Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/19/2011.

Slides:



Advertisements
Similar presentations
5 th ILD Workshop Orsay, 23 rd -25 th May 2011 D. Moya, J. Duarte, I. Vila, A. Ruiz - IFCA (CSIC-UC) F. Arteche, C. Esteban - ITA Strip FTD Readiness for.
Advertisements

A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.
Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
BTeV Trigger Architecture Vertex 2002, Nov. 4-8 Michael Wang, Fermilab (for the BTeV collaboration)
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
Mechanical Work Plan Discussion Bill Cooper Fermilab.
E.Kistenev, Forward Upgrade Meeting 08/18/04 Forward (Nose Cone) Calorimeter: Update 2.5 mm.
1 November 18, 2014 DOE SC-OPA Review of 12 GeV ENC vs. preamp load FSSR2 by FNAL Single chip on a PCB Load from capacitors SVT module testing.
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
13 Dec. 2007Switched Capacitor DCDC Update --- M. Garcia-Sciveres1 Pixel integrated stave concepts Valencia 2007 SLHC workshop.
Pixel Pilot system Simon Kwan November 8, 2011 Pixel Upgrade Parallel Session CMS Upgrade Week, Nov 7-10,
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
CMS Phase 2 Tracker R&D R. Lipton 3/27/2014 Module R&D Allocation: Requested ~ $320k, received ~160k – Eliminate VICTR testing (continue with FNAL funds.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
3D-FBK pixel sensors with CMS readout: first tests results M. Obertino, A. Solano, A. Vilela Pereira, E. Alagoz, J. Andresen, K. Arndt, G. Bolla, D. Bortoletto,
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
Sensor Choice The story here is surely damage – See that silicon worked well in the PLT test until we shifted the timing to optimize diamond Reducing BX.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July.
MTest Pixel Telescope – Status Update David Christian September 11, 2007.
FPIX pixel module assembly Kirk Arndt on behalf of US CMS Pixel Mechanics R&D at Purdue and Fermilab.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
Hybrid Pixel R&D After BTeV As of two years ago: –FNAL-designed readout chip had two minor fatal flaws. –No system demonstration had yet been done. An.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
Report on CMS 3D sensor tests Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
CMS pixel telescope at MTEST 1 A. Kumar, S. Kwan, A. Prosser, R. Rivera, M. Turqueti, L. Uplegger.
Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/28/2012.
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Maria Rita Coluccia Simon Kwan Fermi National Accelerator Laboratory
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
1 KU MRI What is the MRI? What is KU doing? Firmware/testboards Optical hybrids Sensors.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Pixel Pilot system Hardware Status Simon Kwan August 28, 2012 CMS Pixel Upgrade Workshop, Grindelwald1.
Irradiated 3D sensor testbeam results Alex Krzywda On behalf of CMS 3D collaboration Purdue University March 15, 2012.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
An Overview of the FPIX Detector Upgrade – CMS Experiment
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
Si Sensors for Additional Tracker
The timing upgrade project of the TOTEM Roman Pot detectors
HPS: R&D issues Krzysztof Piotrzkowski (UCLouvain/CERN)
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Introduction Status before the 2009 run Results from the 2009 run
Readout System of the CMS Pixel Detector
Hybrid Pixel R&D and Interconnect Technologies
Simulated vertex precision
Adapting the via last Design
Status of CMS-PPS timing detectors
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/19/2011

Krzysztof Piotrzkowski July 2011

Design Considerations Based on the last three slides, we make the following assumptions –Ready for installation in 2013/2014 –Four stations (2x2) at 240 m from IP5 –Each station has 4 pixel planes covering roughly 1cm x 3 cm –Resolution per plane ~50  m (??) –Would like to avoid large dead area near pocket window –Use as much as possible parts from CMS pixel detector (sensor, ROC, optical links, DAQ etc) –Use ~300m long optical fibers for signal/trigger/control transmission to/from CMS DAQ –High and potential high fluence up to p/cm 2 /year (please confirm) –Detector sitting in its own box and not in secondary vacuum If any of the above are not valid, please sing out loud

Other important considerations Tracking group too small; needs help on getting resources (money, expertise) R&D activities focused more on 3d sensors which would not be ready for 2013/2014 Not difficult to come up with a design for the Technical Proposal but will there be interest amongst the collaborating groups to build such a system –Stage II system will be very different (diversion of effort both in building and operating it) –Rather limited physics reach –Little synergy with CMS pixel upgrade CMS Pixel upgrade now plans to have a pilot system ready for 2014 (manpower, diversion of effort ……). Possible to combine effort with FP240 Tracker???

Pixel Modules (contd) Alternatively, we still have about 14 good sensor wafers that we could use (each wafer has two 2x3s and two 2x4s) Still has a number of the PSI46v2 ROC wafers and enough tested good VHDIs ~ 14 2x4s and 10 2x3s) Question is of course on bump bonding and re-start the plaquette production (time, money, resources etc but do-able)

CMS Pixel Modules A 2x3 or 2x4 CMS FPIX plaquette could be used for the plane Inventory: Breakdown below 500V and more than 1% bad pixels per ROC -> acceptable? About 6-8 each of the grade B 2x3 and 2x4s are not available any more (used in the Fermilab MTEST pixel telescope)

Will Johns July 2011

Station Design Each plane could be tilted at 30 degree or more to minimize the dead area near the pocket wall Pixel size is 100x150 um and if resolution required is 50um, don’t need x-measuring and y-measuring plane It can be mounted on a carbon fiber with excellent thermal conductivity. All planes will be sitting on a metal base plate with cooling lines inserted. Cooling can be implemented (may really be needed if the fluence is as high as claimed) Each plane will be connected by a short flat cable to a PCB which serves a pair of station. One TBM will be located on the PCB to orchestrate the readout. Power and signal/control will be provided to the ROCs through this PCB Need to design the PCB (Station readout card) and the cable (pigtail) Pigtail is about cm long

Station readout Pigtails will connect to a port card. Two pigtails per station The two stations on the same arm will be readout by the same port card Port card will house one Analog optohybrid ( 6 channels) and one DOH (for the ROC settings). It will also has the gatekeeper, delay25, TPLL etc. Pretty much like the current Port card for FPIX but needs a different yet simple redesign From the port card, long optical fibers will carry signal to/from the central CMS DAQ While details still have to be worked out, the proposed conceptual design should work and would need only minimal change to the DAQ and DCS software.

Will Johns July 2011