Silicon Front End Electronics and Data Acquisition System for PHOBOS experiment at RHIC Pradeep Sarin for PHOBOS Collaboration October 05 2000 Fall 2000.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Test Setup for PHOBOS Hybrid/Module Testing at MIT Pradeep Sarin 31 July 98.
ESODAC Study for a new ESO Detector Array Controller.
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
Data Acquisition System for 2D X-Ray Detector Beijing Synchrotron Radiation Facility (BSRF) located at Institute of High Energy Physics is the first synchrotron.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Manfred Meyer & IDT & ODT 15 Okt Detectors for Astronomy 2009, ESO Garching, Okt Detector Data Acquisition Hardware Designs.
Andrei Sukhanov, BNL 1 DAQ status. Performance of the Mercury part of the DAQ = 234 Hz. Receiving program on vmesparc receives the event from Mercury and.
PHOBOS DATA FLOW (1) THE WIRES RHIC fec dmu mercury system event builder event buffer online data logger rcf slow control oracle db with disk TOF & Trigger.
TRIGGER-LESS AND RECONFIGURABLE DATA ACQUISITION SYSTEM FOR POSITRON EMISSION TOMOGRAPHY Grzegorz Korcyl 2013.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
DE/dx measurement with Phobos Si-pad detectors - very first impressions (H.P Oct )
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
EUDRB: the data reduction board of the EUDET pixel telescope Lorenzo Chiarelli, Angelo Cotta Ramusino, Livio Piemontese, Davide Spazian Università & INFN.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
3/3/991 Minutes from the fall 98 DAQ meetings: TOF crate will always be running in the single event mode Silicon crate may pipeline several (4?) events.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Florida Institute of Technology, Melbourne, FL
5/9/03Andrei Sukhanov. Phobos BWMeeting1 Andrei Sukhanov – measurements, analysis Ioury Sedykh – software, calculations Piotr Kulinich – measurements,
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Scott Mandry, EUDET JRA1 Meeting, DESY 30 th January ISIS1 Testbeam EUDET JRA1 Meeting, DESY 30 th January 2008 Scott Mandry LCFI Collaboration.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
Update on works with SiPMs at Pisa Matteo Morrocchi.
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
Layout and test of silicon pad detectors for the PHOBOS experiment at RHIC Heinz Pernegger for the Phobos collaboration Massachusetts Institute of Technology.
FPGA based signal processing for the LHCb Vertex detector and Silicon Tracker Guido Haefeli EPFL, Lausanne Vertex 2005 November 7-11, 2005 Chuzenji Lake,
IEEE Real Time 091 Data Acquisition System for Multi-channel Gas Detector Hongyu ZHANG, Kejun ZHU, Haitao ZHU Institute of High Energy Physics,
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
"North American" Electronics
DAQ ACQUISITION FOR THE dE/dX DETECTOR
MPD Data Acquisition System: Architecture and Solutions
Evidence for Strongly Interacting Opaque Plasma
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
PADME L0 Trigger Processor
CoBo - Different Boundaries & Different Options of
Large CMS GEM with APV & SRS electronics
FPGA-based Time to Digital Converter and Data Acquisition system for High Energy Tagger of KLOE-2 experiment L. Iafolla1,4, A. Balla1, M. Beretta1, P.
Example of DAQ Trigger issues for the SoLID experiment
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
The CMS Tracking Readout and Front End Driver Testing
The LHCb Front-end Electronics System Status and Future Development
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
Presentation transcript:

Silicon Front End Electronics and Data Acquisition System for PHOBOS experiment at RHIC Pradeep Sarin for PHOBOS Collaboration October Fall 2000 DNP Meeting

Plan Description of Silicon Detectors/FEE : (Silicon modules + Viking + FEC = 2 slides ) Description of Data path : (DMU + MDC + Mercury RACEway + Solaris Host) Description of Trigger Management : (Event Manager and Trigger Managers) Performance description: (Si Front-end Noise and stability, Data rates)

PHOBOS Experimental Setup Silicon Pad detectors for measuring charged particles (Multiplicity and Tracking/PID) + Plastic Scintillator for Triggering and TOF 137,000 Silicon Readout Channels 1,300 Scintillator Readout Channels Nominal Interaction Point

Run 5332 Event /31/00 06:59:24 PHOBOS Online Event Display Spectrometer Arm N Spectrometer Arm P Octagon Multiplicity detector Trigger Scintillators N Trigger Scintillators P Not to scaleNot all sub-detectors shown Au-Au Beam Momentum = GeV/c

