meeting at LC2013, May 30 th 2013 Lucie Linssen L. Linssen, CLIC detector & physics meeting, May 30th
HCAL and PFA Studies Ray Cowan Peter Fisher ALCPG 2009 University of New Mexico October 2, 2009.
Charge to the SiD Workshop Andy White University of Texas at Arlington.
Mark Thomson Timing, Tungsten and High Energy Jets.
F. Richard LAL/Orsay CLIC-ILC connections on Detectors PAC Paris meeting October 20, 2008.
Lucie Linssen, CLICdp, (bi-)monthly meeting, July 21st CLICdp news CLICdp (bi-)monthly meeting July 21 st 2014.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
1http:// 22/4/2010 Introduction WG4 Outline: Mandate of the WG Timescale How to proceed? Vertex detector requirements Collecting input on.
Summary of Simulation and Reconstruction Shaomin CHEN (Tsinghua University)  Framework and toolkit  Application in ILC detector design Jupiter/Satellites,
Sim/Recon DBD Editors Report Norman Graf (SLAC) Jan Strube (CERN) SiD Workshop SLAC, August 22, 2012.
Preparing for the SiD LoI SiD Parallel Session TILC08 March 5, 2008 John Jaros.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
Introduction / CLICdp news (CLICdp - CLIC detector and physics) -- CLICdp meeting at AWLC14, 13 May Konrad Elsener, CLICdp session, AWLC14 1 Konrad.
ILC DBD Common simulation and software tools Akiya Miyamoto KEK ILC PAC 14 December 2012 at KEK.
LCD Monthly Meeting – Upcoming Conferences 2012 Michael Hauschild, 19-Mar-2012, page 1 Upcoming Meetings, Workshops, Conferences 2012 LC TPC Collaboration.
SiD performance for the DBD Jan Strube CERN. Overview Software Preparation (CERN, SLAC) Machine Environment (CERN, SLAC) Tracking Performance (C. Grefe)
1Frank Simon ALCPG11, 20/3/2011 ILD and SiD detectors for 1 TeV ILC some recommendations following experience from the CLIC detector study
General news, future LC organisation, update on CDR Vol3… Lucie Linssen L. Linssen, CLIC physics and detector monthly meeting, May 14th
Software Common Task Group Meeting Akiya Miyamoto 6-June-2011.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
CLICdp news -- CLICdp 2-day meeting June 10 th Lucie Linssen, CLICdp, 2-day meeting, June 10th
Coil and HCAL Parameters for CLIC Solenoid and Hadron-calorimetry for a high energy LC Detector 15. December LAPP Christian Grefe CERN.
Software Overview Akiya Miyamoto KEK JSPS Tokusui Workshop December-2012 Topics MC production Computing reousces GRID Future events Topics MC production.
Lcsim software: status and future plans ECFA-LC DESY May 28, 2013 Norman Graf (for the sim/reco group)
Update on CLIC_ILD detector studies necessarily incomplete, but attempting to give you a “glimpse” presented by K. Elsener (CERN), for the CLIC detector.
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Eugene October
SiD workshop, January 16-18, 2013 H.Weerts Building the SiD collaboration H.Weerts Argonne National Laboratory Proposal & suggestions.
How to Get Involved in SiD Richard Partridge Brown / SLAC LCWS 07.
Jet Tagging Studies at TeV LC Tomáš Laštovička, University of Oxford Linear Collider Physics/Detector Meeting 14/9/2009 CERN.
Software Common Task Group Report Akiya Miyamoto ILC PAC POSTECH 3 November 2009.
Benchmarking Production Jan Strube (CERN) for the SiD Production team.
1http:// Lucie Linssen LCWS /3/2010 SiD and CLIC Outline: Adaptation of SiD detector for CLIC Use of SiD software for CLIC Tracking.
LCWS11 – Tracking Performance at CLIC_ILD/SiD Michael Hauschild - CERN, 27-Sep-2011, page 1 Tracking Performance in CLIC_ILD and CLIC_SiD e + e –  H +
Dominik Dannheim (CERN), André Sailer (HU Berlin / CERN) Beam-induced backgrounds in the CLIC detector models ALCPG Workshop March 2011 Eugene,
4th Concept Detector G P Yeh TILC08, Sendai, Japan Mar. 3-6, 2008.
Report from SB2009 Working Group Akiya Miyamoto 8-July-2010 DESY ILD Software and Integration Workshop.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
Report from the spokesperson -- CLICdp IB meeting Febr. 5 th Lucie Linssen, CLICdp IB, February 5th
General news LCD monthly meeting 12/8/2013 L. Linssen, LCD monthly meeting, 12 Aug August 8 th 2013.
General news… Monthly meeting, CLIC physics and detector study, 24/9/2012 Lucie Linssen L. Linssen, CLIC physics and detector, Monthly 24/9/
Lcsim software: status and future plans ECFA-LC DESY May 30, 2013 Norman Graf (for the sim/reco group)
General news LCD monthly meeting 22/4/2013 Lucie Linssen L. Linssen, LCD monthly meeting, 22 April
Generator status Akiya Miyamoto KEK 23 February 2016.
CLIC detector & physics study -- Intro and general news -- Lucie Linssen Lucie Linssen, CLICdp 2-day meeting, October 1st Detector model CLIC &
SiD: Simulation and Reconstruction
STFC-Rutherford Appleton Laboratory
Linear Collider Detector (LCD) project overview
Layout of Detectors for CLIC
Conferences, Workshops and other Meetings – LCD participants & talks
slicPandora: slic + pandoraPFANew
News item and introduction of working groups
CLIC detector at SiD meeting 28/3/2010
Update on Upcoming Meetings, Workshops, Conferences 2012
Starting up the CLIC detector design study CLIC Workshop, 15. Okt 2008
The SiD Detector Outline Overview
Calorimetry for a CLIC experiment
January Collaboration Meeting
ILD Optimisation: towards 2012 University of Cambridge
CLIC Detector CERN Status + plans
Sim/Rec/Opt Session Summary
CLIC Detector Synergies with SiD R&D
Presentation transcript:

