October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.

Slides:



Advertisements
Similar presentations
Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Advertisements

Commissioning the PHENIX RPC Forward Trigger Upgrade Michael Daugherity Abilene Christian University for the PHENIX Collaboration.
1 Run 9 PHENIX Goals and Performance John Haggerty Brookhaven National Laboratory June 4, 2009.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
The sPHENIX Barrel Upgrade: Jet Physics and Beyond John Haggerty Brookhaven National Laboratory on behalf of the PHENIX collaboration Quark Matter 2012.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
Intro: Spin Report Update Hi Gerry (from S. Vigdor, 10/17/07), I would like to ask you to organize efforts, with the help of the others copied on this.
PHENIX Fig1. Phase diagram Subtracted background Subtracted background Red point : foreground Blue point : background Low-mass vector mesons (ω,ρ,φ) ~
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
Status of W analysis in PHENIX Central Arm Kensuke Okada (RBRC) For the PHENIX collaboration RHIC Spin Collaboration meeting November 21, /21/20091K.Okada.
The Progress of PHENIX RPC Production in China Shouyang HU Xiaomei LI Shouyang HU Xiaomei LI Science and Technology on Nuclear Data Laboratory China Institute.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
Observation of W decay in 500GeV p+p collisions at RHIC Kensuke Okada for the PHENIX collaboration Lake Louise Winter Institute February 20, /20/20101.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 5 April 2011 Time Meeting, BNL.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
STAR Agreement on Spin Configuration Plan Bill Christie RHIC Coordination Meeting January 24, 2006 Plan: A.) If the FPD++ installation, debugging, and.
The W program at PHENIX R. Seidl (University of Illinois and RBRC) for the PHENIX Collaboration Workshop on Parity Violating Spin Asymmetries BNL, April.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
9/25/08J. Lajoie - Muon Trigger Upgrade Review1 Muon Trigger Upgrade LL1 Electronics Iowa State University John Lajoie Cesar Luiz daSilva Todd Kempel Andy.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Introduction to High Momentum Trigger in PHENIX Muon Arms RIKEN/RBRC Itaru Nakagawa 中川格 1.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
J/  production in p+p collisions at PHENIX and gluon distribution QWG meeting at FNAL September Hiroki Sato (Kyoto University) for the PHENIX collaboration.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Oct 6, 2008Amaresh Datta (UMass) 1 Double-Longitudinal Spin Asymmetry in Non-identified Charged Hadron Production at pp Collision at √s = 62.4 GeV at Amaresh.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
2004 Fall JPS meeting (English version) K.Okada1 Measurement of prompt photon in sqrt(s)=200GeV pp collisions Kensuke Okada (RIKEN-BNL research center)
Status of TPC/HBD for PHENIX Craig Woody BNL DC Upgrades Meeting February 12, 2002.
PHENIX Measurement of Parity-Violating Single Spin Asymmetry in W Production in p+p Collisions at 500 GeV Stephen Pate (for the PHENIX Collaboration) New.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
2007 Run Update for STAR Jeff Landgraf For the STAR collaboration.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
STAR pp Run Summary Carl Gagliardi March 11, 2008.
1/27/2016 R.Seidl: status of simulation1 W muon analysis in PHENIX Status of the background understanding, signal, smearing and asymmetries R.Seidl (RBRC)
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
10/27/2005J. Lajoie - PANIC '051 The PHENIX Forward Upgrade Topics: A (Brief) Spin Physics Motivation Antiquark Spin Contribution with W +/- bosons The.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
PHENIX FUTURE PLANS & UPGRADES Stefan Bathe for PHENIX, Users’ Meeting 2009.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
Muon Arm Physics Program Past, Present + Future Patrick L. McGaughey Los Alamos National Laboratory Santa Fe June 17, 2003.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 19 April 2011 Time Meeting, BNL.
RPC production and performance Chong Kim Korea university RHIC spin workshop, Seoul National Univ.
08-Sep-00PHENIX Upgrades PHENIX has a phased strategy to q Complete the current detector q Enhance its capabilities q Extend its physics reach.
Muon Trigger Performance Run12 PP510GeV Sanghwa Park (SNU/RIKEN)
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run16 Y. Akiba.
Kazuya Aoki For the PHENIX Collaborations. Kyoto Univ. / RIKEN
Presentation transcript:

October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory

October 3, 2008 John Haggerty 2 PAC Recommendations, May 8-9, 2008 The PAC was asked to prioritize the physics goals listed in the Beam Use Proposals submitted by the STAR and PHENIX collaborations, on both short and intermediate time scales. In view of uncertain short-term budget prospects, the PAC decided to consider Runs 9 and 10 together (notated below as Run 9- 10). We recommend the following “must do” measurements in the order of their priority: 1. Longitudinally polarized proton-proton collisions at √s = 200 GeV with 60% average polarization for weeks, sufficient to record an integrated luminosity of about 25 pb -1 in PHENIX and about 50 pb -1 in STAR. 2. High luminosity Au+Au collisions at √s = 200 GeV for 8-10 weeks, corresponding to an integrated luminosity of nb -1 in PHENIX, to exploit the capabilities of its Hadron Blind Detector (HBD). This will allow both a high precision measurement of the low mass di-lepton spectrum in PHENIX and STAR, and development of transverse stochastic cooling of the Au beams. In addition, it will enable STAR to exploit its new DAQ capability in a high statistics run. 3. Longitudinally polarized proton-proton collisions at √s = 500 GeV for 5 weeks to allow beam development and commissioning by C-AD, a first measurement of W boson production in PHENIX, and background studies in STAR.

October 3, 2008 John Haggerty 3 Expected run plan According to Steve Vigdor in RHIC News (9/23/2008): Cryo startup Feb GeV Beam in one ring ~1 week later Collisions for development ~Feb 15 Polarization, luminosity, and backgrounds adequate for physics ~Mar 1 If ( budget ~ FY09 request ) { –Switch to 200 GeV longitudinal ~ Apr 15 } else { –End run ~ Apr 15 }

October 3, 2008 John Haggerty 4 Upgrade Detectors in Run 9 Upgrade detectors in Run 9 are partial installations or engineering runs: –HBD –Muon Trigger (MUTR FEE upgrade) –Muon RPC prototype First goal of upgrade detectors: do no harm

October 3, 2008 John Haggerty 5 HBD HBD has had major surgery at SBU East is now complete in glove box here at SBU West –A problem with the gas system on August 22 resulted in ~100’s ppm O 2 and off-scale H 2 O –Replace GEM’s new CsI –Schedule tight but should be ready for installation when we need it in early November Will need to gain operational experience with DAQ, HV, monitoring, calibration, analysis

October 3, 2008 John Haggerty 6 Muon Trigger Upgrade (KEK, RIKEN, Kyoto, Rikkyo) Major installation effort under way… complete North arm in this shutdown

October 3, 2008 John Haggerty 7 RPC Prototype Resistive Plate Chambers –Fast response –Good spatial resolution –Low cost, CMS experience Installing prototype sector and electronics Engineering run

October 3, 2008 John Haggerty 8 Trigger Board Block Diagram (John Lajoie, ISU) VME Interface P1 P0 P2 P3 12 x xcvr Virtex-5 LX110T 2.8Gbit) (MuTr 2.8Gbit) (MuTr 2.8Gbit) (MuTr 2.8Gbit) One board processes four trigger octants (one octant per tile). Virtex-5 LX110T (9 fibers per octant) Virtex-5 LX110T Virtex-5 LX110T Virtex-5 LX110T 12 x xcvr 12 x xcvr 12 x xcvr

October 3, 2008 John Haggerty 9 Many other detector repairs/improvements Run 6 ERT turnon 8 kHz DAQ improvements to increase livetime, event rate EMCAL/RICH trigger efficiency improvements DC and PC repairs MUTR high voltage stability Could be some additional small tests/prototypes for upgrades

October 3, 2008 John Haggerty 10 Final days schedule Need to complete MuTrig installation, remove scaffolding; install HBD, RPC prototype Expecting closing up the shield wall beginning of January, 2009 then safety and detector checkout

October 3, 2008 John Haggerty 11 WW Central arms W +  e + ~21 pb W -  e - ~3 pb (Kensuke Okada) Muon arms W +  + ~10 pb (Ralph Seidl)

October 3, 2008 John Haggerty 12 Issues for 500 GeV Running Magnetic field configuration –HBD needs “field free” bucked central field (“+-”) to be HB –But momentum resolution in central arms is compromised by +- field (needs more quantitative study, but  1.7 mr compared to 2.4 mr for ++ (   ~ 0.5 mr) at 40 GeV Gain changes in EMCAL (present dynamic range set to 20 GeV) ?

October 3, 2008 John Haggerty 13 Operational Efficiency Review of operational efficiency at S&T Review July 7-9, 2008 Short summary (from Run 8 d+Au): –50% in vertex cuts (no change expected) –77% uptime (modest improvements possible, but less with development) –89% livetime (slight improvement possible with higher rates)  34% of delivered beam to physics… probably not much different in Run 9

October 3, 2008 John Haggerty 14 Conclusion Thanks to Steve Pate who has agreed to serve as my Spin Coordinator Looks like 500 GeV longitudinal polarized pp (but equally or better prepared for 200 GeV) Run planning document (TN-427) Fair number of upgrade detectors and prototypes, none of them central to physics this year Modest improvements can be expected in trigger, data acquisition, and detectors