Ashley Lyon CGSIC May 7th 2006 European Satellite Services Provider “EGNOS Operations Status”

Slides:



Advertisements
Similar presentations
GALILEO and EGNOS Fotis Karamitsos, European Commission
Advertisements

ESA Iris Programme workplan of activities
EUROCONTROL Experimental Centre EUROCONTROL Navigation Domain The Data Collection Network: EGNOS revealed GNSS 2004 – Rotterdam, The Netherlands Santiago.
EGNOS Services and LPV Implementation IWG #25 St Petersburg, June IWG #25.
EGNOS: a satellite navigation system for Europe, and an opportunity for Africa! Michel Bosco Head, Galileo and EGNOS Applications and International Cooperation.
The AeroSME Project: Practical Assistance for Participation in the EU Research Projects Paola Chiarini AeroSME Project Manager Hungarian Aeronautical Research.
EGNOS Evolution Program Update D
The EGNOS System Architecture Status and Future Plans
Slide: 1 ROSA GRAS Meeting February 2009 Matera, Italy User Services EUMETSAT EUMETSAT Data Access & User Support.
Making the UK the Place for Space Robert Waters Head of Industrial Strategy June 2014.
Evaluation of a Large-scale VRE Implementation - ELVI Staff and students using the VRE benefit from the greater transparency and communication that it.
Galileo Europe’s Satellite Navigation System Professor Terry Moore.
DOSTAG Meeting #51, 3 rd May 2007 Access to ESA Earth Observation data (past and current missions)
J. Ádám, B. Takács, K. Kratochvilla, P. Zaletnyik, & Sz. Rózsa – BUTE R. Farnworth & S. Soley - Eurocontrol EEC P.B. Ober - Integricom EGNOS data collection.
GALILEO INTERIM SUPPORT STRUCTURE EUROPEAN COMMISSION International Civil Aviation Organization GALILEO CAR/SAM ATN/GNSS Seminar Varadero, Cuba, 6 to 9.
Container Management in the Port of Antwerp using EGNOS
Brussels April 16th 2007 Technical Audit of Oil & Gas Pipelines PNIS Project Contract : 1,4 M € Consortium : Technipipe/AETS from July.
Wide Area Augmentation System (WAAS) E. Douglas Aguilar CAPT, USAF.
Satellite-Based Augmentation Systems (SBAS) Combined Performance
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
1 Specialist High Skills Major 2 SHSMs - previous 9 months Dec 8, 2005: –press release announcing Student Success Phase 3 including the SHSMs Spring.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
ENC-GNSS 2006 – Manchester, UK Civil GPS Interface Committee International Sub-Committee May 7, 2006 John E. Augustine Acting Director, Office of Navigation.
GLONASS Government Policy, Status and Modernization
Accademia Aeronautica Pozzuoli 3rd june 2015 Alessandro Cardi Head of Technical Regulation Directorate Remoted Piloted Aircraft System Regulation 1.
ESSP – EGNOS Service Provider Warsaw Meeting February 24th 2010.
Galileo: programme status and research activities
GPS Modernization 14 March 2005 CGSIC IISC Europe.
N° 1 The European railway Agency: an engine for the integrated railway area EFRTC, Vilamoura on June 24 TH 2005 Olivier PIRON 24 June 2005.
Green Emotion WP 4 – Grid Evolution, Task 1 - Functional and Design Requirements of Infrastructure Presented by: Philip LeGoy ESB ecars 3rd Stakeholder.
Ground Support Network operations for the GRAS Radio Occultation Mission R. Zandbergen, the GRAS GSN team (ESOC) and the Metop GRAS team (EUMETSAT) 09/09/2011.
© GMV, 2010 Propiedad de GMV Todos los derechos reservados EUROPEAN GNSS EGNOS AND GALILEO. CHARACTERISTICS AND ADVANTAGES OF BRUSSELS. OCTOBER 1 st, 2010.
10/7/ Innovative Solutions International Satellite Navigation Division ION NTM 01 Capabilities of the WAAS and EGNOS For Time Transfer SBAS, an Alternate.
European GNSS for ITS: EGNOS contribution ITS WORLD CONGRESS 2011 Orlando– 18 October 2011.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
Scott Butson District Technology Manager. Provide professional to all district staff Professional development has been provided on a regular basis to.
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
1 Promoting Evidence Based Practice: Lessons from Stockport MBC and CareKnowledge SSRG April 2008.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Multi-level monitoring - an overview James.
EUM/SAF/VWG/02/0010, Rev. 3, May 2003 Page 1 The SAF Network Concept and Status Juha-Pekka Luntama, EUMETSAT GRAS Mission Scientist
FINESTI IS A SUBSIDIARY OF THE LUXEMBOURG STOCK EXCHANGE FINESTI Collecting, managing, disseminating Access to the Luxembourg fund universe Gateway to.
Enabling Grids for E-sciencE EGEE Applications Registry Current status & latest developments Marios Chatziangelou.
EGEE-III-INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III All Activity Meeting Brussels,
EO Ground Segment and Data Access Evolution Alice Springs Refurbishment Program Presented by Simon Oliver for John Frampton.
Presented By Donald Simon, Information Systems Manager, Antigua and Barbuda Meteorological Services RA-IV WIGOS Implementation.
ProDDAGE Programme for the Development and Demonstration of Applications for GALILEO and EGNOS GALILEO.
Galileo Mission Consolidation & Maritime Needs December 18 th GISS, Brussels Status of Galileo Mission High Level Documents.
Aerospace Sector Region of Wallonia (Belgium) Mr Ashley LYON Aeronautics & Space Expert March 2015.
MODIS SDST, STTG and SDDT MODIS Science Team Meeting (Land Discipline Breakout Session) July 13, 2004 Robert Wolfe Raytheon NASA GSFC Code 922.
Munich SATNAV, Munich Satellite Navigation Summit February 21-23, 2006 Michael E. Shaw Director, U.S. National Space-Based PNT Coordination Office.
Enabling Grids for E-sciencE EGEE Applications Registry Current status & latest developments Marios Chatziangelou.
Introduction to ITIL and ITIS. CONFIDENTIAL Agenda ITIL Introduction  What is ITIL?  ITIL History  ITIL Phases  ITIL Certification Introduction to.
On the sites Two websites that provide learning materials and information Enabling organisations to meet.
Financial System Upgrade Agency Change Champion Deployment Session March 16 th, 2006.
Status of Sentinel-3 activities at EUMETSAT SIT-31 Agenda Item # 13 ESA/ESRIN, Frascati, Italy 19 th -20 th April 2016 Committee on Earth Observation Satellites.
REACH FOR POLYMERS A €480, month project aiming to increase the knowledge base of the European polymer industry, particularly SMEs, when complying.
1 Transnational Partner Search Toolkit Transnationality Contact Points Meeting 30 September Warsaw.
EUROCONTROL Navigation Domain
ESA Iris Programme workplan of activities
TRAINING AND ASSESSMENT FOR FINANCIAL ADVISERS
EUROPEAN COMMISSION Satellite-Based Augmentation Systems (SBAS) Combined Performance International Committee on GNSS (ICG-4) Working Group A Saint Petersburg,
International Civil Aviation Organization
INPE, São José dos Campos (SP), Brazil
EGNOS Service Provision Status
On the sites Two websites that provide learning materials and information Enabling organisations to meet learning needs Over 250 learning sessions on the.
Strategy April 2018 – March 2022.
Experience of a Local Coordinator
Aerodrome Certification Workshop
Presentation transcript:

