Whistler Nordic Center: A systems perspective of the Callaghan Valley EIA Process Dan Kellar Wilfrid Laurier University October 20 th 2007.

Slides:



Advertisements
Similar presentations
MODULE 1: Introduction to Environmental Assessment
Advertisements

Overview of Alaska Ecosystem Indicators Relative to EAM/EAF Objectives
Around the World & Back – How Sport Works Cross Country Ski Areas Association Annual Conference, Whistler, BC Rob Bernhardt April 15, 2009.
Chris Dandurand, P.Eng Kiewit Infrastructure Group Large Hydro Perspective on the Permitting Process & Environmental Approvals.
Energy National Policy Statements Anne Stuart DECC Energy Development Unit 22 October 2009.
Environmental Project Commitments The Alberta Experience
What services provide on Federal Lands? What are the challenges? Is there a need for our services?
Writing a Preliminary Assessment (The example of the Environmental Review Report) [DATE][SPEAKERS NAMES]
USAID Africa Bureau EIA Procedures for Sub-Projects
Consultant en énergie éolienne au service du monde Wind energy consultant for the world Wartenbe Wind Energy Project by Dokie Wind Energy Environmental.
World Forests Forests cover 30% of the world’s land surface.
GIS Study of the Kelsey-Whisky Logging Plan Jared Chapiewsky Matthew Bloch U of Wisconsin, Madison.
Virginia Wildlife Action Plan David K. Whitehurst Virginia Department of Game and Inland Fisheries.
Notice: The views expressed here are those of the individual authors and may not necessarily reflect the views and policies of the United States Environmental.
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
Knowledge on HIA IN CAMBODIA Constructing a Caring and Sharing Community Roles of HIA 4-6 October 2012 Bangkok.
What is Urban Ecology? Notes. Social Factors Interactions between humans Interactions between humans and their environment Health of people Government.
OSU Airport – Overview of Master Plan and Draft Environmental Assessment Purpose of an Airport Environmental Assessment (EA) Identify environmental impacts.
Scoping An activity within the Environmental Impact Study which aims to identify those components of the biophysical and social environment which may be.
Confidential Project Update: District of Chetwynd Bruce Wells, Vice President, Project Development February 02, 2015.
EIA’s Environmental Impact Assessments. EIA’s Required in many countries before any kind of development takes place Determines The type and degree of.
AGENDA "It is your attitude at the beginning of a task that determines success or failure.“ ---Corrine Clewlow 12 Mar Bellwork Issue and Argument.
UPPER MONUMENT CREEK LANDSCAPE RESTORATION Allan Hahn – District Ranger Mike Picard – ID Team Leader.
An Update 1 August 4,  The proposed hydro generating station at Bala Falls remains front and centre as an issue of concern to residents and cottagers.
(c) McGraw Hill Ryerson 2007 Pages 122 – 137 Words to Know:  Contamination  Deforestation  Extinction  Habitat loss ۰ Soil degradation ۰ Resource exploitation.
SALT LAKE 2002 Alpine Skiing Biathlon Bobsleigh Cross-Country Skiing Curling Figure Skating Freestyle Skiing Ice Hockey Luge Nordic Combined.
Overview of OES study Indigenous compared to non-indigenous relationships. Perceptions Interactions Impacts Management strategies Relationships Be able.
Consultant en énergie éolienne au service du monde Wind energy consultant for the world Dokie Wind Energy Project by Dokie Wind Energy Environmental Assessment.
“POLICY AND CHALLENGES ON ENVIRONMENT IN MONGOLIA – GEF COOPERATION” By J. Enkhsaikhan GEF Political Focal Point for Mongolia GEF Constituency Meeting.
Secondary & Cumulative Effects Analysis Training Program Maryland State Highway Administration’s Secondary and Cumulative Effects Analysis Guidelines For.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