CLIC CDR in relation to SiD Lucie Linssen SiD discussion at IWLC CERN October 18 th LL, SiD meeting at IWLC, 18/10/2010

Special CLIC requirements Lucie Linssen SiD workshop, Argonne June 6 th LL, SiD meeting at IWLC, 18/10/2010 Slide presented in Argonne June 2010

Some requests to SiD for the CLIC CDR preparation We want to continue working in a good relationship with SiD ! The support we request from SiD for the CLIC CDR will be mostly in the domain of: Support/consultation on software tools and simulations Editing support: –main editor Harry Weerts, (Marcel Stanitzki) –chapter editors: NN, Marcel Demarteau, Tim Nelson, Andy White, Marco Oriunno, Jan Strube, Marty Breidenbach Some help with the cost All other help is most welcome ! CDR Authorship The CLIC CDR will be based on vast amounts of work, previously carried out by members of SiD. All SiD members will be given the opportunity to sign the CLIC CDR. 3LL, SiD meeting at IWLC, 18/10/2010 Slide presented in Argonne June 2010

Support/consultation on software tools and simulations: Generator level –We would like to participate in the current effort of exchange of information between ILD and SiD, and in the attempt to automatize some of the procedure Grid production –Support and exchange of information (we will use DIRAC tool) –Help with issue of duplicate “ILC VO” ? CLIC_SiD CDR baseline –Based in sidloi3 SiD tracking tools –Continued consultation/help with adaptation of tracking tools Particle flow –Continued help interfacing PandoraPFA_new to the SiD software –Support during the debugging/checking/adaptation phase Physics analysis –Support and help for analyses that resemble prior SiD work 4LL, SiD meeting at IWLC, 18/10/2010 Slide presented in Argonne June 2010

5LL, SiD meeting at IWLC, 18/10/2010 CLIC “editing” status Status of CDR preparation following dedicated meetings for each of the chapters

