1 Message from Management Resources for 2014 oversubscribed Need to descope Minimal 2014 work Reschedule (Delay) some work to 2015 Groups:  Define Critical.

Slides:



Advertisements
Similar presentations
Some beam tuning musings from Fall 2004 runs David Hertzog.
Advertisements

AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Preparation for May-2013 Review of UCN Beamline March 27, Date: May 2-3, 2013 Review Committee finalized Scope – Overall concept, focusing on 2014.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
ACTIVITY J A J O J A Schedule( ) UCN Timeline & Major Milestones Remove.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
1 LEReC Funded! From: Fedotov, Alexei Sent: Thursday, May 14, :04 PM Subject: LEReC project approved Dear All, FYI. The LEReC project is now formally.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
UCN 2014 Installation Overview/Logistics UCN Monthly Meeting Dec.18, 2013 (L.Lee)
2014 Shutdown Schedule & UCN FY-2013 Resources 1 February 20, 2013.
Vault-BL1A Shielding Plug Sept 26, 2012 L.Lee. N UCN Installation-1: 2014 Shutdown Shielding “Plug” will need to be reconfigured.
PAUL SCHERRER INSTITUT CERN / Oct / P.A.Schmelzbach.
Slide 1 Copyright © 2015, 2011, 2008 Pearson Education, Inc. Factors and Prime Factorization Section2.2.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
BL1U at TRIUMF UCN Beamline BL1U Layout (Nov 2011) C.A.Davis.
05 m 10 m 12 mr 145 mr 18.5  deflection: 40  OVERVIEW: UCN Facility in Meson Hall.
UCN 2014-Shutdown Schedule UCN Monthly Meeting (July 24, 2013) L.Lee, C.Marshall.
UCN Facility Working Group October 3, 2012 OverviewL.Lee MCNPX and ShieldingP.Carlson Beam MonitorsC.A.Davis / A.Konaka.
BL1U at TRIUMF UCN Beamline Kicker Magnet (April 12, 2010)
UCN Facility at TRIUMF L.Lee October 3, 2012 PLACE UCN LOGO & ACRONYM HERE.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
BL1U at TRIUMF UCN Beamline Septum & Dipole Magnets (April 12, 2010)
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
12 GHz Stand alone power source. Provisional Klystron Parameters ParametersSpecificationsunitsObservations RF Frequency12 (11.4)GHz Peak RF power50 -75MW.
Resources, Timeline & Contingency UCN CDR (Sept/2010)
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Extraction and beamline progress B.Goddard TE/ABT.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
PX FY14 Budget PXIE Infrastructure R. Stanek J. Leibfritz.
Possible Layout of Positron Target Region Peter Sievers and Kaoru Yokoya MiniWS, KEK 2016/4/19 Target Region Layout, Yokoya 1.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
Vendor Date VALU Monthly Project Review (VMPR) Project Name/IN #
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
SOLEIL OPERATION AND ON-GOING PROJECTS C. Herbeaux On behalf of SOLEIL Groups C. Herbeaux, November ESLS23, 24-25, 2015, PSI1.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Decommissioning of CTF3 Nothing has been studied on the cost, manpower needed, environmental impact (RP) etc. This is just to raise some points that may.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Nuclear Physics LOS ALAMOS NATIONAL LABORATORY 1 Line B preparations Hardware issues Install Fast Kicker (up to 200  C/sec). Reinstall Line B transport.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
UCN and SCRF/ISAC interface issues ● proposal for UCN (CFI, 2008) – 10 uA at 25% duty cycle (1 min on, 3 min off) – use BL4A (TISOL) ● duty cycle is incompatible.
EHN1 Extension planning
News and brief overview of Beamline plans for the next few months
The situation for the coated magnets and what we learned in the LS1 installation: M.Taborelli, for TE-VSC.
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Upgraded Injector Test Facility
Injector / Linac Installation Current Status
Extraction Michael Bevins May 17, 2007
Trillo Apparel Company Revised Delivery Plan
ThomX – Commissioning Meeting – 25/01/2018
Specifications for the XFEL Beam Switchyard Kickers
Development Work Group 194
Presentation transcript:

1 Message from Management Resources for 2014 oversubscribed Need to descope Minimal 2014 work Reschedule (Delay) some work to 2015 Groups:  Define Critical Constraints for projects  Define possibilities to change of scope  Define items that need to be or can be completed ASAP  Identify/hire temporary resources UCN 2014 Installation Plans/Options UCN Monthly Meeting (Sep.18, 2013) (LL, 9/18/13)

UCN Installation Timeframes N 2014 Shutdown 2015 Non-Shutdown & 2016 Shutdown 6 months 2015 Shutdown 6 months 4 months 2

