Thursday Summary of Working Group I Initial questions I: LHC LUMI 2005; 2.9.2005; ArcidossoOliver Brüning 1.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

Ramesh Gupta, BNL D1 Dipole Design / IR Magnet Study LARP Collaboration Meeting, Oct 5-6, D1 Dipole Design Task (terminated in 2005) IR Magnet Study.
Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Block-coil NbTi dipoles for 6 Tesla Rapid-cycling SuperSPS
24/01/08Energy deposition, LIUWG, Elena Wildner1 Upgrade phase 1: Energy deposition in the triplet Elena Wildner Francesco Cerutti Marco Mauri.
1 LHeC Considerations for a Lepton Hadron Collider Option for the LHC F. Willeke, BNL The 4th Electron Ion Collider Workshop Hampton University,
ENERGY DEPOSITION IN HYBRID NbTi/Nb 3 Sn TRIPLET CONFIGURATIONS OF THE LHC PHASE I UPGRADE FermilabAccelerator Physics Center Nikolai Mokhov, Fermilab.
Summary of Session 1: Optics and Layout P. Raimondi.
Overview of Possible LHC IR Upgrade Layouts CARE HHH-2004 Workshop CERN 8-11 November 2004 J. Strait, N.V. Mokhov, T. Sen Fermilab bnl - fnal - lbnl -
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Superconducting Large Bore Sextupole for ILC
HL-LHC WP2 Brainstorming Meeting 1 Purpose of this meeting:  Introduce the main objectives of the new HL-LHC project: Prepare technical proposal by 2013.
E. Todesco PROPOSAL OF APERTURE FOR THE INNER TRIPLET E. Todesco CERN, Geneva Switzerland With relevant inputs from colleagues F. Cerutti, S. Fartoukh,
E. Todesco DESIGN STUDY FOR THE LHC UPGRADE WP3: MAGNETS E. Todesco CERN, Geneva, Switzerland Thanks to O. Bruning, G. De Rijk, T. Nakamoto, J. M. Rifflet,
Magnets for muon collider ring and interaction regions V.V. Kashikhin, FNAL December 03, 2009.
Aug 9, 2008S. Kahn -- HCC Magnet Plans1 HCC Magnet Future Plans Steve Kahn Aug 9, 2008 NFMCC Friday Meeting.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
Bnl - fnal- lbnl - slac US LHC Accelerator Research Program A Quadrupole Design for Crab Cavity Optics Ramesh Gupta Brookhaven National Laboratory Upton,
Review of Quench Limits FermilabAccelerator Physics Center Nikolai Mokhov Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011.
General Considerations for the Upgrade of the LHC Insertion Magnets
CERN Accelerator School Superconductivity for Accelerators Case study 1 Paolo Ferracin ( ) European Organization for Nuclear Research.
Optimizing IR Design for LHC Luminosity Upgrade Peter McIntyre and Akhdiyor Sattarov Texas A&M University.
Activities for LHC Upgrade at Texas A&M University Peter McIntyre Texas A&M University
Open Midplane Dipole (OMD) Design for Dipole First Layout R. Gupta (BNL), N. Mokhov (FANL) bnl - fnal- lbnl - slac US LHC Accelerator Research Program.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
11 T Dipole Project Goals and Deliverables M. Karppinen on behalf of CERN-FNAL collaboration “Demonstrate the feasibility of Nb3Sn technology for the DS.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
FCC week March 2015 Marriott Georgetown Hotel D2 for FCC P.Fabbricatore INFN Genova D2 for FCC P.Fabbricatore & S.Farinon INFN Genova Presented.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
Shielding the 140 mm option F. Cerutti, L.S. Esposito on behalf of CERN FLUKA team.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
AT-VAC SPC Nicolaas KOS Beam Screens for Inner Triplet Magnets LHC Upgrade Phase 1 Nicolaas KOS  LHC Upgrade phase 1  Inner triplet BS Requirements.
DESIGN STUDIES IR Magnet Design P. Wanderer LARP Collaboration Meeting April 27, 2006.
E. Todesco LAYOUT FOR INTERACTION REGIONS IN HI LUMI LHC E. Todesco CERN, Geneva Switzerland Acknowledgements: B. Dalena, M. Giovannozzi, R. De Maria,
08/11/2007M. Giovannozzi – CARE-HHH-APD IR’071 Optics issues for Phase 1 and Phase 2 upgrades Massimo Giovannozzi, CERN Outline: –Option for Phase 1 and.
Energy Deposition Issues in LHC IR Upgrades LHC IR Upgrades Workshop Pheasant Run, St. Charles, IL October 3-4, 2005 Fermilab LHC IR 2005 Nikolai Mokhov,
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
IR Magnets for Muon Collider Alexander Zlobin and Vadim Kashikhin Muon Collider Physics Workshop, Fermilab November 12, 2009.
A liner in the Corrector package A Cu liner has been inserted in the gap between the CBT and the coil aperture of all the corrector package elements (see.
Issues related to crossing angles Frank Zimmermann.
Ranko Ostojic AT/MEL 1.Beam heat loads 2.Magnet design issues related to heat loads.
CERN, 11th November 2011 Hi-lumi meeting
Hervé Allain, R. van Weelderen (CERN)
Energy deposition studies on magnets. Aim. First applications
Odu/slac rf-dipole prototype
LUMI06 preliminary conclusions
Hervé Allain, R. van Weelderen (CERN)
Progress in Collimation study
Yingshun Zhu Accelerator Center, Magnet Group
Large aperture Q4 M. Segreti, J.M. Rifflet
Beam-Induced Energy Deposition Studies in IR Magnets
A True Open Midplane Design Design (no structure at the midplane)
Upgrade phase 1: Energy deposition in the triplet
PROGRESS TOWARDS AN OPEN MIDPLANE SEPARATION DIPOLE
Optic design and performance evaluation for SPPC collimation systems
Large aperture Q4 M. Segreti, J.M. Rifflet
Wednesday Summary of Working Group I
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Frank Zimmermann & Walter Scandale
Muon Collider Magnet Technologies/Challenges
Pushing the LHC nominal luminosity with flat beams
Muon Collider SR and IR Magnets
Thursday Summary of Working Group I
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Review of Quench Limits
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
Upgrade on Compensation of Detector Solenoid effects
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

