NEC Varna sep 12-18, 2005 A. Marinov Andrey Marinov On behalf of the CMS Forward RPC Collaboration Y. Ban, J. Cai, H. Liu, S. Qian, Q. Wang, Y. Ye, J.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
Cosmic Ray Test of INO RPC Stack M. Bhuyan 1, V.M. Datar 2, S.D. Kalmani 1, S.M. Lahamge 1, N.K. Mondal 1, P. Nagaraj 1, S. Pal 1, L.V. Reddy, A. Redij.
Roma, P. Camarri DAQ & on-line monitoring at X5 (G. Aielli, P. Camarri) DAQ realization and performance for RPC tests at X5-GIF. Adds and changes.
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
Defined plateau region Knee 95% WP=knee+150V RPC operation and Hardware Performance  Annual HV module recalibration – all CAEN A3512N HV module offsets.
1 Dayabay RPC Detector Zhang Jiawen Outline  Motivation  RPC introduce  RPC for Daya Bay  Efficiency and noise  Module structure  Module.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Electronics for the INO ICAL detector B.Satyanarayana Tata Institute of Fundamental Research For INO collaboration.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
ATLAS RPC: Cosmic Ray Teststand at INFN Lecce G. Chiodini, M. Bianco, E. Brambilla, G. Cataldi, R. Coluccia, P. Creti, G. Fiore, R. Gerardi, E. Gorini,
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
UPDATE ON CMS RESISTIVE PLATE CHAMBERS CMS RPC Barrel Collaboration GR1, 5 Aprile 2004.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB.
RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
PHENIX RPC in China Li Ye Shouyang Hu Xiaomei LI China Institute of Atomic Energy
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
RPC Endcap Maintenance and RE4 Upscope Anton Dimitrov on behalf of RPC TC CMS Week Dec 2012 CERN, Geneva.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Commissioning of ICAL prototype detector electronics B.Satyanarayana TIFR, Mumbai.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
The LNF test setup Status as of Geometry of LNF setup Top and bottom trigger counters 4 KLOE-type tracking chambers One BESIII-(COMPASS-)type.
News on GEM Readout with the SRS, DATE & AMORE
Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
Muon Institution Board 29 March 2011 Pigi Paolucci RPC project status.
Data Quality Monitoring for the CMS Resistive Plate Chamber Detector Anna Cimmino etc etc etc Università degli Studi di Napoli “ Federico II ” & INFN of.
Noise and Cosmics in the DHCAL José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
TEMPLATE DESIGN © CONFIG. 1: 12mm(Drift) / 12mm(T1) / 12mm(T2) / 12mm(Induction) CMS Endcap Resistive Plate Chamber Muon.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Quality Assurance procedures for the construction of ALICE TOF detector VIIIth Workshop on Resistive Plate Chambers and Related Detectors October.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
The CMS Muon System BAN Yong, Peking University 2006/12/12 IHEP, Beijing, China Outline: CMS-Muon system: introduction China’s contribution to CMS Muon.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
Status of the Front-end-Electronics based on NINO ASIC for the Time-of-Flight measurements in the MPD V. A. Babkin, M.G. Buryakov, V. M. Golovatyuk, S.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
Vladimir Frolov (Centro Fermi) On behalf EEE-TO group.
RPC production and performance Chong Kim Korea university RHIC spin workshop, Seoul National Univ.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
(University of Sofia “St. Kliment Ohridski”)
Production ad Quality control of RPCs for the CMS muon barrel system
A proposal to equip the high eta muon stations with High Rate GRPC
CMS RPC Endcap RE1 Status Report
Large CMS GEM with APV & SRS electronics
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
ATLAS Muon Spectrometer and
Conceptual design of TOF and beam test results
The IFR Online Detector Control at the BaBar experiment at SLAC
The IFR Online Detector Control at the BaBar experiment at SLAC
RPC Detector Control System
Resistive Plate Chambers performance with Cosmic Rays
Presentation transcript:

NEC Varna sep 12-18, 2005 A. Marinov Andrey Marinov On behalf of the CMS Forward RPC Collaboration Y. Ban, J. Cai, H. Liu, S. Qian, Q. Wang, Y. Ye, J. Ying, Yucheng Ge - Peking University, Beijing, China B. Hong, S. J. Hong, K. S. Lee, S. Park, K. S. Sim - KODEL, Seoul, S. Korea A. Ball, J-P. Chatelain, I. Crotty, A. Sharma, W. Whitaker - CERN, Geneva, Switzerland W. Van Doninck - Vrije Universiteit Brussel, Brussels, Belgium S. Akimenko - IHEP, Protvino, Russia L. Litov, A. Marinov - University of Sofia, Sofia, Bulgaria A. Devlieger – University of Victoria, Victoria, Canada M. I. Asghar, I. Ahmed, H. Hoorani - National Centre for Physics, Quaid-i-Azam University Campus, Islamabad, Pakistan Z. Aftab, M. S. Khan, T. Solaija - Pakistan AtomicEnergy Commission, Islamabad, Pakistan A.Colaleo, G. Iaselli, F. Loddo, M. Maggi - INFN Bari, Itlay B.Michal Marcisovsky Samuel Scheonholz Rene Kuo Manohar Jonnalagedda CERN Geneva

