R. Bruce, 2014.06.13 Today’s meeting ATS optics proposed for use in 2015 (see LBOC, Evian) Several differences compared to nominal optics – Checks needed!

Slides:



Advertisements
Similar presentations
R. Bruce, M. Giovannozzi, S. Redaelli With essential input from G. Arduini, R. De Maria, S. Fartoukh, M. Fitterer, R. Tomas, J. Wenninger, aperture team.
Advertisements

Collimation with retracted TCSGs R. Bruce, R. Kwee, S. Redaelli.
Simulation priorities for 2015 R. Bruce for task 5.2.
LHC Collimation Working Group – 19 December 2011 Modeling and Simulation of Beam Losses during Collimator Alignment (Preliminary Work) G. Valentino With.
Critical beam losses during Commissioning & Initial Operation Guillaume Robert-Demolaize (CERN and Univ. Joseph Fourier, Grenoble) with R. Assmann, S.
1 Analysis of MD on IR1 and IR5 aperture at 3.5 TeV – progress report C. Alabau Pons, R. Assmann, R. Bruce, M. Giovannozzi, G. Müller, S. Redaelli F. Schmidt,
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
* IP5 IP1 IP2 IP8 vertical crossing angle at IP8 R. Bruce, W. Herr, B. Holzer Acknowledgement: S. Fartoukh, M. Giovannozzi, S. Redaelli, J. Wenninger.
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
External Review on LHC Machine Protection, CERN, Collimation of encountered losses D. Wollmann, R.W. Assmann, F. Burkart, R. Bruce, M. Cauchi,
New Progress of the Nonlinear Collimation System for A. Faus-Golfe J. Resta López D. Schulte F. Zimmermann.
LER Workshop, CERN, October 11-12, 2006Detector Safety with LER - Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Accelerator & Detector.
LHC Studies Working Group – 03 July 2012 Beam Scraping and Diffusion + Asynchronous Dump MD G. Valentino, R. W. Assmann, F. Burkart, L. Lari, S. Redaelli,
Beam Background Simulations for HL-LHC at IR1 Regina Kwee-Hinzmann, R.Bruce, A.Lechner, N.V.Shetty, L.S.Esposito, F.Cerutti, G.Bregliozzi, R.Kersevan,
Optimization of Field Error Tolerances for Triplet Quadrupoles of the HL-LHC Lattice V3.01 Option 4444 Yuri Nosochkov Y. Cai, M-H. Wang (SLAC) S. Fartoukh,
Evian 2014 historical perspective run 1: 2010: L peak >10 32 cm -2 s -1  2x10 32 cm -2 s : produce >1 fb -1  delivered.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
Updates on FLUKA simulations of TCDQ halo loads at IR6 FLUKA team & B. Goddard LHC Collimation Working Group March 5 th, 2007.
Simulations of TCT beam impacts for different scenarios R. Bruce, E. Quaranta, S. RedaelliAcknowledgement: L. Lari, C. Bracco, B. Goddard.
Update on injection studies of LHC beams from Linac4 V. Forte (BE/ABP-HSC) Acknowledgements: J. Abelleira, C. Bracco, E. Benedetto, S. Hancock, M. Kowalska.
Aperture in case of an asynchronous beam dump with ATS optics R. Bruce, E. Quaranta, S. Redaelli With valueable input from: A. Bertarelli, C. Bracco, F.
Work in progress: Improved models of collimation margins with TCT damage limit R. Bruce, L. Lari 1 Input and discussions: R. Assmann, A. Bertarelli, C.
LHC off-momentum collimation simulation Hector Garcia Morales Royal Holloway University of London Roderik Bruce, Danielle Mirarchi, Belen Salvachua, Kyrre.
FCC-hh: First simulations of electron cloud build-up L. Mether, G. Iadarola, G. Rumolo FCC Design meeting.
Collimator settings for 2012 R. Bruce, R. Assmann for the collimation team
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Β*-dependence on collimation R. Bruce, R.W. Assmann C. Alabau Pons, F. Burkart, M. Cauchi, D. Deboy, M. Giovannozzi, W. Herr, L. Lari, G. Muller, S. Redaelli,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
NM4SixTrack Implementation of new composite materials for HL-LHC collimator upgrades in SixTrack “Tracking for SixTrack” workshop – CERN, R.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Summary Session 5 Chamonix 2011, 24. – Session 5: “High Intensity: Present and Future” R. Assmann & S. Redaelli Thanks to Frank Z. for his notes…
Collimation design considerations at CERN (with some applications to LHC) R. Bruce on behalf of the CERN LHC collimation project R. Bruce,
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
HL-LHC WP14 2 nd meeting: Intercepting devices and failure cases to be studied Anton Lechner, Jan Uythoven.
Results of TCL scans D. Mirarchi, M. Deile, S. Redaelli, B. Salvachua, Collimation Working Group, 22 nd February 2016.
Field Quality Specifications for Triplet Quadrupoles of the LHC Lattice v.3.01 Option 4444 and Collimation Study Yunhai Cai Y. Jiao, Y. Nosochkov, M-H.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC Collimation Working Group Monday, 21 March 2016 Analysis of collimator BPMs in the 2015 run A.Valloni, G. Valentino with input from R. Bruce, A. Mereghetti,
How low can we go? Getting below β*=3.5m R. Bruce, R.W. Assmann Acknowledgment: T. Baer, W. Bartmann, C. Bracco, S. Fartoukh, M. Giovannozzi, B. Goddard,W.
R. Bruce, M. Giovannozzi, S. Redaelli With essential input from G. Arduini, R. De Maria, S. Fartoukh, M. Fitterer, R. Tomas, J. Wenninger, aperture team.
Tracking simulations – where we are and what needs to be done R. Bruce on behalf of task 5.2.
On behalf of the CERN Collimation Team and FLUKA team…
C. Bracco, R. Bruce, B. Goddard, C. Wiesner, A. Lechner, M. Frankl
Operating IP8 at high luminosity in the HL-LHC era
MD Planning Fri – Sat (26. – 27.8.)
Surviving an Asynchronous Beam Dump?
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Introduction: FCC beam dumping system
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
Optimization of Triplet Field Quality in Collision
FCC hh dump kicker - switch topologies and impact on beam
Β*-reach in 2017 R. Bruce, S. Redaelli, R. De Maria, M. Giovannozzi, A. Mereghetti, D. Mirarchi Acknowledgement: collimation and optics teams, BE/ABP,
Field quality to achieve the required lifetime goals (single beam)
Beam collimation for SPPC
UPDATE ON DYNAMIC APERTURE SIMULATIONS
Machine availability reaching well over 80%
Collimation after LS1: cleaning and β* reach
Saturday 7th May Sat – Sun night
Collimation margins and *
Discussion of High Energy Proton Losses in Arc 7
MD Planning Fri – Sat (1. – 2.7.)
Another Immortal Fill….
Powering scheme for Hollow Electron Lens
Presentation transcript:

R. Bruce, Today’s meeting ATS optics proposed for use in 2015 (see LBOC, Evian) Several differences compared to nominal optics – Checks needed! From collimation side – Check protection in case of fast failures (this talk) – Check cleaning (next talk by Daniele)

Work in progess: TCT impacts during fast failures in 2015 ATS optics R. Bruce, S. Redaelli Acknowledgement: C. Bracco, S. Fartoukh, B. Goddard, L. Lari R. Bruce,

Outline Introduction – Calculation of collimation hierarchy margins – Fast beam failures Simulations of beam dump failures in ATS 2015 and nominal optics – Comparison with TCT damage limit – Variations in energy spread, emittance, tail population, phase advance Summary

R. Bruce, Collimation hierarchy Limit on β* – IR6 dump protection must protect TCTs – TCTs must protect triplet aperture Must ensure sufficient margins so that we are protected also in case of orbit or optics drifts TCP TCS7 Protected aperture TCS6/ TCDQ TCT TCLA7 Secondary halo Primary halo Tertiary halo Kicked beam

R. Bruce, What are we afraid of? Accident scenario: beam dump failure – LHC filling scheme has “hole” – abort gap – to allow rise of the 15 dump kickers (MKD) from zero to full field - standard dump. Errors possible: Asynchronous dump: all dump kickers firing simultaneously at the wrong moment Single-module pre-fire: one module fires, followed by re- trigger of others – These failures could give Abort gap intermediate kicks to some bunches and send beam directly onto sensitive equipment (TCTs / aperture)

R. Bruce, Received kicks Waveform of kick in urad from one MKD provided by B. Goddard Asynchronous dump: total kick is sum of 15 kickers Single module pre-fire: Re-triggering time ( N) ns, N integer distance from pre-firing kicker Below certain kick amplitude, nothing is hit Above certain kick amplitude, everything intercepted by TCDQ Single module pre-fire more dangerous: stay longer time at small kicks => more bunches potentially affected Dangerous “window” zoom

R. Bruce, Calculation of hierarchy margins Margins calculated using square sum of errors except van der Meer scans (see Evian 2011 and Chamonix 2012). Components of critical margins: orbit, optics errors, lumi scans, positioning errors and setup errors Philosophy: Margins should be respected more than 99% of time => risk of damage < 1 in ~300 years for TCTs, less than years for triplet (see Evian ). Underlying assumption: 1 asynchronous dump per year expected

What Can Happen? Error case: 1.We need an asynchronous dump ore one module pre-trigger while we are at low beta* (probability per second). 2.We need to be out of orbit tolerance from IR6 to a TCT in one IR (probability ). 3.We need to be at maximum beta beat error from IR6 to a TCT in one IR (probability ). 4.Both errors must point in the same bad direction (probability 0.25).  Then one TCT is at risk for damage (benign damage). Still very unlikely, due to phase advance conditions that must be met. 5.The TCT is out of tolerance with respect to triplet aperture (probability ). 6.We are fully squeezed, still separated (aperture assumption). 7.Beams have additional beam-beam offset reserved for van-der Meer scan (possible?).  Then the triplet aperture can be hit by fraction of a bunch, if conditions for TCT hit (see above) are met LMC 2012 More likely 2015

R. Bruce, Underlying assumptions

R. Bruce, Phase advances Fractional phase advances from MKD to TCTs in different optics: Preferable: phase advance is >40 deg away from 90 or 270 deg B2 IR5 most critical, since no cleaning insertion in between (deg)7TeV nominal, 55 cmATS 2015, 55cm Beam1 TCTH.4L1.B TCTH.4L2.B TCTH.4L5.B14740 TCTH.4L8.B Beam2 TCTH.4R1.B TCTH.4R2.B TCTH.4R5.B TCTH.4R8.B219170

R. Bruce, Simulations of ATS optics With ATS: No more additional margin from phase advance New SixTrack version available (L. Lari et al, IPAC2013,IPAC2014) – SixTrack simulates dump failures with full collimation system in place, including scattering, and realistic bunch distribution – Independent check of TCT impacts possible Could conclude on suitable margins based on damage onset

R. Bruce, Simulation setup – 6.5 TeV post-LS1 – Single module pre-fire, MKD.A5R6 fires (most downstream kicker) – Collimator settings: 2 σ retraction (more pessimistic than mm kept) – Optics: Nominal 55cm and ATS cm, B1 and B2 – Separate simulation for each bunch with 25 ns spacing, different kicks. Post-processing: sum all bunches – Keeping perfect machine, but simulating scan over TCT settings to see what retractions are acceptable – Gaussian beam with 3.5 um emittance, energy spread 1.1e-4

R. Bruce, Example result ATS 2015 Losses around ring B2 with perfect machine, normalizing to 1.5e11 p/bunch Summed over bunches that give any contribution at TCTs. Other bunches (going only on TCDQ or in dump line) not included TCT retraction important… 10.3 σ 6.9 σ Beam

R. Bruce, Losses vs bunch As expected, only about 13 bunches (kick angles) out of 142 induce TCT losses. Simulating only these bunches to save CPU time 10.3 σ 6.9 σ

R. Bruce, Losses at TCTs vs retraction Summing all bunches, TCTs in IR1/5, both beams, ATS + nominal optics Compare with damage limits (A. Bertarelli, MPP workshop 2013) – Plastic deformation: 5e9, Fragment ejection 2e10, 5 th axis unusable 1e11. Under study by MME