Event generation and grid production Since June: Participation of CLIC (Stephane Poss, Marco Battaglia) in “ILC common Monte Carlo data subgroup” (Tim, Akiya, Mikael B.)=> advice and streamlining of tools and methods Thorough assessment of gg=> hadrn background generation by Tim Barklow and Daniel Schulte Grid production using Whizard (ILCDIRAC, Stephane Poss) Very good progress. Thank you very much ! Continued collaboration will be highly appreciated Link to USA version of “ILC VO” still missing. 6LL, SiD meeting at IWLC, 18/10/2010

SiD tracking Since June: Visit of Christian Grefe to SLAC => with help of Rich Partridge and Norman Graf a number of tracking issues were solved. On the CLIC side, Christian Grefe and Blai Pie Valls use/assess SiD tracking for the CDR. Tracking issues related to muon ID (PFO, Pandora adaptations) => follow tracking in flipping B-field. => Currently there are still SiD tracking issues on “critical path” for the CDR. LCFI optimisation (b’s from light Higgs decay) at high energy currently ongoing by Tomas Lastovicka (Prague). Continued help from SiD tracking experts strongly needed. Planned visit of Norman Graf and Jeremy McCormick to CERN, first week of November (for outstanding tracking and PFA issues). 7LL, SiD meeting at IWLC, 18/10/2010

Pandora PFA and SiD Since June: Essentials of Pandora framework in SLiC seem to work. Thanks to work of Norman Graf et al. in collaboration with Cambridge team. Performance assessment, calibration and debugging: –Currently part-time involvement of: Marcel Stanitzki, Jan Strube, Peter Speckmayer, Christian Grefe, Angela Lucaci-Timoce Pandora PFA use of SiD detector is currently restricted to analog scintillator-based HCAL option Full check-out and optimisation of Pandora PFA in SiD is on the critical path for the CDR. Additional resources are required. (Jet energy calibration, energy resolution, particle ID), etc. 8LL, SiD meeting at IWLC, 18/10/2010

~6.2m 9LL, SiD meeting at IWLC, 18/10/2010 CLIC_SiD simulation geometry (1) Changes to the ILC detectors: 20 mrad crossing angle Vertex Detector to mm inner radius, due to Beam-Beam Background HCAL barrel with 7.5 Λ i with 1 cm tungsten plates HCAL endcap with 7.5 Λ i with 2 cm steel plates Forward (FCAL) region adaptations, including QD0 support and stabilisation z=0 ~7.0m “CLIC_SiD”

CLIC_SiD simulation geometry (2) 10LL, SiD meeting at IWLC, 18/10/2010

CLIC_SiD simulation geometry (3) Input from SiD management required to guide choice on: HCAL technology option for simulation model CLIC_SiD –Crucial to have working software very soon (including PFA performance) for the model chosen Vertex detector layout choice –See IWLC talk of Dominik Dannheim –Layout choice, # material, pixels size, analog/digital readout 11LL, SiD meeting at IWLC, 18/10/2010

Timeline simulation/reconstruction tools readiness for CLIC CDR 12LL, SiD meeting at IWLC, 18/10/2010 … extracted from latest minutes of CDR Benchmark working group Deadline=now for defining geometry and for readiness of simulation/reconstruction

CLIC CDR benchmark studies There is an imbalance between channels assessed for CLIC_ILD and CLIC_SiD 13LL, SiD meeting at IWLC, 18/10/2010

CERN LCD group and ILC DBD The CERN LCD group plans to participate in ILC DBD efforts (SiD and ILD) after the CLIC CDR –Fair sharing of efforts between ILD and SiD –Preference for common issues SiD/ILD/CLIC –The more similar the software frameworks get, the better for all of us. We currently see participation in the domains of: –Adaptations of ILD and SiD for the 1 TeV case –Benchmark studies –DBD editing CERN LCD resource level for dedicated DBD work still to be defined CERN LCD is currently preparing a hardware R&D program (tungsten HCAL, CLIC vertex detector technology, solenoid R&D, QD0 stability tests, power pulsing –Opportunities for collaboration with ILC in these areas 14LL, SiD meeting at IWLC, 18/10/2010