PHOBOS Readout Scheme Silicon Detector Modules Front End Controllers Silicon Pad detectors ~1500 pads IDE VA and VA - HDR1 Readout Chips ANALOG Data Multiplexer Unit Mercury RACEway/VME Zero Suppression System DIGITAL G-LINK FIBRE-OPTIC Event Builder DISKS 100Mbps UDP Trigger Detectors TOF array LeCroy FASTBUS ADC + TDC modules VME+NIM based Trigger Management 100Mbps UDP ANALOG L0, L1 TRIGGER

Silicon Front End Electronics Double Metal, Single sided, AC coupled, polysilicon biased detectors produced by ERSO, Taiwan VA and VA-HDR1 readout Chips produced by IDE AS 1.2 s peaking time Radiation tolerance to ~ 20 kRad Low Noise (~ 900 ENC/pF) Dynamic Range ~ 100 MIPs VA Biasing and Triggering VA Signal readout and digitization 12-bit ADC (ADS802) VA Calibration Xilinx FPGA Controller VA Monitoring G-LINK Output Trigger Front End Controllers designed and produced by MIT-LNS Electronics Facility (Bernie Wadsworth Group) Low Noise (~ 450 ENC/pF) NO measurable CMN introduced in signal path Each FEC controls upto 6K readout channels 50 MB/s output and double Event buffering Specialized monitoring of VA supply lines to detect radiation induced latchup PREAMP SHAPER OUTBUF FEC p+ Implant n+ Polysilicon Drain Resistor bias bussignal lines vias 0.2um ONO 1.2um ONO 300 m 5k nSi

MVME 2306 MVME 2600 MVME 2306 GigaEthernet to RHIC computing Facility GigaEthernet CPU 4 CPU Local Disc Tape Fast Ethernet Trigger VME FastEthernet SUN HPC 3000 Event Manager TOF+TRIG FASTBUS ADC TDC Trig ADC Trig TDC SFI 340 RACEway Silicon VME Event Manager L0 Manager L1 Manager Event Builder software in ROOT framework Multiplexed Data in from Silicon FEC’s Data in from TOF/Trigger modules Triggers in from Trigger detectors Data Acquistion System Online System ROOT framework

Worker 1 CN Worker 2 CN RAM Master CN L1/ L2 Trigger Event # Send Command Words and Event Tag to MDC. Disable Trigger. Synchronize the Worker CN’s by sending Event info Receive ACK from all Worker CNs for receipt of data for event Enable L2 trigger RAM Worker n CN Send ACK to Master CN. Pedestal Subtraction Pedestal + GAIN data for Group of FECs Zero Suppression Common Mode Noise Correction? Send Size of ZSS data to Master CN Collect all packets of Zero Suppressed data and join them together Write Zero Suppressed Events to VxWorks Host. RACEway transfer (DMA) ~ 140MB/s VME BackPlane ~ 80 MB/s MVME 2604 Interface to Event Builder RAM VxWorks RIN-T (FIFOs) Raw Event Data from FEC ROUT (FIFOs) ZSS Event Loop in Silicon DAQ

Trigger Management Boards designed by Andrei Sukhanov (BNL,PHOBOS) One design based on Lattice ispLSI3328 PLD Used with different firmware for separate applications VME compliant, with dECL inputs Level 0, Level 1 Trigger Managers: - Implement trigger logic in different modes - Set BUSY signals using inputs from subsystems - Allow software configured pre-scaling and selection of trigger types Event Manager Master and Slave boards - Master resides in Trigger VME crate, slaves in other sub-system crates - Provides reliable synchronization between sub-systems : strobes out Event Numbers for accepted triggers - Final event-building relies on these synchronized Event numbers. Master Event Manager Level 1 Manager Level 0 Manager Slave Event Manager Trigger from Trigger Detectors Event # Trigger + Event # to Silicon Front End Trigger + Event # to Plastic Front End

Performance in Physics Run 2000 RHIC delivered ~2.7 b -1 integrated luminosity to PHOBOS over 6 weeks of running in Summer Silicon systems performed to specifications : Average S/N measured in the detector was 15 to 20 depending on Sensor type. 98% channels fully functional. Front End Electronics were stable. Every instance of latch-up in the VA chips was detected successfully during adverse beam conditions. PHOBOS captured ~3.5M events on tape : mixture of minimum bias and central triggers. 99% DAQ uptime. Sustained data throughput rates of 5MB/s for Event-Builder writing events to local disk.

Planned Upgrades for 2001 Run RHIC will increase luminosity by a factor of 10 Second Arm of Spectrometer will be installed  40K more readout channels Event Builder will be moved from Sun workstation into VME based UltraSPARC server with local RAID disks. Projected increase of throughput rate to ~ 20 MB/s