Last Update: 4/8/03 Page 1 9102 - FAI Standard Implementation Review Team Status April 9, 2003.

Slides:



Advertisements
Similar presentations
“The Honeywell Web-based Corrective Action Solution”
Advertisements

Company Confidential 1 IAQG “ Supply Chain Management Handbook” IAQG General Assembly York, North Yorkshire, UK Friday, October 22, 2010 Bill Schmiege.
How to Document A Business Management System
Preparing Business Reports
Project Scope Management
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
Chapter 5: Project Scope Management
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
Project Scope Management
1 IAQG Other Party Management Team (OPMT) - Report to the IAQG General Assembly Montreal Canada – October 7 th, 2005 Michael C. Roberts IAQG OPMT Vice.
Creating a world where environmental sustainability and social justice are the normal conditions of business
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
CHE 165 Plant Design Introduction. Greensheet Review  Target is Study –Reported Verbally and in Text –Consists of Various Components  Most are submitted.
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Software Configuration Management (SCM)
1 International Aerospace Standard for for First Article Inspection(FAI) First Article Inspection(FAI) Dick Pocock VP, Quality Assurance Honeywell Engines.
International Aerospace Quality Group (IAQG) Informational Overview 28th June 2001 Gary Baker ~ Americas Sector Leader ~
1 Air Quality Bureau Kaizen Event Report Out By: Modeling Meddlers October 6, 2006.
Company Confidential Rewrite Team Proposal Tim Lee - OPMT.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
People Capability Strategy Stream
1 DRAFT Monitoring/Evaluation Overview September 20, 2010 Title III Director’s Fall Meeting.
31-May-16 chart 1 International Aerospace Quality Group Registrar Management Schemes SEPTEMBER 2002 Barb O'Dell.
06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Philippe Removille SNECMA Moteurs 5.
1 Business Communication Process and Product Brief Canadian Edition, Mary Ellen Guffey Kathleen Rhodes Patricia Rogin (c) 2003 Nelson, a division of Thomson.
The Role of NCAS Assessments NASA Supply Chain Conference Goddard Space Flight Center November 14, 2007.
Americas Aerospace Quality Group AAQG Project #56 Harmonized Oversight Process AS91XX.
Other Party Management Team (OPMT) Status Briefing Americas Aerospace Quality Group (AAQG) Registration Management Committee (RMC) Tim Lee – Chair The.
1 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 AS9102, EN 9102, SJAC 9102 Dick Pocock VP, Quality.
Using the FRP to Enhance Georgia’s Leadership Program May 9, 2006 Stephanie Busch P 2 AD.
Mackenzie Dedicated to the Group Market  Mackenzie has been active in the group market since 1988 and will continue to focus on this market in the future.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
International Aerospace Quality Group (IAQG) Informational Overview March 2002 Gary Baker Americas Sector Leader International Aerospace Quality Group.
AAQG Project # 56 Harmonized Process/Standard Oversight / Surveillance Prepared by: Tim Lee The Boeing Company The Boeing Company June 7, 2005 June 7,
Company Confidential 1 AS9104/2A Oversight Standard Revision Report Tim Lee Project Chair September 11, 2012.
06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Chetan Date, Ph.D., P.E. Director of Design.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
©2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
1 IAQG Relationship Growth Strategy Ed Bayne IAQG General Assembly San Diego April 7, 2006.
ISO Registration Common Areas of Nonconformances.
Business Registers Recommendations Manual Presentation by Eurostat
IAQG Other Party Management Team (OPMT) - Report to the IAQG General Assembly San Diego, California – April 6, 2006 Rick Downs IAQG OPMT Chair.
Company Confidential AAQG RMC Meeting April 6, Other Party Management (OPMT) Team AAQG RMC Report Tim Lee, The Boeing Company OPMT Chair April 6,
1 IAQG Oversight Team Report (Other Party Management Team) (Abridged Version - mcr) Amsterdam – April 27 th, 2005 Julio Perez Caballero IAQG OPMT Chair.
Company Confidential Rewrite Team Requirements for Aerospace Auditor Competency and Training Courses.
Company Confidential /2 Oversight Revision Report San Diego, CA 19 Jan 2011 Tim Lee Project Chair.
Company Confidential AS9110 – Revision Status and Training Reported by: Rick Downs Date of Report: 2011 July.
1 Geant4 Documentation Dennis Wright Geant4 Delta Review 9 October 2002 Internal documentation review Documentation improvements Plans for future improvements.
Tim Lee The Boeing Company September 17, ICOP Oversight Revision Status.
Project Management ISE 5101 Karl Smith Project Monitoring & Control I Project Meetings.
Information Technology Project Management, Seventh Edition.
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July Ballot: What is it all about? Information.
Project Management Process Interim Update for ERCOT Board of Directors.
System Restoration & Blackstart Standards Drafting Team Presentation to Texas RE Reliability Standards Committee March 4, 2009 Rick Terrill Confidential.
External Provider Control
Oversight Revision Report
SUPPLIERS INVOLVEMENT
International Aerospace Quality Group (IAQG)
Americas Aerospace Quality Group AAQG Project Management
Americas Aerospace Quality Group AAQG Project Management
Vince May Atlanta, Georgia July , 2010
AS9104/2 Oversight Revision Report
EN/AS/SJAC 9101 Re-Write EN/AS/SJAC 9101 Audit Process Coordination Draft IAQG Working Group Prepared by: Tony Marino The Boeing Company Supplier Quality.
AS9104/2 Oversight Revision Report
9104/2 Oversight Revision Report
International Aerospace Quality Group European Sector Leader
The Aerospace QMS Standards Portfolio an Update
Global Aerospace Industry; One Common Approach
Change Highlights January 2013
Presentation transcript:

Last Update: 4/8/03 Page FAI Standard Implementation Review Team Status April 9, 2003

Last Update: 4/8/03 Page 2 IAQG Team Members n AAQG l Donna Ouimet, John Barrett (GEAE) l Peter Kern, Ray Wynkowski (Goodrich) l Paul Violante/ Anurag Verma (Messier Dowty- Canada) l George Buswell (Boeing) n Suppliers l John Burns (Kaman) l Steve Meyer (Eaton) n EAQG l Tony Holme (Rolls- Royce, plc) l Philippe Removille (Snecma) l Jose R.Muro (Gamesa, ATECMA-Spain) n APAQG l Shuji Komori (FHI) l Naoki Katagiri (SJAC) l Sung-Ju, Lee (KAI) l Ran Tuo (AVIC1) IAQG Document Representative: Chet Date (Honeywell)

Last Update: 4/8/03 Page 3 Charter n Seek Input from Companies with Significant Experience in Implementing 9102 l What's Working? l What's Not Working? l What are the Show-stoppers/Burning Issues and What are the Work-arounds n Consolidate and Analyze n Identify Key Issues and Provide Recommendations n Any “Easy-Changes" to the Document: Present in the “Ballot-Ready” Draft at Edinburgh

Last Update: 4/8/03 Page 4 Scope n Do Not Violate IAQG’s Original Directive l Maintain the Current Scope of 9102 l No Major Changes n Simplify/Clarify 9102 n Out of Scope: l FAI for 3-D Models- Paperless Drawings (Some Accommodations Have Been Made) l Software FAI l Long-Term FAI: Broad-based Process Control (Similar to APQP/PPAP)

Last Update: 4/8/03 Page 5 Two Schools of Thought Regarding The Purpose of FAI n Verification That the Manufacturing Processes Have Made a Part That Meets All Design Requirements OR n Verification That the Manufacturing Processes Have Made a Part That Meets All Design Requirements and Additional Assurance That the Quality System was Complied With to Consistently Make Parts That Meet All Design Requirements

Last Update: 4/8/03 Page 6 Findings n Confusion Due To l Added “Flexibility” and “Options” l Inclusion of Form Description in Main Text l Unclear “English” n Resulting in l Increased Complexity l Several Interpretations of the Standard Through the Supply Chain l Variation in Implementation l “Good to Have” Items Mixed With “Must Have” Requirements l Scope-expansion for FAI (e.g., Adding Process Control, Quality Systems Verification)

Last Update: 4/8/03 Page 7 Revised Document What’s The Same? l Scope of 9102  “Snap Shot” Verification  Assurance of Drawing Compliance l Applicability l Requirements  Standard Use of Forms  Documentation Requirements  Evaluation Requirements  Event Triggers for Repeat/Partial FAI l Some Flexibility - Optional Fields

Last Update: 4/8/03 Page 8 Revised Document What’s Different? l Improved Layout and Readability of the Standard  Use of “Simplified English” (AECMA Guideline)  Simplified, Color Coded Forms l Eliminated “Points of Confusion”  Clarified “Mandatory Requirements” and Clearly Identified “Optional” Elements  Re-identified “Guidelines” that Were Disguised as Requirements  Forms Broken Away From the Main Document - Allowed Focus Back on Requirements  Eliminated Contradictions Between Forms and Requirements l Provided Open Fields for Company Specific Non Requirements e.g. Process Assurance

Last Update: 4/8/03 Page Review Team Proposal n IAQG Council Directs Sectors to Release the 9102 Rev-A Document for “Quick Ballot”

Last Update: 4/8/03 Page 10 Recommendations for Future Activities 1. Charter a Team to Support Implementation of 9102 l Training, Education, Communication, Publicity, “Go-to” People, Electronic Data Collection Tool, etc. 2. Revisit “Process Proving - Quality Planning” l Review If 9103 Can be Expanded to Support Need; Review/Revive IAQG Project SOO/14 l Not Doing So Will Proliferate Several Company Specific 9102 PLUS Requirements 3. Charter a Study-team: FAI Standard for 3-D Model- Paperless Drawings l That’s Where the Future Is… And We Don’t Have Any Common Standard for FAI. l Not Doing So Will Proliferate Several Company Specific Requirements- Some Inadequate, Some Over-kill