US Environmental Policy Introduction
Sport And Urban Regeneration. The Commonwealth Games; 2002 In 1995, Manchester was awarded the 2002 Commonwealth Games. It also made an unsuccessful bid.
Baku By Anish and Ari. Baku Baku is the capital of Azerbaijan Baku is the largest city in Azerbaijan.
1.CLEARLY draw what might happen to the following graph if by some catastrophic event the human population was cut in half. The blank graph picks up where.
2006 Cumulative Effects Assessment CEA Definition  Potential for residual project-specific effects associated with Meadowbank project in combination.
Welcome Opportunity to Learn – Public, Groups, Agencies and FS Patience Respect Ask.
Australia, an academic perspective Associate Professor Garry Middle, Head Department of Urban and Regional Planning, Curtin University, Western Australia.
Complexities of Establishing an Automated Monitoring Network in Support of the 2010 Winter Olympic and Paralympic Games: Bill Scott Manager, 2010 Winter.
Environmental Assessment in British Columbia Forum of Federations Conference September 14, 2009.
SWIFT NETWORKING MEETING: NEW EASTERN VILLAGES (NEV) 24th September 2015 Samantha Howell Strategic Allocations Planning Manager and NEV Programme Lead.
MCA-N Activities & ESA (Environmental & Social Assessments) MCA Namibia 1.
Oregon Coast Range PAC (Province Advisory Council) Corvallis, OR, April 15, :30 AM Bob Zybach Forest Fire History & Land Use Ecologist: Five Rivers.
Kyle Hilsendager, Ph.D. 1.
Compensation Integrated into Infrastructure Planning and EIA in Finland Case: Europe E18 Motorway Turku-Vaalimaa Tiina Kähö Finnish Consulting Engineers.
(c) McGraw Hill Ryerson How Humans Influence Ecosystems Wetlands are special ecosystems that contain completely waterlogged soil for long periods.
SEA National Manual of Georgia Lia Todua SEA National Manual  targeted  specific  catching moment.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
STATUS OF IMPLEMENTATION OF 2015 ACTION PLAN ENVIROMENTAL PROTECTION AGENCY A PRESENTATION TO THE REGIONAL COORDINATING COUNCIL Sally Biney Director/EPA/ACCRA.
Inclusion of Health and Wellbeing Impacts within Environmental Assessments for Major Land-Use Planning Projects in New South Wales, Australia Patrick Harris,
Neighbourhood Planning in Haringey Myddleton Road Strategic Group 7 th November 2013.
Foundations of Technology, Third Edition/ Technology, Engineering, and Design © 2011 International Technology and Engineering Educators Association STEM.
Lecture-18: EIA (Environmental Impact Assessment) Course Instructor: Md Asif Rahman (ASR) Lecturer, Department of Mathematics and Natural Sciences (MNS)
Environmental Sustainability Towards Transforming Tanzania to a Middle Income Economy by 2025: The Challenges of Industrialization Eng. Prof. Rubhera RAM.
SCS-SGP Partnership Implementation Review
Tropical Rainforest Management in Iwokrama
Understanding Wildfires as Pollution in Northern Saskatchewan
Canmore Skiing at Sunshine (Banff)
STEMCenter for Teaching & Learning™ Engineering byDesign™
Blandy Experimental Farm Educational Center
3.2 How Humans Influence Ecosystems
STEMCenter for Teaching & Learning™ Engineering byDesign™
EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE
Sport And Urban Regeneration
Environmental Impact Assessments
STEMCenter for Teaching & Learning™ Engineering byDesign™
STEMCenter for Teaching & Learning™ Engineering byDesign™
STEMCenter for Teaching & Learning™ Engineering byDesign™
Environmental Impact Assessment EIA
Presentation transcript:

Whistler Nordic Center: A systems perspective of the Callaghan Valley EIA Process Dan Kellar Wilfrid Laurier University October 20 th 2007

