CTC, Outcome from Two-beam Module Review on15/16.09.2009 G. Riddone, 20.10.2009.

Slides:



Advertisements
Similar presentations
CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
Advertisements

PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Mechanical design, analysis and integration of pre-alignment systems for CLIC M.Anastasopoulos / BE-ABP-SU.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Proposal to use electromagnetic correction coils for RT trajectory correction.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC cost drivers Philippe Lebrun on behalf of the C&S WG CLIC Technical Committee 3 November 2009.
The CLIC alignment studies 1 CLIC workshop October 2007 THE CLIC ALIGNMENT STUDIES Hélène MAINAUD DURAND.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
CLIC09 Workshop October 2009Drive beam BPM’sLars Søby 1 Drive Beam BPM’s CLIC 09 work shop, CERN, of October 2009, Lars Søby.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
CLIC two-beam modules TEST modules final schemes Dmitry Gudkov BE/RF CLIC Module Working Group.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
cern.ch International Workshop on Linear Colliders 2010 CLIC TWO-BEAM MODULE DESIGN & INTEGRATION 21-Oct-2010 WG 8 «TECHNICAL SYSTEMS»
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
CLIC module Experimental program for module array Module review, June 22 nd 2015Elena Daskalaki, BE-RF-MK.
TBTS Test Program & Schedule G. Riddone
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
CLIC meeting CLIC module status G. Riddone on behalf of the CLIC Module WG,
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
FP7: EuCARD after a year of preparation… A.Jeremie.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
H. MAINAUD DURAND Studies on active pre-alignment for the CLIC project.
CTC Work Packages ver 2.1 HS for CTC. CTC-001SC wigglers Cooling design, hor. or ver. Racetrack coil Nb3Sn or NbTi cable Prototypes construction Experimental.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
Two-beam module layout
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
LCWS11 WG4 Fully featured accelerating structure engineering design
CLIC Parameter Working Group Two Beam Module Design
CLIC module working group
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Module roadmap to end of 2017
CLEX* Status and Plans CTF3 complex CLEX
Thermal review of CLIC module
The path to a new CLIC main-linac module
TBL, Status, Plans, Experiments
Have a chance to operate your own beam at CERN
List of changes and improvements for the next generation CLIC module
Installation plan for LAB modules
LCWS 2017 – 26th October C. Rossi
Advanced Research Electron Accelerator Laboratory
Thermal test (lab modules)
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

CTC, Outcome from Two-beam Module Review on15/ G. Riddone,

Content  Aim and program of the module review  Module design  baseline as validated in the module review on 15/  alternatives under study  Test program  CLIC modules  CLEX modules G. Riddone, CTC meeting,

AIM AND PRGRAM OF THE REVIEW G. Riddone, CTC meeting,

Aim of the review The aim of the CLIC Two-Beam Module review is the following:  Present the module baseline for the CDR and few selected alternatives  Review the baseline design for the module  technical design of the different systems,  their integration,  strategy for transport and installation  Consider alternative design for selected technical systems  Update baseline and alternatives, if necessary  Review R&D and engineering efforts for the completion of the CDR  Update workplan, milestones, cost estimate, manpower requirements G. Riddone, CTC meeting,

Program  Introduction  Main requirements (beam physics and RF)  Technical systems (focus on baseline and show alternatives)  Integration (module and impact on tunnel)  Validation (mock-ups and test modules)  Cost issues  Conclusions and future actions G. Riddone, CTC meeting, Meeting over two days  September 2009 Report of results at the CLIC workshop and CTC Meeting over two days  September 2009 Report of results at the CLIC workshop and CTC

Program on 15 September 2009 TimeTitleSpeakers 08:45-09:00Welcome and presentation of the agendaG. Riddone 09:00-09:20Introduction. Charge for CDRH. Schmickler 09:30-09:50Introduction. Introduction to module layout and typesG. Riddone 10:30-10:50Main requirements. Beam dynamics requirementsD. Schulte 11:00-11:20Main requirements. RF system reqiorementsW. Wuensch 11:30-11:50Technical systems. Pre-alignment systemsH. Mainaud Durand 12:00-12:20Technical systems. Stabilisation systemK. Artoos 14:00-14:20Technical systems. Supporting system for structureR. Nousiainen 14:30-14:50Technical systems. Cooling systemR. Nousiainen 15:00-15:20Technical systems. Vacuum system and interconnections C. Garion 16:00-16:20Technical systems. Instrumentation and diagnostics. Beam instrumentation L. Soby 16:30-16:50Technical systems. Instrumentation and diagnostics. RF instrumentation A. Andersson 17:00-17:20Technical systems. Radiation issuesS. Mallows G. Riddone, CTC meeting,

