Unit 91 Week 14 Jon Gutierrez, Chris Sauer, Simon Radomski, Chat Huynh, Jeff Burton, & Robert Platt November 19, 2008 Prototype Review Week 3
Previous Week Prototype Plan of Action
Week 4 - Planned –Shock Connect –Lower Arm –Upper Arm
Fabrication Punch list
Materials List Completed Parts –BOTTOM BRACKET AND HEAD TUBE 1-5/8 OD X 1-1/4 ID X 7-1/2 LENGTH TUBE –ARMLINK ¾ X 1 X 24 RECTANGULAR BAR - Aluminum –TOP TUBE, BOTTOM TUBE, SEAT TUBE 1 ½ OD X 1/16 THICKNESS X 72 –Axle MOUNT Steel or Aluminum Plate: Size to be determined –Arm LINK 3 ½ X 6 3/8 X - Aluminum In Progress Parts –LOWER ARM Steel Round Tubing, Steel Plate, 1” x ½” Steel Rectangular tube –Upper Arm 1” x ½” Steel Rectangular tube.
Bike Model
Website
Next Week Prototype Review