FP420 Low and high voltage supply INFN/Univ. of Torino July. 2008 A presentation intended to stimulate the discussion on which.

Slides:



Advertisements
Similar presentations
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
Advertisements

Development of a DC/DC converter for low voltage power distribution in LHC upgrades. Stefano Michelis Supervisor: Federico Faccio ELACCO mid-term review.
128 September, 2005 Silicon Sensor for the CMS Tracker The Silicon Sensors for the Inner Tracker of CMS CMS Tracker and it‘s Silicon Strip Sensors Radiation.
Instrumentation: ground and noise Temperature Measurement.
Rainer Renfordt IKF Frankfurt TPC meeting 10/11December GSI Low Voltage System for the Alice TPC " Test of Wiener PL500 supply " Alternative scenario:
CELeSTA CERN LATCHUP STUDENT SATELLITE TEST BOARD DEVELOPMENT AND CHARM PRELIMINARY RESULTS Raffaello Secondo ESA/ESTEC CERN Visit - DECEMBER 9 th 2014.
IFR/LST Meeting Feb 26, 2003K. Honscheid, Ohio State University High Voltage Requirements Commercial Solutions Custom Solutions.
Tullio Grassi ATLAS–CMS Power Working Group 31 March 2010 DC-DC converters and Power Supplies requirements for CMS HCAL Phase 1 Upgrade.
Power supply planning for upgrade OT  Scintillating Fibre Wilco Vink On behalf of the SciFi group 19 May 2014.
ITOP LV power supply and cable scheme G. Visser Indiana University 3/17/2015.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Power & Voltage Plan R. Van Berg Electronics Mini-Review.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
FP420 Tracker and Timing detector Low and high voltage supply INFN/Univ. of Torino Cern meeting, Jan
FP420 Low and high voltage supply INFN/Univ. of Torino Sep
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
Developments on power transfer at CERN (DC-DC converters) Philippe Farthouat CERN.
FP420 Low voltage supply Henning E. Larsen, INFN and Risoe 19. May 2006.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
D. Nelson October 7, Serial Power Overview Presented by David Nelson
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
Status of NA62 straw electronics Webs Covers Services Readout.
18/6/03GS/ALICE Forum1 LVPS - Grounding Meeting of LVPS TF on Tuesday 17/6 Overview of TPC, TRD and TOF subsystem with F. Szoncso/TIS-GS Review of subsystems.
cm 150 cm The Al foil is large as the M3 wall  we can put 1 raw (5 chambers) or 2 raws There is an insulating material (varnish) on the.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
NA62 straw tracker DCS Straw tracker overview Bulk power supply Power supply distribution and monitoring LV + monitoring HV Temperature monitoring Gas.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
R2E Availability October 17 th 2014 ADC and Common development options G. Spiezia.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
1 Radiation worries in the cavern L.Jirdén
MUX-2010 DISCUSSION : W HAT DO WE NEED NEXT IN HEP.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
FP420 Low and high voltage supply Henning E. Larsen, INFN Feb
Mitglied der Helmholtz-Gemeinschaft PANDA MVD Slow Control Issues Harald Kleines, Forschungszentrum Jülich, ZEA-2.
FP420 Low and high voltage supply Henning E. Larsen, INFN/Univ. of torino April
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
FP420 Low and High voltage supply
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
M. Hansen, CERN S. Lusin, CMS TC / UW
Ideas and design concepts, and challenges
ALICE Muon Tracking Upgrade EDR Answers
Henning E. Larsen, INFN 12 July 2006
Evaluation and testing of advanced low-voltage power supplies
Radiation- and Magnet field- Tolerant Power Supply System
The pros and cons of in-situ testing – going beyond the test standards
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Setup for testing LHCb Inner Tracker Modules
Presentation transcript:

FP420 Low and high voltage supply INFN/Univ. of Torino July A presentation intended to stimulate the discussion on which solution is best

1) 3) 2)

1) All in tunnel -- CAEN A3009, A3486, A3540, A3801 tested up to Gy. A3501 never tested. 500 m cable too long for CAN protocol, modification of hw necessary

MPOD LV next to cryostat MPOD HV in counting room MPODs never radiation tested – Wiener optimistic and willing to test Maraton LV next to cryostat MPOD HV in counting room Customisation of Maraton necessary (low currents) Maraton tested up to 700 Gy, but limited Remore control 1) Tunnel/counting room -- Wiener

2) Alcoves/counting room -- Wiener Customisation of Maraton necessary (low currents)

3) Counting room Wide choice of supplies, lower cost, easier maintenance. High cable cost, need local rad-hard regulators

1) 3) 2)

Recommendation Recommend the solution with all but linear regulators in the counting room. Thus having 500m supply cables and linear regulators next to the front-end Linear rad-hard regulators available from Cern stores for 2V, 3.3V and +5V supplies Solution for +-12V for Gastof/QUARTIC is being investigated

All supplies in counting room: Advantages/disadvantages Best access Most reliable No radiation to sensitive electronics Uses standard non rad-tol. power modules –cheaper, spares readily available Large cable cost Difficult to test as the EMC environment is hard to predict Custom design and test of linear regulator board No remote adjustment of low-voltages

Local linear regulator to stabilize load voltage Monitor of load current by the power supply Monitor of the load voltage by sense wires and separate adc No remote adjustment of load voltage! Is that a serious problem?

Cable bundle, one station = two pockets+Quartic/Gastof

Quartic/Gastof regulators for +-12V Radhard LHC4913/7913 from Cern stores not suitable for +-12V Intersil HS-117, +12V 1.2A –Constructed with the Intersil dielectrically isolated Rad Hard Silicon Gate (RSG) process –rad-hard to 3kGy, latch-up immune –Test report: Still missing -12V candidate devices

Test of solution 3) Goal: Setup to validate supply over 500m. This requires construction of a PCB with a couple of LHC4913/7913 regulators. I assume we can borrow the necessary power supplies from either wiener or caen. use the same cable to evaluate the temperature monitor system, but again we need to borrow the module from CAEN/Wiener use the same cable to test HV supply for Si tracker but not for Quartic/Gastof. Ideally we should also test the rad-hard version of +-12V regulators for quartic/gastof but I guess it may be hard to get samples, otherwise we can use the non-rad hard equivalents. Still lacking a design for -12V Q/G supply. I don’t foresee test of Q/G HV setup. For that we would need to buy HV cable (HTC-50-2, 1300€) as we cant use the NG28

Reserve

Power Supplies: requirements LV HV No. of channels Power budget

Power Supplies Description of solution Cable cost Mod ule cost Notes LVHV Ne ar sta tio n CAEN Easy300 0 Nea r stati on CAEN Easy k€ 180k €+ 10k€  Maintenance access, radiation and SEU issues Wiener MPOD Cou ntin g roo m TBD60k€TBD  Maintenance access, radiation and SEU issues.  Need further radiation tolerance qualifications Wiener Maraton TBD95k€TBD  Maintenance access issues  No voltage tuning from remote. Al co ve Wiener Maraton TBD100k€TBD  Maintenance access issues.  Need linear regulator.  No voltage tuning from remote.  Radiation field is unclear.  QUARTIC/GASTOF's +- 12V issues Co un tin g ro o m TBD 144k€TBD  Lowest module cost.  High cable cost.  Need linear regulator.  No voltage tuning from remote.  Little or no radiation or access issue.  QUARTIC/GASTOF's +- 12V issues In tunnel, under magnets: O(10) Gy/year 0.1 SEU/day/module In alcoves at 200 m from IP: Gy/year