T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

Status of CMS CSC upgrade in LS1 Present CSC Status ME 4/2 project ME 1/1 project 5/20/2015 Petr Levchenko NEC 2013, Varna 1.
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Stan Durkin.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Jay Hauser, Fermilab Director’s Review, Apr. 30, CSC Muon Trigger Jay Hauser Director’s Review Fermilab, Apr 30, 2002 Outline The CSC muon trigger.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
CSC Muon Trigger September 21, 2004 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Paul Padley.
TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
CMS Emu Meeting, Dec. 6, Electronics Long Term Operations What we learned from Electronics Commissioning G. Rakness U.C.L.A. Dec 6, 2008.
Status of the CSC Track-Finder Darin Acosta University of Florida.
DOE/NSF Review May 8-10, US CMS US CMS Detector Project Overview Dan Green US CMS Project Manager DOE/NSF Lehman Review, May 8-10, 2001.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
W. Smith, U. Wisconsin, US CMS Collaboration Meeting, May 10, 2002: TriDAS 1 US CMS TriDAS US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
CMS Muon System Guenakh Mitselmakher University of Florida
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
DAQMB Production Status S. Durkin The Ohio State University Florida EMU Meeting 2004.
1.2 EMU Electronics L.S. Durkin CMS Review CERN, September 2003.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
10 th LECC Workshop, September 2004, Hauser et al.1 Experience with Trigger Electronics for the CSC System of CMS J. Hauser*, E. Boyd, R. Cousins,
S. Durkin, Software Review, March 16, 2006 FED Library S. Durkin The Ohio State University CSC Online Software Review, March 16,2005.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
S. Durkin, CMS EMU Meeting U.C. Davis Feb. 25, DMB Production 8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board 550 Production Boards.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
SX5: YE+2Counting House iBoot NPS emu slice0 2 emu slice0 1 Emu dqm Peripheral Crate DMB TMB DMB TMB DMB TMB DMB TMB MPC CCB DMB TMB DMB TMB DMB TMB DMB.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
University of California Los Angeles
EMU Slice Test Run Plan a working document.
CMS EMU TRIGGER ELECTRONICS
University of California Los Angeles
University of California Los Angeles
Regional Cal. Trigger Milestone: Major Production Complete
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
Regional Cal. Trigger Milestone: Production & Testing Complete
New Calorimeter Trigger Receiver Card (U. Wisconsin)
TMB and RAT Status Report
Fred’s Input to Rice Workshop
FED Design and EMU-to-DAQ Test
Plans for the 2004 CSC Beam Test
CSC Status Report Status reports;
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics

T.Y. Ling, EMU Meeting, September EMU Electronics System Layout CSC CFEB ALCT 1 of 24 CFEB 1 of 2 LVDB LV Distribution Board 1 of 5 Anode Front-end Board Cathode Front-end Board Anode LCT Board MPCMPC DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB CCBCCB CONTROLLERCONTROLLER Peripheral Crate on iron disk Slow Control Trigger-Timing-Control Muon Sector Receiver Lev-1 Trigger Trig Motherboard DAQ Motherboard Clock Control Board Readout Data FED Crate in USC55 DDU,DCC Boards

T.Y. Ling, EMU Meeting, September Total Board Count Peripheral Crates FED Crates On-chamber Boards DONE

T.Y. Ling, EMU Meeting, September Boards in Peripheral Crate MPCMPC DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB CCBCCB CONTROLLERCONTROLLER Clock Control Board (CCB) 89 boards produced (need 60). 72 boards burned-in and tested. 70 boards equipped with TTCrq (v5) & tested with TTCvi/TTCvx. Trigger Motherboard (TMB) RPC ALCT Trans Brd (RAT) Prototype board sets produced. Testing with full backplane prototype in progress. 30 pre-prod sets by Aug 05. Muon Port Card (MPC) 75 boards produced. (need 60) 70 boards equipped FPGA mezzanine Burned-in and tested. DAQ Motherboard (DMB) 550 boards produced (need 468). 534 passed all tests, ready to ship. 16 have BGA problems, being fixed. Crate Controller 10 preproduction boards produced. Rad test completed. No problems Will produce 75 boards (need 60) by Oct 15, 2005.

T.Y. Ling, EMU Meeting, September Custom Backplane and CRB 9U VME boards Custom Backplane (enlarged to include J1 section with split power plane) CRB (design similar to front-end LVDB) Heat sink RPC ALCT Transition Boards Custom Backplane Final prototype board delivered. 6/10/05 Full crate test planned for July/Aug Production of 70 boards Aug-Oct (need 60) Crate Regulation Board (CRB) All 80 boards produced, delivered, and tested at CERN

T.Y. Ling, EMU Meeting, September Prod. Schedule: Peripheral Crate Boards * preproduction boards

T.Y. Ling, EMU Meeting, September Peripheral VME Crate and Mini-rack VME Crates –Prototype crate checked at OSU. (July 04) –Parts purchased, machined for 72 crates (need 60) –All parts delivered to CERN –All VME crates assembled (without backplanes) Mini-Racks –24 mini-racks ordered and delivered to CERN (need 24). –Mounts and strain relief installed. Mini-rack

T.Y. Ling, EMU Meeting, September EMU FED Crate (in USC55) CRATECONTROLLERCRATECONTROLLER DDUDDU DCCDCC DDUDDU DDUDDU DDUDDU DDUDDU DDUDDU DDUDDU DCCDCC DDUDDU DDUDDU DCCDDUs DCC DDUs optional 5 Wiener Crates ordered/2 delivered (need 4). 4 CAEN Controllers ordered. Detector Dependent Unit (DDU) Collect data from 15 DMB (15*160MB/s) Send data to DCC (640MB/s) Check data, Detect error, send to FMM Spy data to local DAQ via Gigabit Ethernet links Status 10 preproduction boards in August 05. Full production: Oct, 2005 Will produce 40 boards (need 36). Detector Concentration Card (DCC) Merge data from 10 DDU (10*640MB/s), send data to CMS DAQ SLINK64 Receive and fan out TTC fast control Status 2 preproduction boards in July 05. Full production: Sept, 05 Will produce 10 boards (need 8). Custom Backplane Full size prototype tested. 5 boards produced. (need 4).

T.Y. Ling, EMU Meeting, September Prod. Schedule: FED Crate Boards preproduction boards USC 55 scheduled for occupancy Nov 2005.