Match Existing, Really? This is a very common requirement It makes sense, as who would “avoid matching existing” ? As I hope to point out, we need more.

Slides:



Advertisements
Similar presentations
Contracts for Builders Ross Kinzler, Executive Director.
Advertisements

MASBO February Information to purchase Services Information to purchase Construction.
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Gage R&R Estimating measurement components
Construction Engineering 380 Subsurface Conditions.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
ACI “Standard Specifications for Tolerances for Concrete Construction and Materials” gives (2) tolerances for suspended slabs on metal deck: Thickness.
General Services Division / Special Research & Investigation Section SUBCONTRACTING LAWS and CITY REQUIREMENTS “Okay, so there are rules. But it seems.
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Project Monitoring Section B 1.
COST CONTROLS OF CAPITAL COSTS THROUGHOUT THE DESIGN PHASE Presented by Planning & Management Services, Inc Federal Way, WA (near Seattle) Western Winter.
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
1 Qualitative Independent Variables Sometimes called Dummy Variables.
Quality Control/Quality Assurance Quality Assurance……. ….encompasses both quality engineering and quality control Quality Assurance is……. …..the application.
Measures of Variability or Dispersion
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
Critique of Research Outlines: 1. Research Problem. 2. Literature Review. 3. Theoretical Framework. 4. Variables. 5. Hypotheses. 6. Design. 7. Sample.
More Acceptance... Contracts – Prof. Merges
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
PROCURING APPRAISALS. Best Value Approach Mr Edward Biggers Dr. Pauline Tonsil.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Six Cert IV - M. S. Martin March 2012.
Contract Financing Theresa A. Stevens March 12, 2007 Part 2 Non-Commercial Item Purchase Financing FAR Subpart 32.1 PIP Level II Presentation.
Club Audit Module In performing an inspection of the records of an organization, there are two main types of operations which can be undertaken – a Review.
Introductory to the “Basics” of Contract Types and Their Impact in the Management of Government Property Presented by: Fay K. Schulte, CPPM.
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guide for Methods of Measurement.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
DESIGN POSSIBILITIES FOR SURVEYS.  Also known as the “ad hoc sample survey”, this is the survey in its simplest form. This survey involves collecting.
TALKING TO THE PATIENT AND FAMILY!. While talking to the patient and their family… *Sit down and make eye contact with the patient and their family.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
Instructore: Tasneem Darwish1 University of Palestine Faculty of Applied Engineering and Urban Planning Software Engineering Department Requirement engineering.
Multiple Award Contracts Training Presented by Jennifer Salts State of Utah - Division of Purchasing 1.
Is Your JOC Program Audit Worthy? z Scott Creekmore.
Creator: ACSession No: 16 Slide No: 1Reviewer: SS CSE300Advanced Software EngineeringFebruary 2006 (Software Quality) Configuration Management CSE300 Advanced.
1 Developing the Specification/ Statement of Work Susan Georgis Master Agreements & Contracts Ben Martin Procurement Engineering.
INFO 637Lecture #51 Software Engineering Process II Defining Requirements INFO 637 Glenn Booker.
The Application of Cognitive Processes to Organizational Surveys: How Informants Report About Interorganizational Relationships Joan M. Phillips Mendoza.
SacProNet An Overview of Project Management Techniques.
Audit Sampling: An Overview and Application to Tests of Controls
Divisional Managers Commitment to the Diagnostic and Unit Rate Study Consultancy Services for Monitoring of Contractors/Consultants Performance And Establishment.
Unit 1 Conflict : Disputes & Arbitration. Objectives List and group potential causes of complaints or disputes during construction Describe the actions.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
July 14, Rural Electric Cooperatives Procurement/Contracting Guidance Roger Jones Region VIII Disaster Assistance Division.
Contractor Alternate Design Serving the Public’s Best Interest.
Chapter 8 – Lecture 6. Hypothesis Question Initial Idea (0ften Vague) Initial ObservationsSearch Existing Lit. Statement of the problem Operational definition.
The New Science Building Texas A&M International University Laredo, TX Nicole Griffith.
ASSOC.PROF.DR. İBRAHİM YİTMEN
Allowances, Unit Prices, and Alternates ACT
Work Load Assessments Practical Considerations A Training Sampler.
Contracting Process Overview Agenda Item #12 July 2007.
1 A Seminar On Pharmaceutical Outsourcing A Seminar On Pharmaceutical Outsourcing.
Outlines Overview Defining the Vision Through Business Requirements
Differing & Unforeseen Conditions Differing Site Conditions- actual conditions differ from the representation made in the contract documents (MSP airport)
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
CDM Client Briefing Tim Knowles
Adam Backman Chief Cat Wrangler – White Star Software
Construction Oversight
Coordinating Drawings & Specifications
Bidding Requirements Review Questions.
12 Steps to Useful Software Metrics
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
PRODUCT EVALUATION & TESTING BRANCH SUPPLIER SUPPORT DIVISION II
Gage R&R Estimating measurement components
IENG 486 Statistical Quality & Process Control
PROJECT DELIVERY METHODS
Allocation of Risk Arising from Subsurface Conditions
DLAD Procurement Notes & Tech/Quality Requirements
Fiber Reinforced Polymer Systems
Presentation transcript:

Match Existing, Really? This is a very common requirement It makes sense, as who would “avoid matching existing” ? As I hope to point out, we need more thought about this phrase in our industry, as it commonly becomes an issue.

Match Existing, Really? Why? What is a match? There is no definition of acceptable tolerances in most criteria for a “match”. We are performing specific tasks using specified procedures to work on a variable building.

Match Existing, Really? Why am I up here? This requirement to match is not limited when we say it. What level of effort and cost is not defined. “Match” becomes a performance spec, with no defined standard.

Match Existing, Really? What I do not see is: A tolerance criteria for acceptance of the match Acknowledgement that an “exact match” is impossible in much of what we do.

Match Existing, Really? What I do not see is: Time allowance for developing an “acceptable match” at the beginning of a contract. Defined sharing of the risk of finding “acceptable match”

Match Existing, Really? Closely or reasonably; what does that mean? For color, how many shades different meet the spec? Closely for fit and finish, and to which tolerance? Closely individually to every variation throughout the building?

Match Existing, Really? Closely; if the lead time for the approved item is 6 months, who bears the time delay? if that means unique or unusual steps not specified elsewhere, does the requirement to “match” make the contractor liable?

Match Existing, Really? Why is this an issue? The phrase is vague with no industry standard, and significant risk of misunderstanding between contractor, owner and consultant. These problems commonly are discovered after contract award.

Match Existing, Really? Common Examples

Match Existing, Really? During Sample installation No one is required to research lead time of approved material prior to award. (typ a brick match) The sample as specified may not be acceptable, so additional steps are requires, or a different material may need to be used.

Match Existing, Really? During Sample installation The owner then is upset that “match existing” is in the spec but is a Change Order and/or a delay to the contract. The owner often pushes this blame to Constant/Contractor collectively

Match Existing, Really? During the project? The sample typically does not “match existing” in all conditions The existing work typically contains work that can’t or shouldn’t be matched

Match Existing, Really? During the project? The existing conditions have more variance than your design anticipated If you have not reviewed ACI 117 for concrete tolarances, and similar standards for other materials, I suggest you take a look

Match Existing, Really? During the project? The existing conditions do not meet current code and standards

From ACI The indicated tolerances govern unless otherwise specified. Tolerance values affect construction cost. Specific use of a tolerance item may warrant less or more stringent tolerances than contained in the specification. Such variances must be individually designated by the specifier in the contract documents.

Match Existing, Really? During the project? The specifications call for minimum a different coverage, thickness, or tolerance than existing, but ultimately must “Match Existing”.

Match Existing, Really? During the project? The existing substrate has many years of previously applied materials, but the spec calls for a specific system over existing and new

To The Owner, Match=Invisible INVISIBLE REPAIRS ARE INCLUDED IN MY CONTRACT. MY LAWYER AGREES, IT IS YOUR PROBLEM, YOU BOUGHT IT