R. Bruce, Remarks on results Constant “background” on IR5 TCT also at larger openings Losses with ATS start rising when passing the TCDQ level, and rise more rapidly after passing TCSG level – Consistent with direct shadowing assumption and phase close to 90 deg – See effect of out-scattering from TCSG Significantly higher losses on TCTs with ATS optics than nominal – E.g. with TCT at the level of IR6 collimators, factor more losses Reaching plastic deformation at 7.5σ for worst TCT in nominal optics and at 8.5σ with ATS. Fragment ejection reached at 8.0σ and 7.0 σ respectively => 1 σ difference Next step: how likely is each TCT setting, including errors?

R. Bruce, Errors As when calculating margins: look at drifts from orbit and b-beat Expect about 2 σ total error for a 99% confidence level => TCT could go as far in as 8.7 σ with these settings (about TCDQ level) With ATS optics, still just below plastic deformation, no ejection Orbit in μm Survival function of orbit in σ

R. Bruce, Variations in simulation The simulation result could be sensitive to several parameters – investigating through simulations of worst case (ATS B2) – Decreased transverse emittance 3.5 um -> 1.7 um – Increased energy spread 1e-4 -> 3e-4 – Error on TCSG-TCDQ retraction (increasing 0.5 σ -> 1.5 σ) – Non-Gaussian tails from measured profile (see S. Redaelli, IPAC 13 or F. Burkart’s master thesis)

R. Bruce, Variations in simulation Assuming that β-beat and orbit error is absorbed into margin (can calculate a maximum TCT error as for hierarchy margins) Remaining optics error on phase need to be checked Sampling 1000 random machines with MQ errors to mimic realistic residual β-beat Resulting in up to 10 degrees phase difference MKD->TCT5 Simulating optics with best (smallest) and worst (largest) phase advance β-beat Compare 2012: RMS 0.02 Peak 0.07±0.04 Phase MKD->TCT5

R. Bruce, Simulated variations ATS 2015 optics, B2 with above variations

R. Bruce, Simulated variations With linear scale…

R. Bruce, Observations Significant impact of phase advance in both directions – ~0.5 σ difference between worst and best optics – Possibilities to decrease phase advance MKD->TCT5? Over-populated tails -> worse, smaller emittance -> better Energy spread : not important TCDQ retraction: important for the a priori “safe” case, within margin – Watch out with TCDQ tilt error – could have similar effect!

R. Bruce, Summary and outlook (1) ATS optics more challenging in terms of load on TCTs – About 1 σ difference in where damage limit is crossed – Would mean about 4-9 cm in β* in the range between 40cm and 80cm – Similar issues for HL-LHC, but then we might have more robust TCTs With 99% margin, simulations suggest we are still safe, but very close to limit of plastic deformation. – Only fraction of σ margin to fragment ejection – Consistent with previous simple model of shadowing – Very sensitive to phase advance. Can we change it? – Uncertainties from emittance, tails etc – Error margin on simulation result and on damage levels???

R. Bruce, Summary and outlook (2) Remember: 5th axis might not be usable (effort ongoing) Extremely important to verify early on in 2015 assumptions on orbit and β-beat. Underestimation of errors could be critical. What if we have more than 1 asynchronous dump per year? – If we have 10 dumps, probability serious event goes from 1 in 300 years to 1 in 30 years – Increase confidence interval from 99% to 99.9% and increase margin by ~0.3 σ ? But how do we extrapolate the tail of the distribution to 2015? Should probably calculate margins TCDQ->TCT, not TCSG->TCT Extra margins needed? To be discussed…

R. Bruce, Summary and outlook (3) Possible future studies: – Update SixTrack with latest additions to scattering routine and repeat – Scan over imperfect machines including both orbit and optics errors could provide additional cross-check. – More systematic check of bunch timing wrt dump kicker – Combined failures: What if magnets or RF etc fail and significantly perturb the machine before dump failure? – Similar scans of triplet losses to assess margin TCT-triplet Note: Ongoing work! The results are very fresh and have not yet been scrutinized in detail – Some simulations finished yesterday – Don’t take them as final results yet…