HFM-meeting, September 29 th 2009, G. de Rijk, HFM-task1 1 WP7 HFM task 1 Gijs de Rijk (CERN) 29 th September 2009.

Slides:



Advertisements
Similar presentations
A transnational project implemented by PPs Meeting PUBLIC AREA.
Advertisements

SAFEFOODERA – SSA – integration project Expansion of SAFEFOODERA – Fully integrated or Associated partnership in 12 months.
NUSTAR ECOS meeting held on the 27 of May 2005 in Paris (University of Jussieu): Three items: -The ECOS document for NuPECC -The ECOS town meeting.
HFM coll. meeting, Febr , G. de Rijk, Task 4 1 Task 4: Very high field dipole insert Gijs de Rijk (CERN) 24 th February 2009.
Eucard2-WP10 Reminder of engagement of each partner Lucio Rossi WP10 coordinator.
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
CLARIS NCT1 Management, coordination and dissemination activities J-P Boulanger (CNRS) and Carlos Ereño (UBA) (CNRS, CONICET, UBA, UR) k To manage the.
Communication and Tools Kate Kahle17 / 11 / 11. Communication and tools Kate KahleHiLumi LHC Kick-off Meeting2 / 9 1.Public website 2.Accessing the Intranet.
STABLE Kick-off meeting Torino – October 25 th - 26 th,2012 WP 7 Scientific coordination First phase (M1-M6) QIUPING CHEN POLITECNICO DI TORINO STABLE.
1 EUDET Status Report NA1 Management Joachim Mnich Extended Steering Committee Meeting September 11, 2006.
Role of Management and Technical Coordination
1. 2 HIPPI at end Official end of the Activity in December 2008  no extensions will be considered. The remaining deliverables are due at the latest.
Implementing ISO 9001 Our project plan Copyright ©2008 The 9000 Store.
EUROPEAN WORKPLACE AND ALCOHOL EWA PROJECT Main elements of coordination, administration and reporting WP1 Lidia Segura and Eva Moreno Program on Substance.
SLHC-PP Admin News Admin guide Time sheets Effort Web Pages 1 st Deliverable Report SLHC-PP Steering Committee Meeting CERN, July 3 rd, 2008.
EPOCA – 11. June EPOCAConsortiumOrganisation.
HIPPI 05, Abingdon, Introduction to HIPPI05 -Few words on the life of HIPPI -A new HIPPI Management… -HIPPI 05 organization -Mandate for the.
HFM High Field Model, EuCARD WP7 meeting, 18/03/2010, Pierre Manil, 1/20 EuCARD-WP7-HFM MPWG Bending Test Pierre MANIL CEA/iRFU/SIS March 18, 2010 at Wroclaw.
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
Green Partnerships Local Partnerships for Greener Cities and Regions Study visit and 3 rd Steering Committee meeting Freiburg, 14 – 18 October 2013.
HL-LHC FP7 DS Status of the proposal Lucio Rossi - CERN 3rd General Meeting for application preparation – CERN 20 October.
WP1 Consortium management OBJECTIVES To ensure compliance with the Grant Agreement and Consortium agreement Specific objectives: 1: To secure day-to-day.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
CODE 2 Cogeneration Observatory and Dissemination Europe Kick-off meeting July 2012 WP1 Management 10-11/07/2012COGEN Europe.
1 EUDET Summary and Outlook Joachim Mnich Annual Meeting 2008 NIKHEF, October 8th.
RARECARENet: how will we work together?. Information network on rare cancers Advisory Board The Coordinator (Project Management Team) Steering Committee.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
HFM-coll-meeting, 20 th Mar. 2013, GdR & FK, HFM-task1 1 WP7 HFM task 1 Gijs de Rijk & Francois Kircher 20 th March th EuCARD-WP7-HFM Collaboration.
EMI INFSO-RI Guidelines and SQA Process Maria Alandes Pradillo (CERN) SA2.2 Task Leader.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Evaluation.
Task 2.1: Software Specifications Markus Kissler-Patig.
Eucard2 – WP10 Future Magnets Philippe Fazilleau & Lucio Rossi WP10 kick off meeting CERN, 14 June 2013.
The School Year Handbook of Procedures Section B 11.
CARE Governing Board R. Aleksan CERN, April 5, Meeting objectives 2.General financial overview 3.Conclusion.
WP1- Management EuroVO-DCA 1 st PCT Meeting – 3&4 May 2007 Mathias DEPRETZ – EuroVO-DCA Project Manager 1 st PCT meeting 3&4 May 2007 Strasbourg EuroVO.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
INCO 3739 Integrating Multiple Demands on Coastal Zones with Emphasis on Aquatic Ecosystems and Fisheries Third Annual and Final Reporting 4th Project.
Dipole review, January Dipole design review: outlines of talks Gijs de Rijk, Francois Kircher and Jean- Michel Rifflet.
A Year in the Life of a Client Portfolio Review and Rebalancing Analysis Create Client Summary, Performance Reports, and Recommendation.
Fresca2 Technical meeting, 9 th june 2015, Gdr, relevance for FCC 1 Relevance of SMC/RMC/Fresca2/Inserts for FCC Gijs de Rijk 9 th June 2015 CEA Saclay.
HFM coll. meeting, Febr , G. de Rijk, Summary of WP 1 Summary of the work-package. HFM: Superconducting High Field Magnets for higher luminosities.
TIARA – WP6 Involving Industry in TIARA Lucio Rossi (WPD) CERN.
Steering group -meeting in The 1st meeting of the steering group will be held in the premises of the project coordinator in Tampere. During.
SC meeting R. Aleksan February 11 th TIARA 1.General Information 2.Final Budget 3.Meeting Objectives 4.Organizational matters 5.Kickoff meeting 6.Conclusion.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.
GC meeting R. Aleksan February TIARA 1.Meeting objectives 2.General Information 3.Final Budget 4.Consortium Agreement 5.Next meetings 6.Conclusion.
Work Package 2 „Implementation of the SRA” Call secretariat Annette Angermann & Wenke Apt Rome, 11 June 2015.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
AMICI WP1 – Management, coordination and dissemination
High Luminosity LHC (HL-LHC) and Magnet progress
ARIES Industrial and Societal Applications Network
The R&D programme on High Field Magnets (HFM)
Almost there … …but not just yet
Dr Sally Priest, Flood Hazard Research Centre
C2-SENSE WP2 Meeting Status of Task 2.4
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
EU Institution Board 1 representative of each participating institute
JARC General Assembly, Oct 16th, 2017
CUBS the 7th Technical Steering Group Meeting
Choosing a Group to Create and Run Your Initiative
AMICI WP1 – Management, coordination and dissemination
ANTICORRP ANTICORRP General Assembly Meeting Administrative update
Common Implementation Strategy for the
ESS.VIP ADMIN – Status report Item 4.1 of the draft agenda
WP 1 Management and Coordination
Safety Standards Committee meetings 24th TRANSSC meeting Agenda item 3
Presentation transcript:

HFM-meeting, September 29 th 2009, G. de Rijk, HFM-task1 1 WP7 HFM task 1 Gijs de Rijk (CERN) 29 th September 2009

HFM-meeting, September 29 th 2009, G. de Rijk, HFM-task1 Committees: steering committee changes Gijs de RijkCERN Francois KircherCEA-Irfu Pascal TixadorCNRS Grenoble * Simona BertaCOLUMBUS (to be replaced)DESY (stepped out) Andre AubeleBHTS Mathias NoeFZK Giovanni VolpiniINFN-LASA Maciej ChorowskiPWR Yifeng YangUniv. Southampton Jim ClarkeSTFC-DL Antti StenvalTU Tampere Rene FlukigerUniv. Geneve 2

HFM-meeting, September 29 th 2009, G. de Rijk, HFM-task1 Committees: ESAC External Scientific Advisory Committee will be finalized when Francois and me can meet the candidates: MT21 Proposed names: Akira Yamamoto (ok) Arup Ghosh (tbc) Shlomo Caspi (tbc) Giorgio Ambrosio (tbc) Lucio Rossi (ok) yukikazu Iwasa (ok) Pasquale Fabbricatore (tbc) 3

HFM-meeting, September 29 th 2009, G. de Rijk, HFM-task1 Reporting The 6 – monthly activity report: Sequence of events: Task leader reports: 10 October (10 days after the end of the semester)  Work Package leader Work Package leader report: 20 October (20 days after the end of the semester)  Project Coordinator 4

HFM-meeting, September 29 th 2009, G. de Rijk, HFM-task1 Instructions were send by Svet to the TLs Deadline for WP7 is 7 Oct at 9h00 (meeting between Francois and me at CEA to put the report together) 5