Internal Assessments at Argonne Accelerator Facilities S.W. Butala Presented at the DOE Accelerator Safety Workshop - BNL August 19, 2009.

Slides:



Advertisements
Similar presentations
1 Welcome Safety Regulatory Function Handbook April 2006.
Advertisements

(Individuals with Disabilities Education Improvement Act) and
Institutional Animal Care and Use Committee (IACUC)
Safety Software QA at BNL’s Collider-Accelerator Department (C-AD) Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
More CMM Part Two : Details.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to ASAC R. Casey Radiation Shielding: Assumption and Design April 24, 2007.
1 LASER SAFETY NSC Clinical and Operational Conference Calls August 24, 2005.
©2013 Accreditation Council for Graduate Medical Education (ACGME) Information current as of December 2, 2013 Recent Changes in ACGME Policy.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
David Schultz Accelerator Nov. 12, ‘08 SLAC National Accelerator Laboratory 1 Accelerator Readiness ARR scheduled for Dec.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
Safety Oversight for SLAC Accelerator Department Operations
ACFID CODE OF CONDUCT Changes to the Code Effective Jan 2015.
External Quality Assessments
Unit 2: Managing the development of self and others Life Science and Chemical Science Professionals Higher Apprenticeships Unit 2 Managing the development.
LCLS NEH Operational and User Safety Programs
Commission on Accreditation for Respiratory Care The Site Visitors Are Coming! Transitioning from Successful Self- Study to Successful Site Visit Bradley.
Ofsted framework 2012 Feedback from inspections carried out under the new framework and implications for clerks and governing bodies Clerks briefings April.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
1 Lawrence Berkeley National Laboratory Integrated Safety Management Systems Review August 8-9, 2006 B erkeley Lab Safety Committee Presentation Paul Blodgett.
Audit Committees: practices in the EU Manfred van Kesteren Bucharest, December 4th 2014.
Configuration Management During Shutdown Picture of the Week Collider-Accelerator Department Take 5 for Safety.
CMM Level 2 KPA’s CS 4320 Fall Requirements Management 1 Goals: – System requirements allocated to software are controlled using a baseline for.
Briefing on a Draft Green Streets Policy for the National Capital Region Michael Farrell COG/TPB Staff Transportation Planning Board January 15, 2014 Item.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
The Institutional Review Board: A Community College Toolkit Dr. Geri J Anderson.
11 FSO Assessment of Fermilab QA Program Status September 14 – 18, 2009.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Electrical Fire in Terminal Room at Collider-Accelerator Department Relay-Fire Investigation Committee
1.  Mission: Improve and operate accelerators, support the experimental program, and design and construct new accelerator facilities in an environmentally.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Training, Prior Reviews, Configuration Management Action Item Tracking.
An Alternative Disposal Method for Activated PCB Capacitors N.M. Brachmann F.R. Brumwell S.W. Butala S.Y. Chen J.-J. Cheng Presented at the DOE Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
Energy, Environment and National Security Directorate (EENS) Best Management Practices in the Experimental Safety Review Program Robert Doty Experimental.
September 19-20, 2007 E. Lessard EBIS Safety EBIS Project Safety Ed Lessard September 19-20, 2007 DOE Annual Review.
D. Beavis (RSC) May 4, 2010 EBIS ARR Radiation Safety.
Program Implementation MM.DD.YY. To comply with the OHSA and regulations To demonstrate management's commitment to health and safety To show employees.
Thomas Jefferson National Accelerator Facility Page 1 Bob May ESH&Q Deputy Internal Assessment Process BNL Accelerator Safety Workshop Aug 17-19, 2009.
Scott Davis, Team Leader March 13,  SC DDFO established fiscal year 2009 Annual Performance Plan and assessments objectives, which included this.
User Training at the Advanced Photon Source J.H. Vacca, S.W. Butala Presented at the DOE Accelerator Safety Workshop - BNL August 18, 2009.
Collider-Accelerator Department EBIS Commissioning Accelerator Readiness Review (ARR) Conduct of Operations Administrative Controls Ray Karol May 2010.
LEA Conference, October 18, CIWMB Proposed Compliance Strategy Lorraine Van Kekerix Division Chief Compliance Evaluation & Enforcement Division.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
1 BROOKHAVEN SCIENCE ASSOCIATES 2009 DOE Accelerator Safety Workshop BNL S-band LINAC Fire Safety Concerns August 19, 2009 A. Ackerman.
1 David Schultz 1 SLAC Self-Assessment Programs meeting ASO Requirements David Schultz LCLS Program Division Director SLAC National.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Argonne Accelerator Institute Activites Rod Gerig Argonne May 18, 2007 Presentation to the Fermilab-Argonne Directors’ Collaboration Meeting.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
EN EUROPEAN COMMISSION Budgetary Control Committee of European Parliament Budgetary Control Committee of European Parliament Brian Gray DG BUDGET Workshop.
Accountability & Program Assessment Governing Board Online Training Module.
Safety Audits An essential tool for active safety management April 2015 Dr Emer Bell Integrated Risk Solutions.
Audits & DOE Walkthroughs ISO and OHSAS surveillance audits August 18 th – 20 th –CD, ESH&Q, and FESS organizations to be audited Software.
PIP-II Environment, Safety, Health & Quality Assurance Strategy John Anderson Jr. DOE Independent Project Review of PIP-II 16 June 2015.
Overview of FESHCom Subcommittees Don Cossairt, Radiation Protection Manager, ESH&Q Section October 1, 2013.
DOE Accelerator Safety Workshop 2017 Bob Lowrie
Safety Configuration Management Process at JLab
Planning for Succession
Best Practices in Performing DSA Legacy Reviews
WENRA Current activities of WENRA 4th GNSSN Steering Committee Meeting
Updates on ESS Handbook for Radiation Protection
Chemical Safety and Security Plan
Research and Test Reactor Decommissioning Inspections
DOE Review of the LCLS Project October 2006
2009 FAPT Summer Conference
Safety Program for LCLS Experiments
Inspection Good practice (GP6):
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Internal Assessments at Argonne Accelerator Facilities S.W. Butala Presented at the DOE Accelerator Safety Workshop - BNL August 19, 2009

