IARC Requirements and Status Oct 5, 2009 R Kephart.

Slides:



Advertisements
Similar presentations
District Agreement Process Temi Latinwo Federal Aid Agreement Technician.
Advertisements

Overview of ComEd Energy Efficiency Programs
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
Financing Infrastructure 2014 Governor’s Conference on Economic Development Tan Tar A Resort / Sept. 5, 2014.
I.The Building/Remodeling/ Renovating Project NSSED North Shore Academy (NSA) and Administration Office Building/Remodeling/Renovating Project.
November 1, 2012 HB 592 REVIEW Revisiting Ohio’s Comprehensive Solid Waste Law Ohio EPA-SWMD Workgroup.
South Carolina Research Universities An Assessment of Commercialization and Entrepreneurial Activities.
Overview Illinois Accelerator Research Center (IARC) July 2010 R Kephart.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Campus Energy Efficiency Fund PERC Fall Conference and Annual Meeting Climate Change Panel Joyce Ferris October 29, 2013.
Multi-Modal Transit Center at Taylor Street: Project Overview and Uses for the Upper Floors Public Forum October 16, 2013.
Unleashing Entrepreneurship Service and Investment Innovations E+Co Christine Eibs Singer 383 Franklin Street Bloomfield, NJ, USA.
1 IACRAO 68TH ANNUAL MEETING Racing Towards Tomorrow..... Racing Towards Tomorrow.....
Technical Assistance Program TAP - Industrial Energy Efficiency Services Presentation of TAP’s 2005 – 2006 Industrial Energy Efficiency (IEE) Project In.
OUR MISSION And OUR PUPOSE What Is Economic Development? Economic development in its simplest form is the creation of economic wealth for all citizens.
Board Meeting LEO Meeting.  President Shirley of OSU-OKC is the Governor’s Secretary of Education and Workforce  Oklahoma State University.
House Economic Affairs Committee Presented by: Doug Darling, Executive Director, Department of Economic Opportunity Wednesday, September 21, 2011.
Presented to: By: Date: Federal Aviation Administration Changes in Reimbursable Agreements 31 st Annual Airports Conference V Thompson & R Farrell, Lead.
Convention Center Community Coalition 1. Time Line 2008: Feasibility Study by CS&L May 2009: Follow-Up Data April 2010: Appleton Council/Mayor Appoint.
Local Revitalization Financing District Wenatchee Waterfront.
US Cavities Status and Plan Mark Champion 01 October 2009.
Presented to: Aerospace Control and Guidance Systems Committee By: Stan Pszczolkowski, Manager, System Analysis Division Date: March 1, 2006 Federal Aviation.
Grants Morgan B. Johnston, E.I.T. Sustainability Coordinator, Facilities & Services University of Illinois at Urbana-Champaign Big Ten Environmental Stewardship.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Stanford Technology Ventures Program Slide 1 State Policy Academy on Entrepreneurship New Orleans, July 16, 2001 “Human Capital.
New Incentives for Energy Efficiency William S. Haas Energy Division Representative.
TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
TOWN OF WALPOLE FACILITIES PLAN UPDATE SPRING ANNUAL TOWN MEETING MAY 7, 2014.
Fermilab Master Plan Overview Presentation Mission Support Organization Planning Winter Workshop Feb 20, 2013.
Illinois Accelerator Research Center (IARC) Bob Kephart IARC Usage.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
IL PHA EFFICIENT LIVING ENERGY PROGRAM GUIDELINES University of Illinois at Urbana-Champaign DCEO Northern Illinois Trade Ally Rally | July 24, 2014.
5/16/11 IARC RDK All experimenters mtg1.  A new building will be constructed near CDF. The Office Technical & Education (OTE) building is part of the.
Griffiss Institute Center for Information Assurance.
1 FY County Manager’s Recommended Capital Budget July 18, 2006.
Introduction to The Grant Center Fitchburg State University.
Resource Portfolio Management TASSCC Annual Conference August 11, 2008 Department of Aging and Disability Services Information Technology.
1 Whatcom County Public Works Whatcom County Public Works GOOSEBERRY POINT LEASE STATUS & UPDATE OCTOBER 13, 2009.
Challenges & Issues for SBNE Nigel S. Lockyer 4/4/14.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
IARC Milestones completed Sept 2011: End of Tevatron Run, FESS obtains ~full access to infrastructure at CDF, PPD begins D&D in CDF assembly bldg Sept.
Office of Science (SC) Overview John Yates Office of Operations Program Management, SC-33 Office of Science Briefing for DOE FIMS Training at ANL – May.
1 State Broadband Data and Development Ohio GIS Conference September 18, 2009 Katrina Flory Ohio Department of Administrative Services Office of Information.
Basic Grant Writing John Hulvey Director – Sponsored Programs Office of Sponsored Programs Administration and Accounting.
A Look at the Research Foundation of SUNY We are Here To Help You!
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Symposium On WEATHER INFORMATION FOR SURFACE TRANSPORTATION “Preparing for the Future: Improved Weather Information for Decision-Makers” December 4 - 6,
DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health National Cancer Institute Frederick National Laboratory is a Federally Funded Research.
Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, CFS EDR FNAL Kick-Off Planning.
1 McMaster Innovation Park Executing on a Vision Presentation to the Kirkendall Neighbourhood January 10 th, 2008 Zach Douglas.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Smart Schools Bond Act LAURENS CENTRAL SCHOOL. What is the Smart Schools Bond Act?  The Smart Schools Bond Act (SSBA) authorized the issuance of $2 billion.
Communications and Government Affairs. Overview Funding Outlook and Congressional Update – Norm Peterson (ANL) – Scott Sudduth (UC) Accelerators for the.
Enabling Building Efficiency: The NYC Urban Technology Innovation Center TIMOTHY CROSS, COLUMBIA ENGINEERING IEEE INNOVATION DAY POLYTECHNIC INSTITUTE.
Image courtesy of Oak Ridge National Laboratory Eric R. Colby † Office of High Energy Physics Office of Science U. S. Department of Energy Office of Science-Led.
HAPEVILLE WIRELESS NETWORK STATUS REPORT. Project Background The Hapeville Wireless Network will use wireless mesh technology that will be implemented.
MASON PUBLIC SCHOOLS Bond Committee Meeting #1 August 9, 2016.
FNAL SCRF Review R. Kephart. What is this Review? FNAL has argued that SCRF technology is an “enabling” accelerator technology (much like superconducting.
Guaranteed Energy Savings Performance Contracting
Forsyth County 2016 Bond Referendum
Report on plan to produce an Engineering Design Report
Project Goals Leverage one of our unique CSU Dominguez Hills assets—our underutilized land—to advance the university mission and increase student success.
Kincaid Hall Renovation
Northwest Hospital Childbirth Center Pre-submittal Meeting
OCSTA 2017 Regional Meetings Nick Milanetti, Executive Director
Metropolitan mayors Caucus, Environment Committee Meeting: Engaging Constituents in Energy Efficiency Illinois Department of Commerce & Economic Opportunity.
Capital Improvement Plans
February 22, 2018 Hosted by Pulford Community Living Services
Presentation transcript:

IARC Requirements and Status Oct 5, 2009 R Kephart

The Illinois Capital bill is law It contains $ 20 M for the IARC building as a grant from DCEO to be funded with sale of bonds Less than the $ 35 M request, unlikely to get more from the State  try to make a viable plan with $ 20 M The Legal office and Finance office are in contact with ANL. We intend to mirror the process they have followed for other projects funded by the State. Norm Peterson at ANL suggest our next step be the preparation of a “Statement of Work” for DCEO including the conceptual design, cost estimate, and funding profile. Norm tells us we should do that ASAP to get to the front of the line for funding via bond sales. John Barr from DCEO has provided what should be in the package we submit

DCEO I would advise you to develop a high level project plan that can be shared with DCEO management and the Governor's Office to get the process started. I would suggest the following: –1) Project Executive Summary –2) Project Impact -Federal and private sector research funding (leverage) -IL Technology Infrastructure Resource -Construction / Permanente R&D Jobs –3) Project Budget –4) Project Timeline –5) Any Other Issues/Benefits Once we have conceptual agreement regarding the project parameters then we can work with you to develop a comprehensive project Scope of Work and Budget for the project. I would be happy to be a point of contact to get the ball moving. Please let me know if you have any questions or need more information at this point. Thank you. John Barr Illinois Department of Commerce and Economic Opportunity 100 West Randolph, Suite Chicago, IL

IARC Primary Goals IARC is funded via grant from Illinois Department of Commerce and Economic Opportunity. Basic goal is to make Northern Illinois a center for accelerator development and initiate/promote/support related industry in Illinois. IARC to provide SRF infrastructure, office space, and support facilities that will increase the probability that new accelerators like Project X and ILC are sited at Fermilab and allow industry to more easily work with us. IARC was also sold as a mechanism to support training of scientists and engineers in accelerator physics and related technology via work with local universities. We must maintain these basic goals.

Possible Secondary Goals Office space for TD/AD/APC Home for Proj X, or Illinois Accel institute? Infrastructure to support construction of Px, incl specialized infra for a CW linac Additional lab conference rooms Public Outreach: Green building; prominent; visually appealing Consolidate central FNAL campus

NIU Connection Jerry Blazey ( NIU) talked to Mike Fortner. Believes we can get state funds for 1-3 full time positions paid for by the state with operating funds. Phillipe Piot has $ 750 K to develop advanced sources but so far has not been able to interest ANL in hosting this effort. Thinks it should go to A0, then IARC. Engage IIT, NIU and perhaps U of C, Northwestern, and/or U of I Champaign to create an accelerator education program in IARC (role for APC ?) New FNAL-NIU joint appointment = Roman Pachal (sp?) replaced Court Bohn. Thinks we should enlist his help Consider hosting the Illinois Accelerator Institute a joint FNAL-ANL venture in IARC. (Rog Gerig is ANL contact)

Explored 11 different locations Went through these in meeting with Pier, Young-Kee, FESS in August Agreed to focus on two general locations –To the West of Wilson hall (stand alone IARC that must fit within $ 20 M budget) –Variants that assume re-use of the CDF building to provide IARC high bay and assembly space (some or all of CDF)

IARC Sites Examined 10 a,b 11 a,b

Sketch up models Examined each location Compared what you can afford for $ 20 M for a “stand alone” IARC complex near WH vs an IARC building assuming re-use of the CDF building Met again with Pier, Young-Kee, and AD’s Sept 12 to discuss pro’s-con’s of these solutions

Stand alone

Reuse CDF CDF ~20,000 sq ft high bay, ~ 25 offices, ~6000  sq ft low bay tech space, conf rooms,deep pit, 1.5 MW installed power, ICW, LCW, cryogenic refrigerator, etc

IARC bldg combined with CDF Meets/exceeds the goals of IARC Provides a powerful addition to the lab industrial complex and the lab in general Useful to host Px, APC, portions of AD (e.g. electrical group) or many other future projects Helps tie the campus together Provides needed high quality office space Could “look” like FNAL yet makes a dramatic modern architectural statement

Next Steps Sept 21 Director decided we should proceed with a draft SOW assuming IARC on West side of CDF. Guidance from Director –Include value added by re-use of some or all of CDF building ($ 30 M?) –Assume additional FNAL “start up funds” ~ $ 550 K will be available –Assumes $ 5 M for parking lots, roads, utilities, etc. funded as GPP project to maximize funds for actual IARC building construction –Assumes FNAL decommissions CDF and refurbishes bldg as required Working on writing the Statement of Work to request the DCEO grant. –Draft from Kephart, & FESS, with comments from Chrisman, Congers, Leonard incorporated. –Current draft to Pier and Young-Kee for comment –Still needs some numbers filled in by FESS Need to give draft to DOE next then DCEO for comment Goal is to submit to DCEO ASAP for funding in spring 2010

IARC for SOW