Poverty is easy to recognize but difficult to define. “Characteristics of being poor” "They are invisible and excluded from society, often deformed or in pain, without hope, unwanted, totally dependent, and vulnerable. It is a chasm into which many fall. Its width and depth, defining the chances of falling in and getting out again, depend on the wealth of the country and its will to distribute it. Like the circles of hell, there are many levels". Volkmann
Sl. No. Item of ActivityDate 1.State level training at Bhubaneswar for PD, DRDA, APD(admin), District Statistical Officer 13 th Oct’09 2.Meeting of Collectors16 th Oct’09 3.Training at District Level23 rd or 24 th Oct’09(Either of the day) 4.Block level trainings at each block headquarters28 th, 29 th, 30 th, 31 st Oct’09(any one day to be decided by the Collector) 5.Special Meeting of PRIs at ZP/ PS and GP levelBetween 1 st to 5 th Nov’09 (To be decided by the Collector) 6.Display of detailed list (L-30 form), photography and recording of biometric identification of the head of HH of each HH in the GP office 15 th to 30 th Nov’09 7.Conduct of validation in each village (house-to- house) and subsequent cross-checking 1 st Dec to 15 th Dec’09 8.Data validation and entry of new HHTo be completed by 30 th Dec’09 9.Special PallisabhaAny day between 1 st to 15 th Jan’10 10Preparation of final list and web-hosting31 st Jan’10 Calendar of Events – VALIDATION OF BPL 2002 SURVEY LIST
V ALIDATION OF BPL 2002 SURVEY LIST L-30 L-30 forms will be displayed in the G P Office from 15 th November 2009 to 30 th November 2009 BPL facilitator will explain about the validation process, calendar and HH score. Verifying Officer would visit house-to-house for validation /inclusion of new household using blank L-00 forms and L-30 forms for reference. L-00 Verifying Officer will write the five digit Family ID (in case of existing household in BPL 2002 Survey list) or last Family ID of that village/ 01, 02, 03, …,0n (in case of new household) on the wall/ door of the house of each HH by using a brick colored chalk.
V ALIDATION OF BPL 2002 SURVEY LIST (C ONTD..) Scheduled Tribes including the Primitive Tribal Groups, Scheduled Castes, Women headed households, daily wage earners, families having disabled child/ children and persons with HIV/AIDS will get due priority during the validation / inclusion process. Concurrently, the Supervisory Verifying Officer will randomly crosscheck 15% HHs already verified by the Verifying Officer. SVO cannot include any new data or make any correction in the validation forms (L-00) submitted by the Verifying Officer.
V ALIDATION OF BPL 2002 SURVEY LIST (C ONTD..) In case of large-scale discrepancy reported by the SVO, the BDO can recommend for re-verification of the some/ entire village. Collector may issue order for re-verification through another Verifying Officer. After data entry, village-wise list of family details with name of the head of HH, social category and total score obtained will be generated ( L-60 forms ) (ST-first, SC- second and Other Caste-third). L-60 forms HHs from each village will be ranked in the descending order of poverty (i.e. the ascending order of scores) in the list (L-60 forms). L-60 forms will be placed in Pallisabha for ratification
PRINTING OF FORMS L-00 forms (Blank Application forms), Instructions to fill up the forms will be printed locally at District Hqrs. L-30 forms will be printed from the CD/ website either at DRDA or Block office. L-60 forms will be printed from the website at Block office after completion of data entry. All forms should be in A-4 size.
B UDGET Cost of printing per form :Rs.0.40p (maximum) Remuneration per HH:Rs.1.00p (fixed) Remuneration for Supervision per HH:Rs.0.50p (fixed) Data entry per HH:Rs.0.50p (fixed) Training cost per participant per day:Rs.50/- (fixed) Mobility & P.O.L per District:Rs.25,000/- Contingency/Misc. per District:Rs.1.00 lakh I.E.C costper GP: Rs.1000/- Total Requirement for the State is Rs lakhs (approximately)
Families Surveyed – BPL Survey Household List SL No.District Name No. of Block No. of GP No. of Village No. of Families Surveyed STSCOthTotal 1ANUGUL BALANGIR BALESHWAR BARGARH BHADRAK BOUDH CUTTACK DEOGARH DHENKANAL GAJAPATI GANJAM JAGATSINGHAPUR JAJAPUR JHARSUGUDA KALAHANDI KANDHAMAL KENDRAPARA KENDUJHAR KHORDHA KORAPUT MALKANGIRI MAYURBHANJ NABARANGAPUR NAYAGARH NUAPADA PURI RAYAGADA SAMBALPUR SONEPUR SUNDARGARH Total
DISTRICT-WISE INFORMATION ON BPL CENSUS Name of the District 1992 SURVEY1997 SURVEYBPL 2002 SURVEY Total Rural Families NO. OF BPL FAMILIES Total Rural Families NO. OF BPL FAMILIES Census personBPL 2002 BOUDH GAJAPATI GANJAM KALAHANDI KORAPUT MALKANGIRI NABARANGP UR NAWAPARA KANDHAMAL RAYAGADA SD
DISTRICT-WISE INFORMATION ON BPL CENSUS (Contd..) Name of the District 1992 SURVEY1997 SURVEYBPL 2002 SURVEY Total Rural Families NO. OF BPL FAMILIES Total Rural Families NO. OF BPL FAMILIES Census personBPL 2002 ANGUL BALANGIR BARGARH DEBAGARH DHENKANAL JHARSUGUDA KEONJHAR SAMBALPUR SONEPUR SUNDERGARH ND
DISTRICT-WISE INFORMATION ON BPL CENSUS (contd..) Name of the District 1992 SURVEY1997 SURVEYBPL 2002 SURVEY Total Rural Families NO. OF BPL FAMILIES Total Rural Families NO. OF BPL FAMILIES Census personBPL 2002 BALASORE BHADRAK CUTTACK JAGATSINGHPU R JAJPUR KENDRAPARA KHURDA MAYURBHANJ NAYAGARH PURI CD TOTAL ND CD SD
(Sept. 09) Performance of Districts under
ORISSA
Yearwise TFA and Expenditure under NREGS(Orissa): to (upto Sept. 09)
O RISSA Strengths 85% wage disbursement through accounts 100% MIS operationalisation Concerns: Overall decline in HHs provided employment: 18% Districts with low persondays per households (less than 20): Kalahandi (19%), Sundergarh (17%), Phase III districts except Cuttack (average 16%). Low work completion rate: Only 2.8% for the State 60:40 wage-material ratio not maintained: Jharsuguda (30%), Kalahandi (53%), Nawarangapur (49%), Nuapada (41%), Sambalpur (48%) and Bhadrak (45%) Avg. wages paid higher than Notified wage: State Average is Rs – 22 districts Less than 50% wage disbursement through accounts: Boudh (10%), Malkangiri (9%), Jagatsingpur (42%) and Khordha (0%)
O RISSA New Initiatives Gaon Saathi for each village GRS for each GP GPTA for each Block Gram Rojgar Sanjojak-cum-Mate for each work now-weekly payment SBI-Business Correspondent for each GP for onsite payment Computers now even at GP level Training of PRIs for demand generation Social Audit at 5000 GP in 2009 Opportunities Overall decline in involvement of DPCs Too small works and no visibility Rumour that agri-wages are up due to NREGA GoI may include CC Roads in ST/SC Basti and labour component of IAY Emphasis on convergence with agriculture,forest and water resources RTI and now Ombudsman who can lodge FIR against “delayed payment of wages
17 Improvements Wage rate of earth work in Orissa & AP for 126cum earth work PWD Rs 3701/ NREGA-Orissa Rs 4542 NREGA AP Rs14175/ Opportunities for convergence Sept 2009 DepartmentFundexp UC Water Resource 18.22cr6.25cr 1.62cr Forest18.19cr9.18cr3.38cr Agriculture46.89cr33.35cr7.41cr Fisheries ARD0.77cr0.19crnil ST SC Deptt3.13cr2.07cr0.88cr H & Textile4.37cr3.40cr0.57cr RD0.99cr0.64cr0.63cr Works0.94cr0.68cr0.50cr Total93.53cr55.77cr15.02cr NREGA576.67cr215.13cr
SGSY
Achievement under SGSY Year Total number of swarozgaris assisted Credit Mobilised (Rs. in crore) Target Achieve ment %Target Achieve ment %
1.Village Hatt: Better marketing facility - rural poor to sale their product though-out the year. Shopping platform - strengthen forward and backward linkage. Promotion of growth center-convergence and rural economy. Block Level Three Village hatts in each district -Rs.15 lakh per hatt. GoI share 1 st installment released to all DRDAs, DRDAs to 60% to claim 2 nd installment of Central Share. Collectors may go ahead with construction of Village Hatts as per GoI Guidelines. District Level; District to submit DPR for Hatt at the District headquarters - Rs.1.5 crore. Major Issues
2.Rural Self Employment Institute ( RSETI) Structure GoI to provide Rs crore one time grant for infrastructure. State Government to provide land free of cost to the Sponsoring Bank. Each RSETI to train to 70% BPL youth. Rs lakhs for period of 3 years can be provided for the rent MoRD to support recurring cost of training(maximum Rs. 4, 000/-). Issues with Collectors: Collectors should identify land/site and co-ordinate for setting-up RSETI. Land identification should be completed-31 st December, Committee under the Chairmanship of the Collector shall be constituted. PD DRDA. GMDIC. AGM of Lead Bank. AGM, NABARD. Director RSETI. Lead District Manager- Member Convener.
3. General Issues Meeting of BLCC/ DLCC on SGSY to held regularly. Basic Orientation Training to all Swarozagaries before Bank Loan. Collectors are authorized to undertake infrastructure project under SGSY with approval of the District SGSY Committee. 10 % of total allocation for swarozgaries of % of total allocation for swarozgaries of previous years. No Infrastructure/Training Fund to create corpus fund for micro-finance /managing the SHG federations. Placement based skill development training programme. 4.Restructuring of SGSY to NRLM Focus on universal coverage of rural poor into SHGs. To be launched from
DRDA Administration
Merger of DRDA Employees GoI emphasizing for absorption of DRDA employees in the line Department. DRDA employees be redeployed in Z P. On redeployment ZP, they can be deputed to DRDA Cell of Z P After absorption- GoI would sanction grant-in-aid Other Issues Computer Programmers not to be transferred (Bhadrak and Rayagada Districts). Outsourced posts should be outsourced, should not be contractual. GRS vacancies be filled-up by with Civil Engineering background.
G RAM P ANCHAYAT A UTOMATION. Computer hardware and peripheral to be procured from NICSI for computerization of Gram Panchayats (one Laptop Computer and one Printer) out of Twelfth Finance Commission Grant. Two laptop computers to be procured for each Panchayat Samiti out of Twelfth Finance Commission grant.
RURAL HOUSING
RURAL HOUSING (IAY) IAY scheme came into force since as an independent scheme and now a Flagship programme of Govt. of India under the banner of “BHARAT NIRMAN”. TARGET GROUPS BPL households living in the rural areas belonging to SC/ST, freed bonded labours and non-SC/ST BPL normal households, widows and next of Kin to defence personnel /paramilitary forces killed in action residing in rural areas( irrespective of their income criteria) ex-service men and retired member of paramilitary forces fulfilling the other conditions. 60% of the target is meant for SC/ST and balance 40% is meant for non-SC/ST beneficiaries. 15% reservation for Minority Community. 3% reservation for physically and mentally challenged persons & the funding pattern is 75:25 between Central Govt. and State Govt.
SPECIAL PROVISION FOR NATURAL CALAMITY VICTIMS. 10% of the district’s annual target or Rs lakhs (including State Share) whichever is higher during a financial year is earmarked for Natural Calamities. The district Administration is authorized to first incur the expenditure and extend assistance to the victims and submit the proposal to Govt. of India for reimbursement of the funds. SELECTION PROCEDURE. “Pallisabha” The beneficiaries are selected by “Pallisabha” and the beneficiary has to construct the house himself/herself and no middle man is allowed. The 5 years permanent wait list prepared on the basis of 1997 BPL Survey is the basis of beneficiary selection till date as the BPL list 2002 has not been finalised. The eligibility of the potential beneficiaries must be checked by the Panchayat Executive Officers / Extension Officers (other than J.Es /GPTAs) before issuing work order.
The unit cost has been revised to Rs.35,000/- w.e.f 2008/09 per unit instead of Rs.25,000/-. Funds will be released at 4 installments. 1 st installment...Rs. 5,000/- Alongwith work order. 2 nd installment...Rs. 10,000/- After completion of plinth level. 3 rd installment...Rs. 10,000/- After lintel level. 4 th installment…Rs. 10,000/- After roof casting/ laying No deduction other than royalty and Rs.50/-( for Photo) shall be made than the Unit cost.] RCC slab is not mandatory. Any type of fire proof roofing (RCC Slab /AC sheet /GCI sheet/Tiles) etc. is permissible. Payment to beneficiaries shall be made through direct credit of funds to their individual savings Bank Account opened in the Banks /Post Offices.
The IAY(normal) target is During Govt. of India have allocated nos. of houses as additional package and the same target will be taken into account in the year , aggregating the total target to An amount of Rs lakhs have been released to 28 Districts (except Jagatsinghpur and Kendrapada) by Govt. of India towards 1 st installment. An amount of Rs lakhs has been released towards the matching State Share till Sept,2009. Upto Sept-2009, nos. of houses have been completed out of the last year’s spill over houses, nos. of houses are under progress.
An amount of Rs lakh has been provided in the BE for An amount of Rs lakhs was sanctioned to the districts, as against the physical target of 28, houses have been provided to Kandhamal District as a special package. 216 nos. of houses have been completed by March,2009. Expenditure till March,2009 is Rs lakhs An amount of Rs lakhs has been provided in the B.E for against a total target of nos. of houses houses have been provided to Kandhamal District as a special package. Expenditure upto Sept, 2009 is Rs lakhs as against previous year’s target and 2493 nos. of houses have been completed. Rs lakhs is being released. MO KUDIA
M AJOR I SSUES All the beneficiaries should have their SB account in Bank/ Post Office so that it will be easier to include all the information in the database. All work orders are to be issued immediately so as to facilitate for getting 2nd installment of Central Share. Eligible beneficiary having no homestead land, ear-marked fund of Govt. of India for purchase of land and allotment of the same to the eligible person be expedited. Jagatsinghpur district has not availed 2 nd installment of Central share for the year of as the district has not furnished proposal to Govt. of India. Kendrapara and Jagatsianghpur districts have not yet received 1 st installment of Central share during Kendrapara district has not yet complied the objections raised by Govt. of India. Should submit proposal to Govt. of India in the prescribed format to avail 1 st installment of funds for the year
BACKWARD REGION GRANT FUND (BRGF)
BACKWARD REGION GRANT FUND (BRGF) Convening District Planning Committee (DPC) for approval of Annual District Plan – Preparation of Annual District Plan – well in ahead by to enable GoI for release funds during 1 st week of April, Uploading of approved Annual District Plan for & in PlanPlus (Except Boudh, Bolangir, Malkangiri and Mayurbhanj). Proposal for BRGF Resource Centre at Block and GP level. Convergence with NREGA.