UCN 2014 SAS Projects 3 SASP0184 SASP0185 SASP0186 SASP0187 SASP0188 Removal & Reconfiguration of Vault-1A Shielding (“Shielding Plug”, Major block lift, storage of warm blocks) Installation of UCN Septum and associated subsystems (Septum magnet, 1AM5 “long harp”, 1AM4.7 BPM) Installation of Services for UCN beamline (Includes req’d access to services “trench” below “Shielding Plug”) Installation of upstream UCN beamline (BL1U Section 0) (Section from “Shielding Plug” to Immov.-Block; Dipole, Girder, etc) Installation of UCN components in the vault section (Remove/shift 1V components, install Kicker stand & 1VM4, tilt 1V section between Kicker & 1BVB2)  UCN 2014 Installation subdivided into 5 “Projects”

UCN-2014 Installation N 4 SASP0184 (Shield-Plug) SASP0185 (Septum) SASP0186 (Services-trench) Must be completed to decouple future UCN installations from Cyclotron Operations

UCN-2014 Installation N 5 SASP0184 (Shield-Plug) SASP0185 (Septum) SASP0186 (Services-trench) SASP0187 (BL1U, Section-0) SASP0188 (Vault Section) Delay Vault section Install’n (1BVB2 & upstream) to 2015: - Have to access Vault for Kicker install’n in 2015 anyways - Need manpower with TRIUMF "historical knowledge” (i.e. use of contractors less effective). - Spatially separated from other 2015 install’n activities Best Effort on BL1U.0 Install’n (best effort 2014, finish in 2015): - Shutdown is long, access available to UCN’ers & contractors anyways - Use of contractors/“new hires” can be effective (i.e. coring, new B/L) - BL1U.0 comp’s can be “placed”, & aligned/re-aligned later if necessary (Can avoid lifting shielding blocks again in 2015 if comp’s “placed”)

T-BL.T-Mech.T-Plant.T-VacSafety.Tr-Elec.Tr-Plumb.E-ElecMH.CoordContractrUCN-eng T-BL.T-Mech.T-Plant.T-VacSafety.Tr-Elec.Tr-Plumb.E-ElecMH.CoordContractrUCN-eng No 1V (Vault Section), Best effort BL1U.0 (BL1U,Sec.0) Installation [ SASP0184, SASP0185, SASP0186, SASP0187, SASP0188 ] T-BL.T-Mech.T-Plant.T-VacSafety.Tr-Elec.Tr-Plumb.E-ElecMH.CoordContractrUCN-eng FTE Days FTE Wks FTE Mths FTE Days FTE Wks FTE Mths FTE Days FTE Wks FTE Mths Best effort Full UCN-2014 Installation [SASP0184, SASP0185, SASP0186, SASP0187, SASP0188 ] No 1V (Vault Section) Installation [SASP0184, SASP0185, SASP0186, SASP0187, SASP0188 ] UCN-2014 Installation Scenarios (Resources) 6

Previous Slides

T-BL.T-Mech.T-Plant.T-VacSafety.Tr-Elec.Tr-Plumb.E-ElecMH.CoordContractrUCN-eng No 1V (Vault Section) Installation [SASP0184, SASP0185, SASP0186, SASP0187, SASP0188 ] Full UCN-2014 Installation [SASP0184, SASP0185, SASP0186, SASP0187, SASP0188 ] T-BL.T-Mech.T-Plant.T-VacSafety.Tr-Elec.Tr-Plumb.E-ElecMH.CoordContractrUCN-eng FTE Days FTE Wks FTE Mths FTE Days FTE Wks FTE Mths Delay Vault section (1BVB2 & upstream) Installation: - We have to go back into Vault to do the Kicker later anyways - May need manpower with TRIUMF "historical knowledge" (i.e. contractors or “new” hires probably not an effective option)

T-BL.T-Mech.T-Plant.T-VacSafety.Tr-Elec.Tr-Plumb.E-ElecMH.CoordContractrUCN-eng T-BL.T-Mech.T-Plant.T-VacSafety.Tr-Elec.Tr-Plumb.E-ElecMH.CoordContractrUCN-eng No 1V (Vault Section), Best effort BL1U.0 (BL1U,Sec.0) Installation [ SASP0184, SASP0185, SASP0186, SASP0187, SASP0188 ] T-BL.T-Mech.T-Plant.T-VacSafety.Tr-Elec.Tr-Plumb.E-ElecMH.CoordContractrUCN-eng FTE Days FTE Wks FTE Mths FTE Days FTE Wks FTE Mths FTE Days FTE Wks FTE Mths Delay Vault section (1BVB2 & upstream), Best effort on BL1U.0 Install’n: - Shutdown itself is long, access available to UCN’ers & contractors anyways - Use of contractors/“new hires” more effective (i.e. coring, new beamline) - BL1U.0 Components can be “placed”, aligned/re-aligned later if necessary (Can avoid lifting shielding blocks again in 2015 if components “placed”) Best effort Full UCN-2014 Installation [SASP0184, SASP0185, SASP0186, SASP0187, SASP0188 ] No 1V (Vault Section) Installation [SASP0184, SASP0185, SASP0186, SASP0187, SASP0188 ]