15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania1 EMCAL CATANIA A. Palmeri - F. Noto.

Slides:



Advertisements
Similar presentations
D-Cal production preparations in Japan Dec. 16, 2009, D-Cal meeting at CERN Tatsuya Chujo (Univ. of Tsukuba) for the D-Cal Project 1.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Chubaka Producciones Presenta :.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
DCal Meeting
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
Aristotelis Botzios-Valaskakis MSc Mechanical Engineer Division of Development Programmes Building Energy Performance Reliable Predictions ESCO’s point.
LAV construction status Matthew Moulson (Frascati) NA62 Photon-Veto Working Group Meeting CERN, 27 May 2009.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
ALICE high p T workshop, LBNL, April 7, 2009 (T. Chujo) J-Cal Construction Plan Tatsuya Chujo University of Tsukuba (for the ALICE J-Cal Project) 1.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Update on module mounting on staves and stavelets 13/6/11 1 1) Status of clean room for next assembly kit 2) DC to DC stave.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 25, 2004.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
ALICE EMCAL CATANIA FACILITY The assembly Lab Assembly Team Catania Team is composed: 1 Ricercatore Armando Palmeri 1 Assegnista Tecnologo Francesco.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
LCG Persistency Framework Project Boundary Conditions and Overall Schedule Torre Wenaus, BNL/CERN.
ESS WP4 Strategy for series production ESS TAC10 – 5th to 6th November Lund Sébastien Bousson WP 4 leader.
Kitakami Side AHCAL Assembly or anywhere in any detector.
BM&N STS ladders assembly in VLHEP
Planning for Proto-DUNE PD Installation and Cabling at CERN
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
Complementary ISTC Projects #3888, 3889p
ERMC/RMM activities May 2017
Overview of the Frascati Production Facilities
EHN1 Neutrino Installation Plans
Accelerator Module Test Facility
CMS Goal of the experiment
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
McDonald’s Kalender 2009.
Problem Gambling Clicks to Opgr.org
CNGS horn / reflector in 2005: The story of the glass ring insulator
McDonald’s calendar 2007.
February 2007 Note: Source:.
McDonald’s calendar 2007.
East Hall under construction
Polarized 3He target installation
2015 January February March April May June July August September
Presentation transcript:

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania1 EMCAL CATANIA A. Palmeri - F. Noto

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania2 STATUS OF THE MODULES ASSEMBLY HALL IN CT Let start this presentation with the picture showing the involved people. Let start this presentation with the picture showing the involved people. The photographer is also participant to the assembly activities. The photographer is also participant to the assembly activities. At the present time the agreement with the local management is At the present time the agreement with the local management is ALL OF THEM ARE ALLOCATED TO THE ALICE EMCAL COLLABORATION For 3 Years

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania3 The high number does not correspond to a great full time occupancy. Really they will be organized in turnover: two people for ONE MODULE ASSEMBLY. The high number does not correspond to a great full time occupancy. Really they will be organized in turnover: two people for ONE MODULE ASSEMBLY. In case of need, in the future, their part time contribution may be extended to a large fraction In case of need, in the future, their part time contribution may be extended to a large fraction of their weekly working time (max 50%). of their weekly working time (max 50%). All of them will work on the stacking and compression phases and some one on the All of them will work on the stacking and compression phases and some one on the STRIP ASSEMBLY. STRIP ASSEMBLY. STATUS OF THE MODULE ASSEMBLY HALL IN CT

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania4 MENU 1. MANPOWER 2. ASSEMBLY HALL 3. MODULE 1. Assembly STATION 2. Compression STATION 4. STRIPS Assembly STATION 5. SHIPPING TOOL

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania5. In our program it was supposed to be ready in April /2008 It will be ready by end of September/2008. The main problem we have had has been the strong delay of the University in the “MOVE OUT” the area where the Hall has to be built. For unknown raisons, while the Call for tenders was achieved the end of January/2008, the PO was placed only begin of June. only begin of June. The University is the owner of the land and, of course, its transformation. The building, electric network, cooling air system, are in charge of the INFN. All INFN PO were placed by the end of December/2007! All INFN PO were placed by the end of December/2007! STATUS OF THE ASSEMBLY HALL IN CT

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania6 Ground : cleaning and “concrete screed”. Ground : cleaning and “concrete screed”. (see the next slides) (see the next slides) call for tenders Jan/2008 call for tenders Jan/2008 PO delivered to the winner firm only on June/12th 2008 !!!!!!!! PO delivered to the winner firm only on June/12th 2008 !!!!!!!! Catania University (28 working days) Catania University (28 working days) anyway anyway JOB ACCOMPLISHED ON JULY/ JOB ACCOMPLISHED ON JULY/ STILL REMAIN (too much but…….) STILL REMAIN (too much but…….) Hall construction : PO Dec/2007 INFN (4 weeks) Hall construction : PO Dec/2007 INFN (4 weeks) Electric network : PO Dec/2007 INFN (1 week) Electric network : PO Dec/2007 INFN (1 week) Air conditioned : PO Dec/2007 INFN (2 days) Air conditioned : PO Dec/2007 INFN (2 days) STATUS OF THE ASSEMBLY HALL IN CT

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania7 STATUS OF THE ASSEMBLY HALL IN CT STATUS OF THE GROUND ON JUNE/

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania8 ASSEMBY HALL STATUS of the GROUND on JUNE/ :

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania9 The 25/6/2008 WORKSHOP HALL

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania10 The 08//July/2008 WORKSHOP HALL

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania11 ASSEMBLY HALL About 80 m 2 About 80 m 2 Ergonomics estimated by Francesco Ergonomics estimated by Francesco One small hall equipped with two PC to guarantee the access to INTERNET to the operators (+a refrigerator) One small hall equipped with two PC to guarantee the access to INTERNET to the operators (+a refrigerator) Room for several Stations: Room for several Stations: 2 Assembly (????) 2 Assembly (????) 3 (or more) Compression (????) 3 (or more) Compression (????) 1 STRIP assembly desk 2x0.8 m 2 1 STRIP assembly desk 2x0.8 m 2 Office Assembly/Compression station Strip Assembly Station

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania12 MODULE The Assembly/Compression Station (made in Frascati)

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania13 MODULE The Assembly/Compression Station (made in Catania)

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania14 MARBLE 190x80 cm 2

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania15 AVAILABLE FACILITIES AVAILABLE FACILITIES 1 ASSEMBLY STATION (from Frascati) 1 ASSEMBLY STATION (from Frascati) 2 COMPRESSION STATIONS (Ct) 2 COMPRESSION STATIONS (Ct) Completely equipped Completely equipped 11 Load Cells (one spare) 11 Load Cells (one spare) MODULE The Assembly/Compression Station

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania16 STRIP ASSEMBLY TOOL (preliminary) Design ok Design ok Procurement of the Material ok Procurement of the Material ok Machining INFN CATANIA (?) Machining INFN CATANIA (?)

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania17 STRIP ASSEMBLY TOOL

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania18 Lifting a Module by a little crane The precision of the position is guarantee by the PINS using the FP precision holes STRIP ASSEMBLY TOOL

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania19 Lifting the Strongback by the little crane STRIP ASSEMBLY TOOL

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania20 STRIP ASSEMBLY TOOL Guide Bearing DIMA Strongback Winder Bosh Profile 45x45 Worm Screw M16 Threaded Support

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania21 STRIP ASSEMBLY TOOL Module PIN DIMA The position precision is give by the pins connecting the plates and the DIMA. The StrongBack positioning is operated by the screw.

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania22 STRIPS SHIPPING TOOL Design Design Machining in the INFN Machining in the INFN Procurement Material (ok) Procurement Material (ok) 6 Wire Rape Isolator (ok) 6 Wire Rape Isolator (ok) Transportation to GRENOBLE Transportation to GRENOBLE by INFN Staff (high probability) by INFN Staff (high probability)

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania23 STRIPS SHIPPING TOOLING Bosch profiles

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania24 STRIPS SHIPPING TOOL

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania25 Transportation to Grenoble should be Transportation to Grenoble should be operate by our technical staff. operate by our technical staff. Costs are lower than that of any external firm for, at least, Costs are lower than that of any external firm for, at least, 3 STRIPS 3 STRIPS STRIPS SHIPPING TOOL

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania26 STRIPS SHIPPING TOOL Wire Rape Isolator

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania27 ALICE EMCAL CRADLES Received on july/ long side plates

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania28 4 SM crates in construction 4 SM crates in construction upper long side (face superieur) ready upper long side (face superieur) ready saw tooth side construction started on July/14 and ready by the END OF THIS WEEK. saw tooth side construction started on July/14 and ready by the END OF THIS WEEK. Assembly for shipping foreseen by the first week Assembly for shipping foreseen by the first week of August of August ALICE EMCAL CRADLES

15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania29 We are ready to receive the components of Modules & Strips for ASSEMBLY. First MODULE ready beginning of OCTOBER All the CT technical activities will be managed by Francesco FrancescoCONCLUSIONS