Argonne Accelerator Facilities 1.Advanced Photon Source (APS) 2.ATLAS (Physics Division) 3.Argonne Wakefield Accelerator (AWA) 4.3 MeV Van de Graaff (CSE) 5.20 MeV high current linac (CSE) 6.2 MeV Van de Graaff (DEP) 7.MSD accelerator facility 8.IPNS – (shutdown December 2007) 9.5 MeV Dynamitron (shutdown - Physics Div.) 2

Accelerator Internal Assessments Accelerator Safety Review Committee (ASRC) Compliance, Oversight, Assessments Group (COA) Facility self assessments 3

ARSC Assessment Findings – 04/05 4 DateFacilityRecommendations/Suggestions/Observations 02/19/04MSD Accelerator Facility Suggestion: MSD should form an ad hoc committee of experts in electrical safety to review facility electrical safety practices 05/06/04IPNSNone 11/17/04ATLAS FacilityNone 03/23/05Argonne Wakefield Accelerator (HEP) Rec. 01: The division should revise the SAD to make a completely self-contained document. 06/15/052-MeV Van de Graaff (DEP) Rec. 01: DEP should include a staff member from another division during its safety walkthroughs. Rec. 02: DEP should institute a system to document the issues identified during walkthroughs and track them to closure. 11/29/05Low-Energy Accelerator Facility (CHM) Rec. 01: An issue tracking system should be instituted to identify issues and to indicate how they are closed out. Rec. 02: Operator aids, postings, and labels should be updated throughout the facility. Rec. 03: there should be a more formalized electrical safety committee, including a process to identify items of concern. Rec. 04: Should ensure that beam cannot be directed toward adjoining experimental Cell 2 by making it physically impossible.

ARSC Assessment Findings – 06/ /10/06Advanced Photon Source (APS) Rec. 01: APS should review all safety committee charters on an annual basis, and that the charters indicate the person to whom the committee reports, the date of the latest review, and the date on which the committee was formed. Lists of committee members should be kept separate from the committee charter. This will avoid the situation in which a committee is in violation of the charter due to changes in committee members or their organization affiliation. Rec. 02: The APS should review its implementation of lock-out/tag- out to assure that usage conforms to ANL policies and procedures. 12/15/06MSD Accelerator Facility None 03/07/07IPNS Accelerator Facility Observation: IPNS management should consider undertaking a study in the near future regarding the costs of D&D of the accelerator (ion source to PTS beamline) as well as the ramifications of the resulting change in facility status. 11/18/07PHY Division Accelerators Rec. 01: PHY should review and update the charters and membership of all divisional safety committees. Rec. 02: PHY should access their walkthrough inspection process to ensure that significant items are being identified, and institute a system for follow-up to make sure that any issues identified are resolved in a timely manner.

ARSC Assessment Findings – 08/ /14/08HEP Accelerator FacilitiesRec. 01: HEP Division and AWA facility should implement some form of configuration control for the accelerator vault shielding, particularly for the stackable lead shielding used in penetrations between the accelerator vault and the adjacent laser room. The shielding should be visually examined before RF operations and radiation surveys are conducted to verify the shielding performance if the shielding has been moved or altered. 06/13/08MSD Accelerator FacilityRec. 01: Must improve experiment sample safety review process. 07/01/082 MeV Van de Graff (DEP) None 01/22/09Low-Energy Accelerator Facility (CSE) Rec. 01: linac electrical safety issues (CSE put facility on stand-down) Rec. 02: SAD’s out of date. Rec. 03: Designate new CSE division as manager in all documentation Rec. 04: Must formalize operational aids

Recent COA Assessments April Work Planning & Control – APS 1.SAD’s not reviewed annually, per ASPM 2.LOTO of fire protection valves 3.Fire doors propped open April Work Planning & Control – Physics (ATLAS) 1.SAD’s not reviewed annually, per ASPM 2.ATLAS conduct of operations matrix not approved by DOE 3.Inadequate crane inspections 7