Thursday Summary of Working Group I Initial questions I: LHC LUMI 2005; ; ArcidossoOliver Brüning 1

Thursday Summary of Working Group I Initial questions II: LHC LUMI 2005; ; ArcidossoOliver Brüning 2

Thursday Summary of Working Group I main points from morning session for working group I: LHC LUMI 2005; ; ArcidossoOliver Brüning 3 -create a repository for different layout configurations and optics solutions  common data base for future studies  common reference for future discussions  will be discussed on Friday -interesting modular proposal for maximizing F by additional dipole inside experiment  all insertion scenarios benefit  should be pursued independently of final IR design -NiTi is not a viable solution for IR upgrade  is this true for all IR layout and optics proposals (e.g. low gradient triplet solution)?  will be discussed on Friday

Thursday Summary of Working Group I main points from Peter McIntyre’s presentation I: LHC LUMI 2005; ; ArcidossoOliver Brüning 4 -two options for dealing with the increased heat load inside the triplet magnets: 1) construct more robust triplet magnets that can tolerate the increased peak heat load 2) reduce the peak heat load with an upgrade of the TAS absorber:

Thursday Summary of Working Group I main points from Peter McIntyre’s presentation II: LHC LUMI 2005; ; ArcidossoOliver Brüning 5 1) construct more robust triplet magnets that can tolerate the increased peak heat load  structured cable design with Ni 3 Sn and Inconel 718 jacket  Iron less quadrupoles for Q1 with 340 T/m; 40mm aperture; and expected heat tolerances of > 50 W/m  Strong mechanical support and low inductance for “large” quench induced voltages  Confidence that Ni 3 Sn is matured technology by 2010?  Disuccion: Inconel jacket could also be used with NiTi?

Design Q 1 using structured cable 6-on-1 cabling of Nb 3 Sn strand around thin-wall inconel X750 spring tube Draw within a thicker inconel 718 jacket Interior is not impregnated – only region between cables in winding Volumetric cooling to handle volumetric heating from particle losses

Thursday Summary of Working Group I main points from Peter McIntyre’s presentation III: LHC LUMI 2005; ; ArcidossoOliver Brüning 7 2) reduce the peak heat load with an upgrade of the TAS absorber:  levitated dipole coil design with opening at room temperature  B = 8.7 T at 4.5 K; Ni 3 Sn only at inner coil NiTi otherwise  interesting magnet design for a magnetic TAS option

D 1 : levitated-pole dipole Cold iron pole piece, warm iron flux return. Cancel Lorentz forces on coils, pole steel. 8.7 T 4.5 K

Thursday Summary of Working Group I main points from Rama Calaga’s presentation: LHC LUMI 2005; ; ArcidossoOliver Brüning 9 -compensate Lorentz force on the coils by using two race track coils  15 T field for Ni 3 Sn and 8T for NiTi -open mid plane and possibility of installing dedicated absorber material  Interesting option for magnetic TAS design  Who is following this research up? US-LARP has decided to suspend dipole R&D and to concentrate on quadrupoles!

OMD Design Challenges Counteracting large vertical forces between the coils without any structure appears to be a challenge. Good field quality maybe a challenging task due to large midplane gap. Large B peak /B center ratio in magnets with large midplane gap may reduce operating field. The optimum design may look totally different.

In earlier “OMD designs”, absorbers were placed between the the coils. Secondary showers from the absorber deposited a large amount of radiation and heat load on the coils. This problem is fixed in the new design. A True Open Midplane Design

Thursday Summary of Working Group I main points from Frank Zimmermann’s presentation I: LHC LUMI 2005; ; ArcidossoOliver Brüning 12 -geometric reduction factor can be reduced with the help of CRAB cavities (transverse kick  alternative to JPK dipole) -LHC parameters requires between 4MV (small crossing angle) and 100 MV voltage for f = 400MHz  800 MHz -small emittance blowup requires turn-by-turn phase control of better than 0.01 degrees -CRAB cavities require sufficient large beam separation (  installation after D2 plus dog leg separation?)

Super-KEKB crab cavity scheme 2 crab cavities / beam / IP

voltage required for Super-LHC