Program on 16 September 2009 G. Riddone, CTC meeting, TimeTitleSpeakers 08:45-09:00Presentation of the agendaG. Riddone 09:00-09:20Technical systems. Magnet systemM. Modena 09:30-09:50Technical systems. Actuators for main beam feedbackH. Schmickler 10:30-10:50Integration, validation and cost. System integration in the module A. Samoshkin 11:00-11:20Integration, validation and cost. Impact on tunnel integration. Introduction to the tunnel cross-section J. Osborne 11:30-11:50Integration, validation and cost. Impact on tunnel integration. Cooling and ventilation systems M. Nonis 12:00-12:20Integration, validation and cost. Impact on tunnel integration. Transport studies K. Kershaw 14:00-15:00Integration, validation and cost. Test modules: hardware, program, resources, schedule G. Riddone 16:00-16:20Integration, validation and cost. Cost issuesPh. Lebrun 16:30-16:50Conclusions and future actions. ConclusionsAll 17:00-17:20Conclusions and future actions. Future actionsAll

MODULE DESIGN: BASELINE AND ALTERNATIVES G. Riddone, CTC meeting,

9 Module layout

RF structures G. Riddone, CTC meeting,  Accelerating structure: CLIC G, disks, waveguide damping sealed (100 mV/m, L = 230 mm, aperture ~ 5 mm)  PETS, octants. mini-tank (6.5 MV/m, L=310 mm, aperture 23 mm)  1 PETS powering 2 accelerating structures 1 wake-field monitor per ac. structure Water cooling Vacuum manifold around each waveguide PETS on-off Water cooling for couplers only Mini-tank for octants

Beam height and interaxis G. Riddone, CTC meeting, Beam interaxis: 650 mm  same height for the two beams (to be reconsidered after CDR) Beam height: 620 mm (agreement also from stabilisation WG) 650 mm

Pre-alignment system/ girders G. Riddone, CTC meeting,  Accelerating structures and PETS + DB Q on girders  Girder end supports  cradles mechanically attached to a girder and linked by rods to the adjacent one: snake-system with articulation points adopted (DB: 100 A, MB: minimization of wakefields, validation at 30 GHz in CTF2)  Separate girders for main and drive beam  possibility to align DB quadrupole separate from accelerating structures mono-girder Alternative under study: mono-girder + + better stability, simplification for transport and installation - - non-independent alignment MB and DB (is separate align. needed?) - - additional weight for movers (cam system, are we ready?)

Support for MBQ - BPM G. Riddone, CTC meeting,  Separate support for MB Q and its BPM  snake system interrupted at each MB quadrupole  MB Q and BPM rigidly mechanically connected No full continuity between MB girders (increasing of align. cost) MB girder length changes as function of module type No girder underneath MB Q Beam height lowered MBQ support simplified MB Q beam pipe and AS beam pipe are coupled via bellows

Module sections Close to IP  better alignment IP G. Riddone, CTC meeting, With MB quad

Beam-Based Feedback G. Riddone, CTC meeting,  Common actuators/devices for stabilization and beam-based feedback systems  extend dynamic range of stabilization actuators by 100 ! and make BBF corrections by displacing the MB quads. Fullscale = ± 5 um compared to ± 50 nm (several drawbacks)  original configuration  additional windings onto quad jokes in order to produce “a sort of dipole correction field”  MB quad: solid yoke, not possible to insert correct coils (bandwidth problems)  New proposed configuration: use electromagnetic correction coils for RT trajectory correction: 1 cm long T magnet at each MB quad (feasibility under evaluation)

Interconnections G. Riddone, CTC meeting,  MB: gap is accepted (damping is needed for the long range wake)  DB: electrical continuity is required (100 A)  MB-DB: choke mode flanges (flexibility needed during thermal transient and alignment) DBMB

Others G. Riddone, CTC meeting,  Vacuum design based on mbar requirement  Cooling  Water cooling for RF structures and quadrupoles  Air cooling for quadrupole cables (powering strategy)  Instrumentation  BPM: 1 per Q  WFM: 1 per ac. Structure  Breakdown monitors (1 per PETS unit?) – how is it done?  Problem of radiation hardness

G. Riddone, CTC meeting,

TEST PROGRAM G. Riddone, CTC meeting,

Motivation for Test Modules G. Riddone, CTC meeting, One of the feasibility issues is the two beam accelerating (two beam module is part of the program)  Address feasibility issues in an integrated approach  e.g. RF structures, stabilization-alignment-supporting systems  Establish coherence between existing test set-up up to future test modules in CLEX  Validate technical systems (tests in the labs) - if possible use components from stand-alone tests for test modules in CLEX  Validate two-beam acceleration scheme (tests in CLEX with beam)

Test modules G. Riddone, CTC meeting, CLIC modules (as much as possible close to CLIC modules) CLEX test modules (Eucard – NCLinac – WP9.2/9.3) (to be adapted to test infrastructures) CLEX test modules (Eucard – NCLinac – WP9.2/9.3) (to be adapted to test infrastructures) We have to establish a test program with clear milestones before and after CDR TEST MODULES one project with two parallel lines TEST MODULES one project with two parallel lines

Strategy for main linac two-beam module validation G. Riddone, CTC meeting,

Objectives of the CLIC modules G. Riddone, CTC meeting,  Integration of all technical systems (dummy RF structures and quadrupoles can be used – real dead weight and interfaces to other systems)  Full metrology  Pre-alignment of MB and DB, including fiducialisation  Interconnections validation under different simulated thermal loads  Stabilisation of main beam quad in the module environment  Vibration study of all systems and identification of vibration sources  Measurement of resonant frequencies  Heating in several thermal cycles. Measurements of thermal transient e.g. how long it takes to achieve a new equilibrium state.  Transport of the module and verification of alignment

CLIC modules (LAB) G. Riddone, CTC meeting, Phase 1 Phase 2 Phase 3 Pre-alignment validation with dummy elements Interconnections - pumping (static conditions) Repositioning Measurements of resonant frequencies Pre-alignment validation with dummy elements Interconnections - pumping (static conditions) Repositioning Measurements of resonant frequencies Transport and thermal cycles Measurements of resonant frequencies Transport and thermal cycles Measurements of resonant frequencies Stabilization (Q) and pre-alignment compatibility Vibration study of all system and vibration sources Stabilization (Q) and pre-alignment compatibility Vibration study of all system and vibration sources The test module types are representative of all module types

014 CLIC modules G. Riddone, CTC meeting, Type 0 Type 1 Type 4 A. Samoshkin

Objectives of the test modules G. Riddone, CTC meeting,  Two-beam acceleration in a realistic environment  Cost- and performance optimized structures and their integration in CLIC modules.  Accelerating structure (ACS) alignment on girder using probe beam  Wakefield monitor (WFM) performance in low and high power conditions (and after a breakdown)  Investigation of the breakdown effect on the beam  Alignment and stabilization systems in a dynamic accelerator environment  RF network phase stability especially independent alignment of linacs  Vacuum system performance especially dynamics with rf  Cooling system especially dynamics due to beam loss and power flow changes  Integration of all different sub-systems:, i.e. to simultaneously satisfy requirements of highest possible gradient, power handling, tight mechanical tolerances and heavy HOM damping  Validation of assembly, transport, activation, maintenance etc.

G. Riddone, CTC meeting, Choke mode flange AS (CLIC-G) PETS (mini tank) Compact coupler with internal splitter ON/OFF unit 130 MW Coupler with internal splitter “Hammer” 3 dB splitter RF load~ 65 MW (tbc) RF diagnostic PETS (mini tank) AS DB Quad CLIC module type 0 From CLIC module to CLEX module

PETS G. Riddone, CTC meeting, AS (CLIC-G) Compact coupler with internal splitter Coupler with internal splitter “Hammer” 3 dB splitter RF load RF diagnostic PETS (mini tank) AS DB Quad CLEX module type 0 From CLIC module to CLEX module

CLEX modules G. Riddone, CTC meeting, accelerating structures 5 PETS 14 accelerating structures 5 PETS mm Phase 3: Modules 0 and 4 Phase 4: Module : double length PETS - 4.2: two CLIC PETS replacing 1 double length PETS Phase 3: Modules 0 and 4 Phase 4: Module : double length PETS - 4.2: two CLIC PETS replacing 1 double length PETS FINAL CONFIGURATION Accuracy of 5 um is an issue: few WFM in a single structure

CLEX modules - configurations G. Riddone, CTC meeting, No modifications on the test module type 0 HW No Recirculation Current increase from 12 A to 19.2 A Pulse length reduced from 240 ns to 140 ns No modifications on the test module type 0 HW Addition of a module type 1 Increase of current from 19.2 A to 22 A Phase 3, Conf. 3.1 Phase 3, Conf. 3.3 Phase 4, Conf. 4.1 Phase 4, Conf. 4.2 Nominal power and pulse length for 1 PETS and 2 AS Recirculation 12 A and 240 ns Modification on the test module type 1 HW (2 CLIC PETS) Needed klystrons and PC

G. Riddone, CTC meeting, A. Solodko T0 T4 T1 Beam Double-length PETS 31

CONCLUSIONS G. Riddone, CTC meeting,  Baseline defined for CDR  Two alternative configurations to be studied: monogorder and additional 1-cm long magnet in front of each quad  decision by end of October 2010  In parallel study of other alternatives (e.g. cam system)  Design has to be frozen by 1Q 2010 – a lot of work and limited resources: needed close collaboration with all technical experts  ADDITIONAL MANPOWER NEEDED, proposal for a meeting next week with JPD and HS  agreement is urgent  Test module project with two parallel lines:  in the lab (from 2010)  in CLEX (from 2011) [also part of EuCARD – WP9.2 (G. Riddone /WP9.3 (A. Jeremie))  ADDITIONAL MANPOWER NEEDED, meeting next week with JPD and HS