H.TauregTechnical Forum June 20031 B and T monitoring News on B field mapping B field monitoring Temperature monitoring.

Slides:



Advertisements
Similar presentations
Magnetic fields R&D update B. PlasternEDM November 2007 Collaboration Meeting Results from prototype studies of a 1/6-scale B 0 coil with Results from.
Advertisements

Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
CM-18 June The Measurement and Monitoring of the Field from the MICE Magnets Michael A Green Lawrence Berkeley Laboratory, Berkeley, USA Frank Filthaut.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
Out2 silk screen assembly H. Wieman revised Jan 30, 2009 for aluminum silkscreen frame with 5 mm dowel pins.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
Yurii Levashov Undula t or fiducialization test Oct. 14, 2004 Undulator Fiducialization Test Results Fiducialization Tolerances.
The LHCb Inner Tracker Marc-Olivier Bettler SPS annual meeting Zürich 21 February 2007.
Solenoid Magnetic Field Measurement. MICE solenoid includes 5 coils First solenoid expected at FNAL for magnetic field measurements in April Measurements.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
Leaf Spring prototype preparation M.Lenti. Reminder Piet’s proposal: two dowels inserted into two mirror holes (vertical alignment); mirror weight as.
Solenoid Magnetic Field Mapping Paul S Miyagawa University of Manchester Objectives Mapper machine Mapper software Simulation Corrections Fitting Future.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
ATLAS: SCT detector alignment and B field map. Steve Snow New Year 2005 This title describes work that has been growing from low priority at the start.
CFD team supports CERN development 19 May M.Battistin CERN May 19 th 2011 C omputational F luid D ynamics team C omputational F luid D ynamics team.
18 June 20031Integration Review B. Schmidt Outline: Filter design and basic concept to ensure seismic stability Filter Installation and the required tooling.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Kick-off meeting 07/07/2014.
23 July 2012D. Sober1 Some thoughts on Hall D tagger magnet field mapping D. Sober Catholic University of America GlueX Beam/Tagger biweekly meeting 23.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
LCWS14 Benoit CURE - CERN/PH Dept.1 International Workshop on Future Linear Colliders October 2014 Organized by the Vinca Institute of Nuclear.
Status of the COBRA Magnet Wataru OOTANI MEG review meeting Feb. 3, 2003 PSI Switzerland.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
ATLAS Inner Detector Magnetic Field I am responsible for providing the magnetic field map for the ATLAS Inner Detector.  6m long x 2m diameter cylindrical.
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
5 September 2006 John Hart RAL ATLAS physics meeting 1 Preliminary Report on Solenoid Mapping Field mapping completed in first week of August Aim to measure.
HPS Collaboration Meeting JLAB, May Tracker Design Status M.Oriunno, SLAC.
H.TauregTB December B-Field Mapping. H.TauregTB December Schedule Install equipment: May 2005 Start mapping: mid June 2005 Finish mapping:
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No. 28 Absorber Systems & MICE Magnets Session 6 October 2010 technical drawings by.
Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No. 29 RAL technical drawings by O.Jamet.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
COBRA Magnet Status W. Ootani June 27th, 2006 MEG Review W. Ootani June 27th, 2006 MEG Review.
SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )
LHCb Experimental Area Meeting V. Bobillier1 Earth network in UX85 experimental cavern.
Beam line Experiment area SC magnet Pion production target
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
1 Zero Degree Calorimetry for CMS Had EM e +,  - Michael Murray for CMS.
GROUNDING, SHIELDING & COOLING ISSUES ON LHCb ELECTRONICS AT THE LHC PIT 8 V.Bobillier, J.Christiansen, G.Corti, D.Lacarrère, R.Lindner, L.Roy, E.Thomas,
LEB meeting March 21 st, 2012 LHCb Survey Tolerances and Stability estimation Jean-Christophe Gayde March 21 st, 2012 LEB Meeting - EDMS n° XXXXXXX1March.
Equations of Circles. You can write an equation of a circle in a coordinate plane, if you know: Its radius The coordinates of its center.
Status VELO alignment 1.Alignment at IP8 Jo van den Brand Frans Mul June 2, 2006.
Mapping the Magnetic Field of the ATLAS Solenoid Paul S Miyagawa University of Manchester ATLAS experiment + solenoid Objectives Field mapping machine.
VELO Integr - Jan06Jean-Christophe GAYDE TS/SU EDMS n° SURVEY FOR VELO INSTALLATION 1.SURVEY AT GROUND FLOOR - FIDUCIALISATION 2.SURVEY FOR INSTALLATION.
Phobos Magnet Status Leslie Rosenberg & Patrick Decowski, MIT Technical Advisory Committee November 1998.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
JRA1 PCMAG field mapping Elements of the work: Hall sensors: improvements and production Calibration of Hall sensor cards Mechanical mapping device Installation.
Dipole Magnetic Field Effect on the Antiproton Beam
Oleg Vasylyev, GSI Helmholtz Center, Darmstadt, Germany
The LHCb Installation Story
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
LumiCal mechanical design, integration with LDC and laser alignment
SPARC Review Committee Meeting
Test beam setup: status report 10/02/2009
Station and Module Support Frames
Equipment of experiments directly interfering with the beam operation
Outer Tracker Nominal Position
Alignment of Main Linac Cryomodule (MLC)
Plotting Points Guided Notes
Measurement and Characterization of a 5T Solenoid Field
Hall probe Location on top or bottom
Presentation transcript:

H.TauregTechnical Forum June B and T monitoring News on B field mapping B field monitoring Temperature monitoring

H.TauregTechnical Forum June B field mapping measuring machine for dipole is being constructed solenoid machine to be modified mapping in September /October 2004

H.TauregTechnical Forum June Dipole measuring machine LHC-b, view along beam

H.TauregTechnical Forum June Dipole measuring machine LHC-b, view of vertical plane through the beam

H.TauregTechnical Forum June Solenoid measuring machine sensors rotation axis rail chariot

H.TauregTechnical Forum June Sensor head for solenoid

H.TauregTechnical Forum June mm 30 mm 56.5 mm 30 mm precision hole for dowel pin hall probes ADC addressing thermistor mux Hall probe plate

H.TauregTechnical Forum June probe 1 probe 2 probe 3 thermistor glass cube “bond” support Hall probes

H.TauregTechnical Forum June NMR and Hall probes NMR Hall

H.TauregTechnical Forum June Try to monitor ‘environment’ inside L3 solenoid and UX cavern Temperature probes NOT part of any specific sub-detector Counting rooms (PX, SX) and racks not included in this job Temperature probes

H.TauregTechnical Forum June Temperature probes

H.TauregTechnical Forum June along cavern roof, 4 above cooling units along gangways above racks below muon arm Locations in the cavern

H.TauregTechnical Forum June Locations on the support frames 18 probes around outer rim of support frames, 3 times along beam direction, at the two ends and in the center, 54 total