NAVFAC MID-ATLANTIC January 15, 2014 (Revised 3/11/2014) NAVAL STATION NEWPORT INSTALLATION RESTORATION PROGRAM BUDGET UPDATE FY 2013 ACTUAL COSTS AND.

Slides:



Advertisements
Similar presentations
June 6, 2013 SURFACE RECLAMATION OF THE CAPTAIN JACK MILL SUPERFUND SITE Nick Anton, CDM Smith Todd Bragdon, CDM Smith Mary Boardman, CDPHE Joy Jenkins,
Advertisements

BoRit Superfund Site Timeline
1 Fort Monroe: An Update on the Environmental Cleanup VDEQ Presentation to the Fort Monroe Federal Area Development Authority March 19, 2009.
Melinda Brunner DEC Contaminated Sites Program 20 th Annual Alaska Tribal Conference on Environmental Management Anchorage, Alaska October 30, 2014.
Josephine County Solid Waste Agency Master Recycler Program March 1, 2010.
WWII Navy Bomb Disposal School , on AU campus for research & education CIVIL WAR Ft. Gaines & other forts located near SV area during Civil War.
US Army Corps of Engineers Portland District Fiscal Year 2007 NWP Dredging Plan Including: The Columbia River Channel Improvement Project (CRCI)
2nd Quarterly Resource Management and Performance Report Financial Highlights From January 1 to June GS/OAS/SAF/DFAMS – August 21, 2014.
1 Aggregate Areas David S. Rhodes Acquisition Integrated Project Team Chair Environmental Management Los Alamos Field Office March 3,
Orange County Budget Budget Worksession Summary July 18, 2013.
IR Site 7 Sediment Remediation
GHS Science CAPT Embedded Task Review
Brownfields are “real property, the expansion, redevelopment, or reuse of which may be complicated by the presence or potential presence of a hazardous.
TaskFFA SubtaskDue Date SUPPLEMENTAL INVESTIGATION (OFFSHORE) Submit Draft Report - FFA Date2/2/2012 ENGINEERING ESTIMATE/COST ANALYSIS (EE/CA) (OFFSHORE)
1 Association of Defense Communities Conference June 22, 2014 Ms. Laura Duchnak Director, BRAC Program Management Office Naval Facilities Engineering Command.
NAVFAC MID-ATLANTIC 11/14/2007 NAVAL STATION NEWPORT INSTALLATION RESTORATION PROGRAM BUDGET UPDATE – FY 2007 ACTUAL COSTS AND FY 2008 EXECUTION PLAN.
Disposition of Excess BRAC Real Property at NAVSTA Newport, RI
1 Confidential Material IT Finance Sony Pictures Entertainment Information Technology June Review July 19, 2013.
Presentation to the Restoration Advisory Board Plan for Site Investigation: Munitions Response Program (MRP) Site 1 Carr Point Shooting Range March 18,
US Army Garrison Picatinny Arsenal Agenda for 11 June 2014 Picatinny Arsenal Restoration Advisory Board Attendance, Introductions & Correspondence Old.
U.S. Environmental History 1965 Solid Waste Disposal Act (WSDA) 1976 Resource Conservation and Recovery Act (RCRA) – Identification of wastes (characteristics.
UPDATE ON ARMY MILITARY MUNITION RESPONSE PROGRAM (MMRP) Mary Ellen Maly / SFIM-AEC-CDP / / DSN / 1.
Proposed Amendments to Chapter 32, Article V, Solid Waste Management, and to Chapter 38, Zoning Orange County Code Presented by the Orange County Environmental.
Update on the Superfund Program: U.S. Tour de Table NATO SPS Pilot Study Prevention and Remediation in Selected Industrial Sectors June 17-23, 2006 Ljubljana,
Site Activities Update Park – Euclid RP Group Community Advisory Board Meeting January 16, 2013.
Environmental Programs Update SAME Northern Virginia Post Monthly Meeting Rob Sadorra, MBA, M.Eng., P.E. Director, Environmental Restoration Division NAVFAC.
Navy Munitions Response Program Update NAOC Winter 2013 Meeting Mr. Stephen Hurff, P.E. NAVFAC HQ Munitions Response Program Manager 11/20/2013.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 The FY12 Environmental Restoration Program and Draft Restoration.
Denver Federal Center Calibration Silo Removal Plan What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
Mrs. Gamari Physical Science.  Land that was previously used for industrial or commercial purposes and is possibly contaminated by hazardous waste or.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
Environmental Dredging of Perfluorochemical-Impacted Sediment from a Sensitive Wetland Mark A. Gaetz (3M) Paul Lear (WRScompass)
02M022003D 30th NDIA Environmental & Energy Symposium & Exhibition Pay-for-Performance Subcontract Stimulates Innovation and Reduces Cost During Remediation.
Former DuPont Barksdale Works Project Update December 14, 2006 Great Lakes Visitors Center DuPont CRG.
UC Berkeley Richmond Field Station Remediation and Restoration Project January 16, 2008 Town Hall Meeting Agenda 1.Project Background 2.Recent Activities.
NAVFAC MID-ATLANTIC 0318/2009 NAVAL STATION NEWPORT INSTALLATION RESTORATION PROGRAM BUDGET UPDATE – FY 2008 ACTUAL COSTS AND FY 2009 EXECUTION PLAN.
Team Successes at the Former Memphis Depot, Memphis, Tennessee Presented by: David D. Nelson, P.G.Thomas C. Holmes Project Manager, CH2M HillProject Manager,
1 West Valley Demonstration Project FY 2014 Budget Briefing Bryan C. Bower May 22, 2013.
Fort George G. Meade KEMRON PBC Sites Near-Term Deliverables Update Operable Units 1, 3 and 5 Restoration Advisory Board Meeting March 17, 2011 KEMRON.
Project Update: Hudson River PCBs Superfund Site October 24, 2012 Mr. David King, PE – USEPA Region 2 Mr. Gary Klawinski – USEPA Region 2 Mr. Mark Surette.
1 RAB Update Trap and Skeet Range 17 Remedial Investigation Activities 25 March 2010.
ISPA Measure 2003 BG 16 P PE 019 Kardjali Regional Waste Management Centre in Bulgaria 10 th Cohesion Fund Monitoring Committee CR 1164/94.
Tulsa Fuel & Manufacturing Superfund Site Remedial Design and Cleanup Plans September 2014.
FY 2015/16 Financial Overview Revenues: Operating revenues for FY 2015/16 are projected to be approximately $116,550 or 1.6% higher than operating revenues.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force The Air Force Military Munitions Response Program For: Mr. William.
Western Avenue WQARF Site Western Avenue/Phoenix Goodyear Airport CAG Meeting of August 8, 2013 Delfina Olivarez.
Status of Sediment and Groundwater Remedies. Or… What’s up with that O&F Determination?
COMMUNITY DEVELOPMENT RESOURCES, HELPING WISCONSIN SUCCEED 7 Rivers Alliance Rural Workforce Housing Summit June 1, 2016.
ПЕЧЕНЬ 9. Закладка печени в период эмбрионального развития.
Former Naval Fuel Depot Point Molate December 8, 2014 Summary of IR Site 3 Remediation and Abatement Work to Date Point Molate Naval Fuel Depot Richmond,
FY 2016 – 2017 BUDGET OVERVIEW Forest Preserve District of DuPage County.
Environmental Acquisition Strategy Performance-Based Contracting
Environmental Cleanup Program Status
Groundwater Pollution
IPWEAQ SEQ Branch Conference 2017
LRP Group FY 17 Accomplishments August 21, 2017
Environmental Cleanup Program Status
Environmental Cleanup Program Status
Agenda for 24 OCT 2013 Picatinny Arsenal Restoration Advisory Board
Attendance, Introductions & Correspondence Old Business
Mike Adhanom, Section Chief, Division of Air Quality
!'!!. = pt >pt > \ ___,..___,..
Faculty Senate November 8, 2012
Planning and Budget Committee
University Budget Committee
Introduction EPA is overseeing the RI/FS for the Rolling Knolls Landfill being conducted by several companies under a 2005 administrative order on consent.
McKesson-SFS Site DTSC Meeting
DRAFT - NOT ACTUAL RESULTS
City of Twin Falls Fiscal Year
Presentation transcript:

NAVFAC MID-ATLANTIC January 15, 2014 (Revised 3/11/2014) NAVAL STATION NEWPORT INSTALLATION RESTORATION PROGRAM BUDGET UPDATE FY 2013 ACTUAL COSTS AND FY 2014 EXECUTION PLAN

2 Naval Station Newport IR Program 1/15/2014 (Rev. 3/11/2014) FY13 ACTUAL EXECUTION PROJECT COST Site 1 – McAllister Pt Landfill: O&M for CY2013 (includes Sediment Sampling)$210,037 Site 8 – NUSC Disposal Area: Remedial Action (Soil Remedy)$2,094,964 Site 9 – OFFTA: LTM & Asbestos Removal$509,287 Sites 7, 10, 11, 12 & 13 – Tank Farms 1-5: Additional Sampling & Reports$979,862 Site 19 – Derecktor Shipyard: Remedial Design$667,362 Five Year Review$60,649 Basewide IR Support$189,172 TOTAL$4,711,334

3 Naval Station Newport IR Program 1/15/2014 (Rev. 3/11/2014) FY13 & FY14 FY13 PLANNED $7,925,246 FY13 ACTUAL $4,711,334 FY14 PLAN $6,714,206

4 Naval Station Newport IR Program 1/15/2014 (Rev. 3/11/2014) FY14 PLANNED EXECUTION McAllister Landfill (Site 1) – O&MAnnual Cost CCRFA (Site 4) – RI/FS, PP, ROD & RDOngoing work previously funded NUSCDA (Site 8) – RA Part 2 (GW Remedy)RA phased; 2 nd Part of RA planned this year OFFTA (Site 9) – LTMAnnual Cost Tank Farms 1 through 5 – RI/FSs, EE/CAs, NTCRAs & RDs Ongoing IR work Gould Island (Site 17) – FS, PP, ROD & RDAdditional FS work, ROD postponed Derecktor (Site 19) – FS, PP & RODAdditional FS work; ROD postponed Carr Point Skeet Range (MRP site) – RI/FSOngoing work previously funded Carr Point Storage Area (Site 22) – RI/FSOngoing work previously funded Coddington Point (Site 23)Continued RI work, work previously funded Basewide IR SupportAnnual Cost TOTAL PLANNED REQUIREMENT$6,562,607 PROJECT REMARKS

5 Naval Station Newport IR Program PLANNED BUDGET FOR FY14-FY23+ FISCAL YEARBUDGET 20146,714, ,281, ,430, ,565, ,131, , , , , ,534,957 1/15/2014 (Rev. 3/11/2014)