Ashley Lyon CGSIC May 7th 2006 European Satellite Services Provider “EGNOS Operations Status”

EGNOS Operations StatusPage 2May 8th 2006 ESSP in EGNOS A centralized management entity for EGNOS: ESSP ESSP has been created from a subset of the EOIG (EGNOS Operators and Infrastructure Group) ESSP has been founded to become the  EGNOS Operator  EGNOS Safety of Life Service Provider, for example for Civil Aviation

EGNOS Operations StatusPage 3May 8th 2006 EGNOS Operations Consortium

EGNOS Operations StatusPage 4May 8th 2006 Jan 2005 Jan 2007 Jan 2006 System Evolutions System Development System Operations System Initial Operations EGNOS Timeline

EGNOS Operations StatusPage 5May 8th 2006 Jan 2005 Jan 2007 Open Service Commercial Services SoL Service Jan 2006 System Evolutions System Development System Operations System and Application Certification ( Safety Case) System Initial Operations EGNOS Services

EGNOS Operations StatusPage 6May 8th 2006 Jan 2005 Jan 2007 Jan 2006 System Initial Operations Initial Operations ORRODR Operations performance OQR Ramp-up Stabilization Op. Qualification ESAReqt Δ ESAReqt Δ ESA Reqt

EGNOS Operations StatusPage 7May 8th 2006 Start of EGNOS operations by the ESSP Operation Consortium Increase of staff and resources to fully support EGNOS operations Facilitate the transfer of knowledge and experience from ESA / Industry to Operator Test the operations processes and procedures Deliver remaining training packages to build up team capabilities Initial Operations Ramp-up

EGNOS Operations StatusPage 8May 8th 2006 Reach nominal EGNOS operations performance (started on April 3rd 2006) Stabilise team resource profiles, to support EGNOS operations according to the operations performance requirements Run nominal maintenance procedures across the EGNOS system Complete operations processes and procedure testing Initial Operations Stabilization

EGNOS Operations StatusPage 9May 8th 2006 Operational qualification of EGNOS system operations Demonstrate that EGNOS operations staff, plus procedures and documentation, can support EGNOS operations performances Provide evidence towards the EGNOS System Safety Case with nominal operations Concludes with the Operations Qualification Review (OQR) in early 2007 Safety of Life service provision planned to follow this milestone Initial Operations Qualification

EGNOS Operations StatusPage 10May 8th NLES Navigation Land Earth Stations EGNOS Sites GPS & GLONASS 34 RIMS Ranging & Integrity Monitoring Stations User Segment 4 MCC Mission Control Centers 3 Satellites EGNOS EWAN EGNOS Wide Area Network 2 Support Facilities

EGNOS Operations StatusPage 11May 8th 2006 EGNOS system handover Full handover of the EGNOS system did not take place at ORR  A subset of the EGNOS system was provided to EGNOS industry  1 CPF, 1 CCF, 3 RIMS (Paris, Toulouse, Lappeenranta), 2 NLES  EGNOS industry retained IOR-W (PRN 126)  ESTB was continued using AOR-E (PRN 120)  EGNOS was broadcasting on ARTEMIS (PRN 124) only  1 NLES only due to technical problem with other NLES  Remaining subset of RIMS  3 CPFs with numerous stability problems

EGNOS Operations StatusPage 12May 8th 2006 Recent changes PRN AOR-E  ESTB operating continuously since 09/06/05  Will be used for EGNOS SIS operations as from early July 2006 PRN 124 – ARTEMIS  Operated by ESSP consortium since 26/07/2005  Software version currently being broadcast since December 2005  Swap with PRN 126 mid June 2006 for operations mid July 2006 PRN 126 – IND-W  Swap with PRN 126 mid June 2006 for industrial testing mid July 2006  Limited transmissions over recent months with long periods of inactivity

EGNOS Operations StatusPage 13May 8th 2006 System Releases  New release as from mid June 2006  Another planned at the end of the year to solve CPF common mode failures

EGNOS Operations StatusPage 14May 8th 2006 SIS Availability

EGNOS Operations StatusPage 15May 8th 2006 Operational EGNOS

EGNOS Operations StatusPage 16May 8th 2006 EGNOS System Test Bed

EGNOS Operations StatusPage 17May 8th 2006 Operations User Support Website New ESSP website ( planned in a few weeks providing additional information to the users per market domainwww.essp.be Link to the Operations User Support Web Site (already existing on current ESSP website):  General information on EGNOS operations.  Projection of performances on a weekly basis (registered users).  Performance information at RIMS sites (registered users).  EGNOS Subsystem status (restricted).  SIS-down alerts by (registered users)… Existence of a Helpdesk (already existing on current ESSP website)

EGNOS Operations StatusPage 18May 8th 2006 EGNOS Operations Website Services

EGNOS Operations StatusPage 19May 8th 2006 ESSP Avenue Louise Brussels BELGIUM Telephone: +32 (0) Fax: +32 (0) More about EGNOS: Information