Brief Introduction of KEK Linear Collider Project Office Akira Yamamoto KEK Report provided for ILC-TB Meeting, 2013-4-12.

Slides:



Advertisements
Similar presentations
SIXTH MEETING OF THE ILC PROJECT ADVISORY COMMITTEE (PAC) 19/20 May 2011; Institute of Physics, Academia Sinica, Taipei, Taiwan 1.
Advertisements

R. Corsini LCWS12 – Arlington 26 Oct Summary of system tests R. Corsini, H. Hayano.
SLAC Accelerator Research and Introduction to SAREC Tor Raubenheimer FACET Users Meeting August 29 th - 30 th, 2011.
LCC status Lyn Evans 1April 18, 2015PAC Orsay. ILC in Linear Collider Collaboration 2 ICFA Chair: J Mnich Program Adv. Committee PAC – Chair: N. Holtkamp.
6-7 April 06 MAC Review Global Design Effort 1 RDR Overview Organization, Schedule, Approach and Goals Barry Barish GDE Caltech.
Status of International Linear Collider Global Design Effort Barry Barish (by telecon) HEPAP Washington DC 18-May-05.
20 April 06 P5 - SLAC Global Design Effort 1 ILC Update from the GDE Barry Barish GDE Caltech.
The Path Toward a Linear Collider Barry Barish HEP 2005 Lisbon, Portugal 23-July-05.
ILC Status Report Mike Harrison AWLC14 1 AWLC14 Fermilab May 2014 Mike Harrison.
Particle accelerator and Advanced accelerator technologies Advanced Instrumentation and Detector technologies Advanced Light Source Application of Accelerator.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
LCB/ICFA meeting at Newport News with full snow, February This is only for TB meeting Presentation and not for Distribution. ( )
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
22-May-06 FALC - Rome Global Design Effort 1 Report on Progress of the GDE Barry Barish GDE.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Status of Linear Collider Activities Rika Takahashi on behalf of the LC Communicators 104 November, 2013 Interactions US.
STF Plan & Schedule H. Hayano, KEK. Superconducting RF Test Facility Comprehensive Test Facility dedicated to ILC SC-RF R&D (expandable to FEL, ERL) for.
STF Status and Future plan H. Hayano, KEK, LCWS12 Arlington System Test session 1.
050928ICFA seminar Daegu 1 Inter-University Research Institute Corporation High Energy Accelerator Research Organization KEK Yoji Totsuka.
Low Emittance RF Gun Developments for PAL-XFEL
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
ILC Accelerator Status Lyn Evans, CERN, Imperial College London 1A. Yamamoto, LCB ILC Acc. Status.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
8 May 06 ILCSC Report Global Design Effort 1 GDE R&D Program RDR Status and Plans Barry Barish GDE Caltech.
The International Linear Collider and the Future of Accelerator-based Particle Physics Barry Barish Caltech Lomonosov Conference 20-Aug-2015 ILC.
Objectives ‒Overview the ILC cryogenics design and further optimize it, to provide reliable inputs for CFS work during the ILC preparation phase. ‒Focusing.
ILC WG2 (Main Linac System) status & report H. Hayano, KEK.
Workshop Goals Marc Ross LC May, 2013 Accelerator Plenary.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
Status of ILC Project Nick Walker – DESY ILD Meeting – Cracow –
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
HEPResearchers Set-up JLCB and JLCC ~6 Cite Decision Design ILC Lab. Japan Policy Council Positive Reference from New Prime Minister.
THE INTERNATIONAL COMMITTEE FOR FUTURE ACCELERATORS (ICFA) Roy Rubinstein2nd International Conference on New Frontiers in Physics - 4 September
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
Status of ILC Activity in KEK H. Hayano, KEK APPI 03/10/2005.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Advanced Accelerator Association (AAA) Promoting Science and Technology - Activities with Technology Group : A. Yamamoto AAA Activities, Japan.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Technical Board: Fuze: 毎週火曜日 22:00 〜 23:00 、臨時: LCWS など – 2013 年〜今までに 28 回開催 – 各 review, workshop, FALC などの報告 – 各国の状況(日本の有識者会議,… ) – X-FEL, LCLS-II, STF,
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
Welcome and the ATF2 international collaboration in future 1.Introduction 2.Mission of ATF/ATF2 3.Organization of ATF/ATF2 4.International Collaboration.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
P5 Potential US Accelerator Collaboration with the ILC-in-Japan Mike Harrison Mike Harrison.
SRF Accelerator Technology Development in Japan Akira Yamamoto (KEK) 1 1.Progress highlighted 2.Prospect for realizing the ILC A. Yamamoto, 16/03/24SRF.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
17-21 April 09 AAP - Tsukuba Global Design Effort 1 First Results of Geological Investigations of Dubna Siting of Dubna Siting Status of the ILC activity.
Nan Phinney SLAC ILC Worldwide Event, Fermilab, June 12, 2013 (Many slides courtesy of Marc Ross, Akira Yamamoto, Barry Barish) ILC Accelerator A 25-year.
ILC Accelerator Activities in Japan
Introduction and Meeting Objectives
LCC L. Evans, Santander, 2nd June 2016
ICFA Report to C11 August 2016 to August 2017 J. Mnich (DESY)
Introduction Summary of LCWS13/accelerator
SCRF Monthly WebEx Meeting Sept. 22, 2010
ICFA Report to ICHEP 2016 August 2015 to August 2016 J. Mnich (DESY)
Annual ILC detector meeting K. Kawagoe (Kyushu)
BAW Prep S1 Global Status Pilot Plant Status
Report from ICFA ICFA mission and membership ICFA Panels ICFA and ILC
ILC Global Design Effort
Barry Barish GDE Caltech
Electron Source Configuration
Yasuhiro Okada, Executive Director, KEK
Presentation transcript:

Brief Introduction of KEK Linear Collider Project Office Akira Yamamoto KEK Report provided for ILC-TB Meeting,

KEK Organization

– Institute of Particle and Nuclear Study – Institute of Materials Structure Science – Accelerator Laboratory 1, 2, JPARC 3, 4KEKB 5Injector Linac for KEKB and PF 6Acc. R&D including ILC 7PF-Ring and ERL – Applied Research laboratory Cryogenics Science Center – Advanced Accelerator Technologies Linear Collier Project Office ERL Project Office

FY2013: LC Project Office organization LC Project Office Head / Deputy HeadsA. Yamamoto / H. Hayano, K. Fujii, T. Shidara AAT budget execution : S. Yamaguchi (Head: Acc., #6) Secretary:T. Shirakata Communication : R. Takahashi, N. Kobayashi Technical Associates: – ATF:N. Terunuma, T. Tauchi – STF: H. Hayano – SCRF CavityE. Kako – SCRF cavity fabrication in houseM. Yamanaaka – Cryomodule and cryogenicsH. Nakai – HLRF and LLRFS. Michizono – Beam Dynamics K. Kubo – Physics and Detector, MDIK. Fujii, – CFSA. Enomoto, M. Miyahara – Accelerator Design K. Yokoya Meetings : Regular weekly meeting Every Monday: 9:30 ~ 11:00 KEK LC Promotion Committee Every two month 13/04/08KEK-LC-Meeting4

Function of KEK LC Office Roles – Program Coordination ILC Accelerator Design, R&D, CFS design, Geological Survey Support for the ILC to be hosted by Japan Coordination for International and domestic cooperation – Interface to global cooperation with LCC – Coordination of domestic cooperation – Linkage to International cooperation to/from the KEK internal coordination/activities 12/04/16KEK-LC-Meeting5

Share of Responsibilities Dept. of AAT & LC Project Office to: – Planning and Coordination for accelerator R&D and design study – Planning and execution of the geological survey Accelerator Laboratory – Execution of the R&D and design study agreed, Institute of Particle and Nuclear Study – Execution of the R&D and design study agreed, 12/04/16KEK-LC-Meeting6

Cooperation Diagram Int. Collab ICFA LCC Domestic Collab. University AAA 12/04/16KEK-LC-Meeting7 – Institute of Particle and Nuclear Study – Institute of Materials Structure Science – Accelerator Laboratory 1, 2, JPARC 3, 4KEKB 5Injector Linac for KEKB and PF 6Acc. R&D including ILC 7PF-Ring and ERL – Applied Research laboratory Cryogenics Science Center – Advanced Accelerator Technologies Linear Collier Project Office ERL Project Office Dept. of Adv. Acc. Tech. Director : Y. Okada LC Project Office Head: A. Yamamoto KEK internal Collab. ACC IPNS Acc. Lab. Director K. Oide