NEC Varna sep 12-18, 2005 A. Marinov 2 CMS Detector Endcaps

NEC Varna sep 12-18, 2005 A. Marinov 3 FORWARD Resistive Plate Chambers Final Gas mixture used in all tests 95.5 Freon 3.5 Isob 0.3 SF6 + RH 50% = 5000 ppm

NEC Varna sep 12-18, 2005 A. Marinov 4 Forward RE Resistive Plate Chambers 96 Channels. 3 sectors by 32 strips A,B, C Standard LVDS output Slow Control for Threshold and temperature measurements for each F.E.B.

NEC Varna sep 12-18, 2005 A. Marinov 5 Testing RE with Cosmics Cosmic stand. Top and Bottom layers scintilators. Possibility to put 10 chambers inside to test them with cosmics

NEC Varna sep 12-18, 2005 A. Marinov 6 Cosmic Stand Trigger Counters Setup

NEC Varna sep 12-18, 2005 A. Marinov 7 Cosmic Stand Trigger Electronics Setup

NEC Varna sep 12-18, 2005 A. Marinov 8 Cosmic Stand Data Acquisition Run Signal Recording Enable Trigger Recording Stop recording Reading the TDCs

NEC Varna sep 12-18, 2005 A. Marinov 9 Main VME Frame

NEC Varna sep 12-18, 2005 A. Marinov 10 Data Format From the TDC 64 bit channel information 1 time bin is 10ns bit presenting the time information from each TDC 64 bit channel information 0000……

NEC Varna sep 12-18, 2005 A. Marinov 11 Software and Computing DAQ PC Database PC MXI bus TCP/IP Tracking PC CAEN 1527 HV power supply TCP/IP I2C Multiplexer For slow control RS232 Control PC

NEC Varna sep 12-18, 2005 A. Marinov 12 Software and Computing DAQ PC MXI bus Pentium GHz 512Mb RAM 120GB HDD Linux Platform Using standard drivers from National Instruments for the MXI/PCI controller. Running Software Offline Analyses Software Online Tracking engine

NEC Varna sep 12-18, 2005 A. Marinov 13 Data From Cosmic Test Strips Profile Using only 2 scintilators from the top and 2 form the bottom layer

NEC Varna sep 12-18, 2005 A. Marinov 14 Data From Cosmic Test Strips Profile Coincidence with 2 scintilators from top, 2 from bottom and small counter placed on sector B.

NEC Varna sep 12-18, 2005 A. Marinov 15 Data From Cosmic Test Noise and Time distribution Time bins (1bin is 10ns) Counts 400ns 60ns Noise

NEC Varna sep 12-18, 2005 A. Marinov 16 Data From Cosmic Test Time Distribution

NEC Varna sep 12-18, 2005 A. Marinov 17 Data From Cosmic Stand Efficiency and Cluster Size Scanning for efficiency and Cluster size values at different voltages.

NEC Varna sep 12-18, 2005 A. Marinov 18 Online Tracking Software

NEC Varna sep 12-18, 2005 A. Marinov 19 Continuously H.V. Monitoring Recording the HV currents every 2 min, and store the data in to the Database. Including the environment conditions. Temperature and Humidity

NEC Varna sep 12-18, 2005 A. Marinov 20 Database Online HV monitoring and QC IV data storage Searchable tracking for individual Gaps / Chambers Production QC procedures Mechanics Cosmic Tests VISIBLE SEARCHABLE WORLDWIDE Chamber QC dataGas gaps QC data Environment conditions data DATABASE Production data Results form Cosmic Test

NEC Varna sep 12-18, 2005 A. Marinov 21 Quality Control and Certification for CMS installation Checklists are included in all production steps Quality control and measurements for the gaps Cosmic Test Data for Noise, Strips Profile, Efficiency, Cluster Size, HV monitoring, Environment conditions. Certification file for each Endcap RPC Detector

NEC Varna sep 12-18, 2005 A. Marinov 22 Summary and Future Summary All tests and QC for RE chambers are set up. 100 chambers (RE) are Quality Certificated and ready for Installation in CMS experiment Production and QC processes are in time. To do Optimizing the tracking software