Outline Introduction Historical Overview –Biophysical –Cultural-historical –Socio-economic Challenges faced in the system Methodology –Literature Review –EIA, CEA, and SEA –Influence Diagrams –Conceptual Model –Catastrophe Models –Panarchy Model Conclusions

Historical Overview Introduction: Located within the Callaghan Valley in the Costal Mountain range in British Columbia Whistler Olympic Nordic centre for the 2010 Winter Olympic Games. Approved under the harmonized review process of the CEA Act and the British Columbia EA Act. The trails and facilities will remain intact and active after the Olympic Games

Historical Overview Biophysical: Parts of the valley have been logged before leaving a mix of re- growth and old growth forest The area is on historical native lands (Lil’wat and Squamish Nations) and is home to a wide array of birds, mammals, aquatic life (EBA, 2004) and first class habitat. 50°7' N, 123°6' W 10 km west of Whistler, Accessed by a turnoff from Highway #99, about 20 km south of Whistler. It will occupy about 250–260 hectares within the valley of Callaghan Creek.

Historical Overview Biophysical: None of the impacts were found to be significant by the consulting companies CEAA and EAO worked in a harmonized process. Assessment split into two parts as additional recreational trails required additional study.

Historical Overview Cultural-historical: some deforestation through logging, though large sections of old growth forest remain. First Nations land claims to this area. Discontinuities in the promises of VANOC and the EAO and their actions. EIAs done for the Whistler Nordic Centre indicate that little to no negative impacts will come to the First Nations. AIUS done for both FNs with the help of consultants.

Historical Overview Socio-economic: Past and present logging. Source of income for FN through hunting/trapping. Value of a spiritual place?

Proposed Changes to System Clearing of a combination of old growth (38ha) and replanted forest The construction of: –roads –utility infrastructure –buildings –parking facilities –paved and unpaved trails for snow-shoeing along with cross- country skiing and summer training –a ski jump facility (permanent) –three open air stadiums (at start/finish areas of the courses) –multiple outdoor shooting ranges for the biathlon event

Lake Placid Ski Jump Site

Challenges faced in the system The removal of habitat and introduction of paved roads, buildings and lights. More human-nature interaction possibilities. Not ruining the natural systems Not polluting the system Keeping the spiritually important places untouched. Integrating Native and public concerns into the EIA, construction, operational, and legacy phases of the project.

Methodology - Literature Review CEAA and EAO documents and EA Acts Personal Communications: Concerned citizens FN representative EAO and CEAA VANOC and IOC Environmental statements Citizen Group Web pages Text: Panarchy - Gunderson & Holling Text: Ecosystem Sustainability and Health – Waltner- Toews Text: Science of Sustainable Development – Sayer & Campbell Text: EIA: Practice and Participation

Methodology - Conceptual Model

EIA Supposed to be inclusive of FNs, Public, Gov’ts. Incompatibilities resulted in 2 EIAs Since CEAA was involved, CEA should have taken place. Snowmobile trails moved to another valley – EIA did not mention impacts to other valley.

SEA Project part of the Olympic developments No formal SEA was done on the Olympics as a whole. No CEA was done on the Olympic projects as sub-projects of the Olympic System.

Methodology - Influence Diagram

Methodology - Catastrophe Model

Methodology - Panarchy Model #1 Historical

Methodology - Panarchy Model #1 Present

Methodology - Panarchy Model #3 Future

Methodology - Catastrophe Model

Conclusions Drastic changes occurring in system Despite best ‘science’ effects of change are truly unknown, or at least unreported. Traditional FN use may be at an end due to the Development of the Nordic Center FNs on site during construction to monitor. “Spot Checks” by EAO not frequent. –Enforcement?

Conclusions What is point of conditions if there is no capacity to monitor and enforce? Harmonization difficulties. –“CEAA does not grant or deny certificates, they approve submissions” Was EIA effective and inclusive? – Time will answer.

This presentation available at : The paper is available at: