BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. BAE Systems C2C SWAT Project - WF32 Shield.

Slides:



Advertisements
Similar presentations
DataLogger® Product Training. Index Product Identification Product Set-up Data Logging Procedures Data Analysis Troubleshooting Jump to.
Advertisements

Club Car IQ Technical Information
Assembly Manual Mike Fortney 04/09/2004 CricketSat Receiver.
AN INTRODUCTION TO THE BTS-1000 (BERD DAWG) COMMUNICATIONS TEST SET SLIDE 1 OF 22.
Register Digital Multimeter Usage Click Register to begin the course.
RaceBot can do car race using two DC motors. Let's learn how to go forward, backward, right turn, and left turn. with practicing ' ㄱ ' shape racing, and.
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
Assembly Manual Mike Fortney 04/02/2006 CricketSat Receiver.
Colorado Space Grant Consortium Timing Circuit HW #4 Class #07 Timing Circuit HW #4 Class #07.
Switches, Pushbuttons, and LEDs Digilent Spartan 3 Board Lecture L2.1.
1 Student Hands On Training I (2007) Timing Circuit & Camera Integration Timing Circuit & Camera Integration.
DataLogger Operation - 1 DataLogger ® Operation Procedures.
BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. BAE Systems C2C SWAT Project Tutorial 1,
George Washington University DC Circuits Lab Professor Ahmadi ECE 002.
Register Digital Multimeter Usage Click Register to begin the course.
Dr. Hoganson CSIS HC11 Demo Program This is our first lab using the 68HC11 microcontroller. We will “talk” to the microcontroller from a PC, run.
BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. BAE Systems C2C SWAT Project Tutorial 2,
BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. BAE Systems C2C SWAT Project Tutorial 3,
BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. BAE Systems C2C SWAT Project Tutorial 4,
BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. BAE Systems C2C SWAT Project Test and Diagnostics.
Register Digital Multimeter Usage Click Register to begin the course.
BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. BAE Systems C2C SWAT Project Installation.
MECHANICS FOR PC SERIAL UPGRADING OF VISTAR (2010PK) IRD DEALER QUALIFICATION: 1.The Dealer’s office can be easily located by the subscribers. 2.Dealer.
Kirchhoff’s Laws. Changes from circuit in lab manual. 1. The DC voltage supply to use is +5V, not +9V as is shown in the lab manual. 2. A second circuit.
Part 1 Using the ARM board And start working with C Tutorial 5 and 6
Dean Brock, Rebecca Bruce and Susan Reiser, CCSC SE 2009 Using Arduino Material taken from Todbot blog Bionic Arduino Todbot blog Bionic ArduinoTodbot.
Silicon Labs ToolStick Development Platform
Getting started with Microsoft.NET Gadgeteer Comberton Village College Gadgeteer Club.
BTEC IT Unit 02 Lesson 09 Practical Work Briefing – P5, P6, P7
1 Applied Control Systems Technology. 2 Pin configuration Applied Control Systems.
Ladibug Document Camera DC 170 BY ART LEBEAU SOURCED FROM THE MANUFACTURERS USER GUIDE.
1.First Go to
Canon SX 130 IS User Guide Digital Design Art Level 1.
Register Digital Multimeter Usage Click Register to begin the course.
BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. BAE Systems C2C SWAT Project - WF32 Shield.
BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. BAE Systems C2C SWAT Project Extras Mar 2014.
BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. BAE Systems C2C SWAT Project - WF32 Shield.
BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. BAE Systems C2C SWAT Project - WF32 Shield.
BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. BAE Systems C2C SWAT Project - WF32 Shield.
Programming the Geiger Counter Board 1. Arduino Files Go to and download the latest Arduino.
BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. BAE Systems C2C SWAT Project – WF32 Shield.
IMetos Wireless sensor Networks. Definitions I : Radio WAP(W ireless A ccess P oint ) The WAP is the radio interface needed to command the iMetos3 radio.
Adding to your Diagnostic Station Adding thermometry The temperature module attaches to the top of the BP module. It is made up of the following two.
Ethernet I/O Set-Up This presentation will step through a typical configuration of the DVT CON-IOE. Intellect 1.0 is used for the software portion.
Experiment 4 Kirchhoff’s Laws. Changes from circuit in lab manual. 1. The DC voltage supply to use is +5V, not +9V as is shown in the lab manual. 2. A.
Important! Be sure to connect the communication cable to your computer before opening the Aqua4Plus Lite software. (Click to continue)
The following shows the steps of adding value in Octopus card. Can you put them in correct order? Motivation A Insert the Octopus card into the card slot.
Hytech / Lifeguard ® Install Tutorial © 2015 Cochran Consulting, Inc. Introduction System Overview Lifeguard D3 Connection Lifeguard Pickup Install Cochran.
Requirements Components Ready Light Status Board Orientation.
AAPT workshop W03 July 26, 2014 Saint Cloud State University, MN, USA
IOPtiMate™ OT-135P2 Technical Training – Part I System Description, Installation & Operation IOP (07)
After Construction Name: Per #:.
PostBase Automatic Feeder Component Removal Service Training
Know your Robot Electrical Parts
FTC Driver Station Setup and Operation Mike Zook 20-Sep-2016.
FlashBack-4 Training June 2014
Microprocessors Tutorial 1: Arduino Basics
FTC Driver Station Setup and Operation Mike Zook 20-Sep-2016.
Yeti 400 Reprogram SOP 5/1/2017, Yeti firmware rev. 2.0.
iSERIES PROGRAMMING/LOGGING TRAINING
Arduino and Design of Embedded Applications
Introduction to EV3Dev: Setup with Python
Raspberry Pi: External Inputs & Outputs
Laser 3000™ Operating Instructions
Body Electrical System
Module 1 – Power Supply AMC APS-PBC-60
VEXnet User's Guide.
Aeroponic Engineering and Vertical Farming
Presentation transcript:

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. BAE Systems C2C SWAT Project - WF32 Shield V2.0 Only Test and Diagnostics Sep 2015

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. The Test and Diagnostics tutorial will verify that you have correctly setup your Blackbox and that you can establish a connection to the SWAT Controller. 2 Scope

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. Test and Diagnostics > Set Up Insert the SD Card into your computer and open the SD Card Library. Open the folder “Test and Diagnostics” and run the file titled “setup”. 3 Note:Running the “setup” file updates the “SWAT_pin.cfg” and “SWATctrl.cfg” files in the SD Card Library, using the files from the “Test and Diagnostics” folder.

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. Test and Diagnostics > Step 1 Eject the SD Card from your computer and insert the SD Card into the WF32 board. 4 WF32 Board SD Card

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. Attach the battery connector to the motor shield terminal J1. It is recommended to use a splitter cable to enable the battery to provide power to the shield and the ESC. 5 Splitter Cable To Motor Shield Terminal J1 Motor Shield Note:“J1” is written next to the terminal on the motor shield Test and Diagnostics > Step 2

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. Test and Diagnostics > Step 3 On the WF32 board, ensure that jumper J15 is in the external (EXT) position to receive power from the battery. 6 Note:The UART position on jumper J15 is used when the WF32 board is connected to your computer WF32 Board EXT UART J15

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. Physically attach the WF32 board underneath the motor shield using the connecting pins. 7 Test and Diagnostics > Step 4 Note:Be careful not to bend any of the connecting pins. Motor Shield WF32

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. Test and Diagnostics > Step 5 Attach the motor shield, using the splitter cable, to the battery, to power up the board. 8 Splitter Cable To Battery To Splitter Cable Battery Note:The battery is always the last component to connect.

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. Attach the power plug from the Splitter to the motor shield J1. Attach the ESC connector to 27 (Note Brown/Black pin towards GND) 9 Test and Diagnostics > Step 6 Note: The following should be illuminated. LED D37 (11V Indicator) LED D36 (5V Indicator)

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. Test and Diagnostics > Step 7 Once the battery is connected, you should see various lights turn on (LD3, LD4, LD5 and LD6), on the WF32, indicating the battery is connected. 10 WF32 Board LD3, LD4, LD5 and LD6

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. Test and Diagnostics > Step 8 Turn on your Wi-Fi unit and connect your computer to this. Open the “SWAT Controller” on your computer (previously installed). 11 SWAT Controller

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. Test and Diagnostics > Step 9 Once the “SWAT Controller” has established a connection to the WF32, the connection status will be shown by a green dot (previously red). 12 WF32 connection

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. Test and Diagnostics > Step 10 The “SWAT Controller” will then show the Wi-Fi strength and the battery power percentage that is being used. 13 Wi-Fi strength Power Percentage

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. Test and Diagnostics > Step 11 The input displays will now be tested. 14 Input displays Note:The “Fakesen2” is only a display test and does not correlate to any data.

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. Test and Diagnostics > Step 12 On the WF32, press Button 3 (BTN3). As Button 3 is pressed, the display for “Button 3” on the “SWAT Controller” will be shown as “ON”. 15 WF32 Board Button 3 (BTN3) Button 3: ON

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. Test and Diagnostics > Step 13 On the WF32, turn up and down (rotate) the potentiometer. As done, the “Trimpot” will display the values, ranging from 0% to 100%. 16 Trimpot: Potentiometer WF32 Board Potentiometer

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. Test and Diagnostics > Step 14 Once testing is complete, disconnect the battery first from the splitter cable. 17 Note:The battery is always the first component to connect. Splitter Cable From Battery From Splitter Cable Battery

BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. Next Module Please continue to Tutorial 1, ESC and Servo.pptx 18