LCC Directorate LC Project Office (KEK) Head: Akira Yamamoto Deputy: H. Hayano K. Fujii T. Shidara ILC Collaboration Director – Mike Harrison (BNL) Deputy Director – Hitoshi Hayano (KEK) Technical Board Nobuhiro Terunuma (KEK) Yasuchika Yamamoto (KEK) Nick Walker (DESY) Olivier Napoli (CEA) Marc Ross (SLAC) Nikolay Solyak (Fermilab) ILC Technical Board – in LCC phase Feb 2013 Mike Harrison 8

KEK ILC R&D Plan beyond TDR Cavity gradient improvement with further production of cavities, at least another 4 cavities in JFY2013, with industry Cavity production in house, and industrial fabrication technology R&D in cooperation with industry STF program for CM1 (8 cavity + SCQ) + CM2a (4 cavities) to realize the beam in 2014 or later, ATF program for smaller beam size (to be 37 nm) and the nano-stability, and …

CM1( 既存 ) Undulator Beam Dump SC RF-Gun CM2a+2b ■ Objective High Gradient (32 MV/m) => Demonstration of full cryomodule ・ Pulse and CW operation (for effectuve R&D ・ Better efficiency power sources ・ SCRF electron gun ・ Training for next generation s CM0 BC CM3a +3b, Electron Gun Full Cryomodule s Undulators Detector Refrigeration System A. Yamamoto, 13/04/05ILC10 Proposal: -Multiple Cryomodule for system study -In-house Cavity to be installed in cooperation with industry -Wide range application including Photon Science

STF phase 2 STF phase 3 (New Possibility 1) Cavity/CM: 2+8+(4+4) Beam: 524MeV, 9mA, 5Hz STF phase 2STF phase 3 Cavity/CM: 2+8+(4 +4)+(4+4)+… (max. capacity in current tunnel: 2 +32) Beam: 1.0GeV max, 9mA, 1ms, 5 Hz including capability of CW operation 57m 50m35m CM2a CM3a + CM3b CM4a + CM4b CM1 H. Hayano CM2b

SCRF Acc. R&D + User Facility: Possibility 1 STF Phase 3 + Quantum-Beam 2 : under discussion 1GeV SC-LINAC Beam Facility: -Inverse-Compton X-ray -Undulator SASE photon -Beam diagnostic development Laser cavity Undulator for SASE Beam diagnostic beam line STF phase 2+ phase 3 85m STF Quantum-Beam 2 80m Extension X-ray user photon user Existing tunnel accelerator user Tunnel extension required H. Hayano 12/08/06, A. YamamotoLC Project12

Plan of STF R&D beyond TDR CY2011 CY2012 CY2013 CY2014 TDR Review GDE Functioning CY2015CY2016 TDR 13 ILC next-phase Cryomodule (CM-1) Construction Operation 2014 or later -cool-down -cold-test -beam-test CFF Cavity mass production R&D STF QB Construction Operation TDR complete ILC CM-2a Construction A. Yamamoto, 13/04/05ILC Beyond TDR toward ILC Construction

CY ATF 長期計画 ( 案 ) Gamma-gamma laser system R&D High Field Physics Nano beam orbit control (FONT extension) Develop.(2n mBPM, Fast FB) 2nm stab. R&D Beam study 2nm steady op. Nano beam orbit control Beam study Challenging R&D of the Very high chromaticity optics Ultra small beam ~ 20 nm Small beam 37nm Steady op. Develop. / beam study 4-mirror optical cavity (LAL/KEK) Gamma- gamma collider R&D General R&DEx) for KEKB; CSR, RF gun, Instrument develop., Low emittance,… Test beamline for detector? Delay by fire and earthquake Application Next KEK RoadmapGDE ATF Future Plan ILCothers 14A. Yamamoto, 13/04/05ILC

Further Possibility A new budget is anticipated – Facility for Center of Innovation (COI) A facility for Cryomodule Assembly and General Test station is anticipated to be built, in cooperation with Japanese industries. We will expect more industrial partnership – We need to receive “operational funding”, including human resources. – Further information will be available hopefully within a month. – I will ask Hitoshi to be more practically in charge of this further activity as the deputy head of LC project office.

17 ICFA Chair: P. Odone Linear Collider Board Chair: S. Komamiya Program Advisory Committee Directorate – Director: L. Evans - Deputy (Physics) H. Murayama ILC – Mike Harrison - Deputy: H. Hayano Physics & Detectors – H. Yamamoto CLIC – S. Stapnes Regional Advisors TBA FALC Chair: Y. Okada A. Yamamoto, 13/04/10International Linear Collider Linear Collider Collaboration