F INANCIAL & P HYSICAL A CHIEVEMENT UNDER DIFFERENT S CHEMES DURING ( UPTO S EPTEMBER 2009)
F INANCIAL & P HYSICAL A CHIEVEMENT UNDER DIFFERENT S CHEMES DURING ( UPTO S EPTEMBER '09) ORISSA Sl. No. SchemesFinancial (Rs.in Crore)Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY ( Normal) No. of Houses 4I.AY ( Naxalite) No. of Houses 5Mo Kudia No. of Houses 612th FC No. of Projects 7 BRGF No. of Projects 8 GGY TOTAL
ANGUL Sl. No SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY ( Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6GGY No. of Works
BOLANGIR Sl. No SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY ( Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6BRGF No. of Projects
BALASORE Sl. No SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY (Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6GGY No. of Works
BARGARH Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY (Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6GGY No. of Works
BHADRAK Sl. No SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY (Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6GGY No. of Works
BOUDH Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA SGSY No. of Swarozgaris 3I.AY (Normal) No. of Houses 4Mo Kudia No. of Houses 5 12th FC No. of Projects 6BRGF No. of Projects
CUTTACK Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgari s 3I.AY (Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6GGY No. of Works
DEOGARH Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY (Normal) No. of Houses 3aI.AY (Naxalite) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6 BRGF No. of Projects
DHENKANAL Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY (Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6 BRGF No. of Projects
GAJAPATI Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY (Normal) No. of Houses 3aI.AY (Naxalite) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6BRGF No. of Projects
GANJAM Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY (Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6 BRGF No. of Projects
JAGATSINGHPUR Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1 NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY (Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6GGY No. of Works
JAJPUR Sl. No. SchemesFinancial (Rs.in Crore)Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY Normal) No. of Houses 4Mo Kudia No. of Houses 5GGY No. of Works 612th FC No. of Projects
JHARSUGUDA Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY ( Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6 BRGF No. of Projects
KALAHANDI Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY (Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6 BRGF No. of Projects
KENDRAPARA Sl No SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY ( Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6GGY No. of Works
KEONJHAR Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY (Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6 BRGF No. of Projects
KHURDA Sl. No SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY ( Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6GGY No. of Works
KORAPUT Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY ( Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6 BRGF No. of Projects
MALKANGIRI Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY ( Normal) No. of Houses 3aI.AY ( Naxalite) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6 BRGF No. of Projects
MAYURBHANJ Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY (Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6 BRGF No. of Projects
NAWARANGPUR Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY (Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6 BRGF No. of Projects
NUAPADA Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY (Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6 BRGF No. of Projects
NAYAGARH Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY (Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6GGY No. of Works
KANDHAMAL (PHULBANI) Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY (Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6 BRGF No. of Projects
PURI Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY (Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6GGY No. of Works
RAYAGADA Sl. No SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY ( Normal) No. of Houses 3a.I.AY (Naxalite) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6 BRGF No. of Projects
SAMBALPUR Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY ( Normal) No. of Houses 3aI.AY ( Naxalite) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6 BRGF No. of Projects
SONEPUR Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY ( Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6 BRGF No. of Projects
SUNDERGARH Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA Lakh Mandays 2SGSY No. of Swarozgaris 3I.AY ( Normal) No. of Houses 4Mo Kudia No. of Houses 512th FC No. of Projects 6BRGF No. of Projects
Form L-30 First Page
From Second Page Onwards (L30) There will be a row with numbers (1-13) as heading for the 13 scoring criteria. From the 2 nd page of the print out no table headings will be required. Only number heading is enough. Records will be order by Social Group (ST, SC, Oth), Total Score, Name of HOH wise. Back
Form L-00 Back
Instructions to fill up L-00 forms by Verifying Officers Back
Phases TIMELINE MATRIX - VALIDATION OF BPL SURVEY HOUSEHOLD LIST to (15 Days) to (5 Days) to (16 Days) to (15 Days) to (28 Days) to (15 Days) Printing of Application form Distribu tion of Applicat ion Form Display of L-30 list and Objection Invitation at GP Office Data validation in villages (House-to-house) Data Entry of Validated forms Pallisabha Phase-I Phase-II Phase-III Phase-IV Phase-V Phase-VI
Form L-60 Back