Signal Feedthrough Progress Report New FEA Results on Pin Carriers Vacuum Cable Development in Canada Leak Test Station and Assembly Station in Victoria.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

Fz-Juelich, 03/09/2013V. Carassiti, P. Lenisa 1 STATUS REPORT.
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Liquid Hydrogen Absorber
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
22 September 1998 LAr WeekM. Lefebvre Signal Feedthrough Progress Report Pin Carriers FEA Update Presented by Terry Hodges TRIUMF and University of Victoria.
EMB PAR, 23 nov P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in.
Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
UNILAC SIS 18 SIS 100/300 HESR Super FRS NESR CR RESR Sergey Kozub Institute for High Energy Physics Protvino, Russia SIS300 meeting 19 March, 2009 Sergey.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Richard KeelerDepartment Review, April Particle Physics Group Faculty and Researchers Research directions –Overview –OPAL, ATLAS, BaBar Infrastructure.
TRIUMF and the University of Victoria Joint meeting of Operations Committee and the Board of Management June 28, 2002 Overview of Victoria particle physics.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
October 16th 2000 NSERC Site Visit M. Lefebvre1 ATLAS at the University of Victoria M. Lefebvre NSERC Site Visit October 16th 2000 The ATLAS Experiment.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
19 May 1999 LAr WeekM. Lefebvre Endcap Signal Feedthrough Steel Order –Order fully coordinated with BNL –The order was ready to go Monday May 10th to lowest.
ASSO HEC 2001 Organisation & Responsibilities Chris Oram Oct 2001.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Spectrometer Solenoid – Quench Analysis The LBNL version of the quench model has been further refined - Heng Pan is finishing various quench scenarios.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
CLAS12 Drift Chamber Prototyping
1 SVT Status Update Yuri Gotra CLAS12 Silicon Vertex Tracker TCB Meeting March 13, 2015.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Dec
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
LBNF 1 LBNF/DUNE – Construction Summary. LBNF Far Site Facilities Scope and Requirements LNG Membrane cryostat is an European technology. CERN has now.
Installation of the T600 at Fermilab Fermilab, February 15,
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Teleconf ACS – FREIA 28th March 2017
Cryoplant Controls Installation
Installation of the T600 at Fermilab
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Teleconference ACS – FREIA 18th April 2017
Teleconference ACS – FREIA 10th May 2017
Teleconference ACS – FREIA 31st October 2017
ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
ATLAS Canada Collaboration
ATLAS Canada Alberta Carleton McGill Montréal Simon Fraser Toronto
UK CMS Oversight Committee Mtg
SNS PPU Cryomodule Instrumentation
Limited Streamer Tube Project Summary
ATLAS Liquid Argon Calorimeter Signal Feedthroughs
SNS PPU Cryomodule Instrumentation
ICARUS Internal Cryogenic Sensors
Presentation transcript:

Signal Feedthrough Progress Report New FEA Results on Pin Carriers Vacuum Cable Development in Canada Leak Test Station and Assembly Station in Victoria Integration Issues Terry Hodges TRIUMF and University of Victoria British Columbia, Canada ATLAS LAr Week 8 Dec 1997

8 Dec 1997 LAr WeekM. Lefebvre Vacuum Cable Development in Canada Signal Cables All-Flex design: rigid part of the connector is no longer an integral part of the microstrip cable Aim at simpler and cheaper design Design work: E. Neuheimer (CRPP Carleton) G. Hoeppel (Strataflex, Toronto) We visited Strataflex 24 Nov 97 Order of prototype signal strip lines placed in Dec 97 Two connector designs will be tried: wire mesh (BNL/CRPP design) plated plastic (Strataflex proposition) Expect first complete cable prototypes late January 98

8 Dec 1997 LAr WeekM. Lefebvre Vacuum Cable Development in Canada HEC Low Voltage Cables HEC requires special vacuum cables for the low voltage Our current understanding: one HEC feedthrough unit per quadrant 8 modules per quadrant 5 motherboards per module 6 lines (3 LV and their returns) per mother boards Total of 240 lines per quadrant 6 X 64 = 384 pins are reserved per feedthrough unit Our baseline design uses 70  m ground and signal traces A 60 degrees rise corresponds to about 410mA We need to know before end January 98 if this is what is needed

8 Dec 1997 LAr WeekM. Lefebvre Leak Test Setup in Victoria Leak detection using He leak detector supported by an RGA Leak detector services warm and cold test stations Cooling by cryo-cooler or LN 2 Parts ordered and received: He leak detector operational Assembly started

8 Dec 1997 LAr WeekM. Lefebvre Assembly Jig in Victoria Rotation about horizontal and vertical axis possible Various assembly scenarios under study Parts ordered

8 Dec 1997 LAr WeekM. Lefebvre Endcap Integration Issues Feedthrough assembly skirt Details of the bi-metallic junction used dimensions need to be known to finalize tooling Detail drawing of the feedthrough region of the endcap cryostat

8 Dec 1997 LAr WeekM. Lefebvre Endcap Signal Feedthrough Project Canadian Responsibilities Design Fabrication Commissioning Transport Assistance during installation: Assistance during welding on the cryostat Assistance for leak testing during installation DC Electrical tests during the installation Grey areas which require more discussion: Heater power distribution Flange temperature monitoring Connection to vacuum manifolds

8 Dec 1997 LAr WeekM. Lefebvre Endcap Signal Feedthrough Team Paul Birney Senior Technician, TRIUMF Leak test station Assembly tooling Margret Fincke Research Associate, Victoria Electric test station Vacuum cable development Terry Hodges Chief Engineer, TRIUMF Feedthrough unit design Finite element analysis Richard Keeler Faculty, Victoria Test stations Vacuum cable development Roy Langstaff Senior Draftsman, TRIUMF Feedthrough unit design Procurement issues Michel Lefebvre Faculty, Victoria Project leader Mark Lenckowski Draftsman, TRIUMF Ernie Neuheimer Research Scientist, CRPP Carleton Vacuum cable development Paul Poffenberger Research Associate, Victoria Leak test station Vacuum system Randy Sobie Faculty, Victoria DAQ One technician to be hired in 1998 to work on the test stations, and the prototype assemblies.

8 Dec 1997 LAr WeekM. Lefebvre Endcap Signal Feedthrough Project Top PBS Levels 4.nfor ATLAS Canada corresponds to n in the TDR

8 Dec 1997 LAr WeekM. Lefebvre Endcap Signal Feedthrough Project Series Assemblies Details

8 Dec 1997 LAr WeekM. Lefebvre Endcap Signal Feedthrough Project Project Setup Details