Systems Analysis And Design MIST 4620 Fall 2002 Professor: Dale Goodhue.

Slides:



Advertisements
Similar presentations
DFD Examples Yong Choi BPA CSUB.
Advertisements

Data Flow Diagramming Rules Processes –a process must have at least one input –a process must have at least one output –a process name (except for the.
Systems Development Environment
1 Pertemuan > >. 2 Learning Outcomes Pada akhir pertemuan ini, diharapkan mahasiswa akan mampu : Mahasiswa dapat membuat diagram / skema scope dan desain.
1 Information Systems Development (ISD) Systems Development Life Cycle Overview of Analysis Phase Overview of Design Phase CP2236: Information Systems.
Systems Analysis & IT Project Management Pepper. System Life Cycle BirthDeathDevelopmentProduction.
Chapter 1 Assuming the Role of the Systems Analyst
Chapter 8 Information Systems Development & Acquisition
Lecture 13 Revision IMS Systems Analysis and Design.
1 IS 4420 Database Fundamentals Chapter 2: Database Development Process Leon Chen.
PowerPoint Presentation for Dennis & Haley Wixom, Systems Analysis and Design Copyright 2000 © John Wiley & Sons, Inc. All rights reserved. Slide 1 Key.
Systems Development Life Cycle
Chapter 1 Assuming the Role of the Systems Analyst
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Tuesday, November 26, 1999 MIS Lecture Notes1 Administrative Details HW #7, Project Assignment #1 due HW #7 solution set, Project Assignment 3 solution.
The database development process
Information Systems Development : Overview. Information systems development practice Concept and role of a systems development methodology Approaches.
6 Systems Analysis and Design in a Changing World, Fourth Edition.
Chapter 6: The Traditional Approach to Requirements
System Analysis Overview Document functional requirements by creating models Two concepts help identify functional requirements in the traditional approach.
Continuation From Chapter From Chapter 1
DFD examples.
2 Approaches to Requierements Engineering Reference: Systems Analysis and Design in a Changing World, 3 rd Edition, chapter 2 and chapter 6.
1 SA Capstone Requirements and Design Week 1 SYST36367 Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
Lecture Outline 11 The Development of Information Systems Chapter 8 page 390+
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
INFORMATION SYSTEM APPLICATIONS System Development Life Cycle.
1 Our Expertise and Commitment – Driving your Success An Introduction to Transformation Offering November 18, 2013 Offices in Boston, New York and Northern.
Managing the development and purchase of information systems (Part 1)
Data Flow Diagrams A structured analysis technique that employs a set of visual representations of the data that moves through the organization, the paths.
8-1 Chapter 8 Information Systems Development & Acquisition.
Sheridancollege.ca SA Capstone Requirements and Design Week 1 1.
Chapter 14 Information System Development
Prepared by Afra`a Sayah. Introduction. Weekly Tasks. Plane Phase. Analysis Phase. Design Phase. Report Rules. Conclusion. 2.
CISB594 – Business Intelligence
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Chapter 1 Assuming the Role of the Systems Analyst Systems Analysis and Design Kendall & Kendall Sixth Edition.
Information Systems Engineering. Lecture Outline Information Systems Architecture Information System Architecture components Information Engineering Phases.
BEST GROUP CONSULTANTS Lesson Department Information System.
1 6 Systems Analysis and Design in a Changing World, 2 nd Edition, Satzinger, Jackson, & Burd Chapter 6 The Traditional Approach to Requirements.
Software Development Life Cycle by A.Surasit Samaisut Copyrights : All Rights Reserved.
Outline Identifying the right projects to implement (continued) Systems Analysis Approaches –automation, process improvement, process reengineering Example.
Workforce Scheduling Release 5.0 for Windows Implementation Overview OWS Development Team.
Small Business Information Systems Professor Barry Floyd
6 Systems Analysis and Design in a Changing World, Fourth Edition.
Consider that you will be presenting for an internal review in your own consulting firm. We will critique your work and make suggestions for improvements.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
Department Vendor Information Vendor Information Issue Purchase Order Make Payment Request Open P.O. File Receipt of Goods File Available Vendors P.O.
After class… Reach out to your GP1 group Setup time to meet Get started on GP1 asap!
Final Review Systems Analysis and Design in a Changing World, 4th Edition 1 Final Review u Chapters 1-6, 8-10, 13, 14, 15 u Multiple choice, short answer,
Chapter 1 Assuming the Role of the Systems Analyst.
Systems Development Life Cycle
DFD Examples Yong Choi BPA CSUB.
THE VALUE (SUPPLY) CHAIN STRETCHES FROM THE BEGINNING OF YOUR SUPPLIER’S SUPPLY CHAIN THROUGH ALL OF YOUR PROCESSES THAT CREATE VALUE FOR YOUR CUSTOMERS.
Management Movie Management System Customers Databases Vendors
Chapter 6 The Traditional Approach to Requirements.
REQUIREMENTS ANALYSIS
Business System Development
The Development of Information Systems Chapter 8 page 348+
Data Solutions- Karm Upadhyay Zoheb Khan Swati Shukla
Data Solutions- Karm Upadhyay Zoheb Khan Swati Shukla
Proposals & Project Specifications
DFD Examples Yong Choi BPA CSUB.
DFD Examples Yong Choi BPA CSUB.
Systems Development Life Cycle
Information Systems Development (ISD) Systems Development Life Cycle
UNIT No- III- Leverging Information System ( Investing strategy )
Chapter 8 Information Systems Development & Acquisition
DFD Examples Yong Choi BPA CSUB.
Presentation transcript:

Systems Analysis And Design MIST 4620 Fall 2002 Professor: Dale Goodhue

Business Challenges Management Information Technology Organization Business ProcessesBusiness Solutions

Project Identification and Selection Initiation and Planning Analysis Gathering Info Process Modeling Data Modeling Design System, Architecture Interface, Data Storage Program Implementation Construction Testing Installation The Systems Design Life Cycle

Project Identification and Selection Initiation and Planning Analysis Gathering Info Process Modeling Data Modeling Design System, Architecture Interface, Data Storage Program Implementation Construction Testing Installation The Systems Design Life Cycle Ch 4-7 Events, DFDs, ERDs, Logical DBs Ch 2,3 Ch 8-13 Logic Modeling, Prog Design, Forms, Interfaces, Physical DBs, Ch Coding, Testing, Training, Change Mgmt

Project Identification and Selection Initiation and Planning Analysis Gathering Info Process Modeling Data Modeling Design System, Architecture Interface, Data Storage Program Implementation Construction Testing Installation Skills Needed During The Systems Design Life Cycle Interpersonal Skills Analytical Skills Management Skills Technical Skills

Department Vendor Information Vendor Information Issue Purchase Order Make Payment Request Open P.O. File Receipt of Goods File Available Vendors P.O. Bill of Lading Signed BoL Invoice R. of G. Check Receive Goods Notification of receipt P.O. R. of G. Budget/Acct Budget Availability Bud Commit Expenditure A High Level Data Flow Diagram of the Purchasing Process

Department Vendor Department Receipt of Goods File R. of G. Receive Goods Notification of receipt Bill of Lading Signed Bill of Lading

Vendor Department Make Payment Open P.O. File Receipt of Goods File Invoice Check P.O. R. of G. Budget/Acct Information Expenditure

Deliverable #1, Sept 18 engagement letter System Profile --Business Context --Problem or Opportunity --Proposed Solution --Hoped-for Benefits Initial Scope Chosen and why project roles and timeline fact finding techniques presentation 1 (3 Slides Only!) Deliverable #2, Oct 18 data flow diagrams entity relationship diag. event table pseudo-code (selected) presentation 2. Deliverable #3, Dec 9 prototype user manual dialogue diagram screen layouts/report design costs and benefits recommendation presentation 3

Presentations for Deliverable 1 Consider this a presentation to your customer, in which you hope to convince them that there is a business reason to do a first level analysis and prototype development project. You have 12 minutes and 4 slides! Your presentation should include (not necessarily in this order): The Business Context (with numbers!) What business is this? How big? Who are their customers, competitors, challenges, strategic niche? Business Problem or Opportunity. (What is the problem or opportunity that your system will address?) What decision will the system make, based on what external info and what internal info? Proposed Solution and Hoped-for Benefits Remember: In a real situation, you are asking the customer to put up real dollars (and real management time) to pursue this possible system. Convince them this is worth it!

Consider that you will be presenting for an internal review in your own consulting firm. We will critique your work and make suggestions for improvements. (Strongly) Suggested Components for Presentation 2 Quick summary of the business context (with numbers!), the business problem,and the proposed solution and benefits. Context diagram of proposed solution. Event Table. Must correspond to the context diagram and the Level 0. Level 0 DFD. Must correspond to the event table. Level 1 DFDs for the key events. Data Stores must correspond to ERD. ERD with attributes indicated (even if just listed to the side of entities). Tell us the extent to which you are automating versus reengineering. Hand out to the class: ERD; Level 0 DFD; Level 1 DFD for the most interesting events.

(Strongly) Suggested Components for Presentation 3 Quick summary of the business context (with numbers!), the business problem,and the proposed solution and benefits Level 0 DFD for system, events to be prototyped highlighted. Description of the prototype to be demonstrated (supporting a subset of the major events) Demonstrate the prototype (make it interesting; tell a story) Discussion of the costs and benefits of this system. (Be hard nosed make some estimate of the benefits (hard and soft). If it doesn’t look worth the cost, say so. Recommendation to the client. Hand out to the class: screen image of Data Model (from Access); Level 0 and level 1 DFD for most interesting event that you prototyped. You DO need to turn in: executive summary(!), individual journals, user manual (so literate person could operate your prototype), etc. You Don’t need to turn in: user manual overview, how to get help

Gearing Up for the Project Go to the course web site: Explore a bit. What can you find there? Download the Project Description and Deliverables Download the Team Contract and Code of Contact Read them! Team Contract and Code of Conduct are Due Aug 28

Required for Friday August 23 Determine Group Membership (Group Name?) List on a clean sheet: names, in alphabetical order Identify potential project sites Set time of meeting for Team Contract We will take team photos (stand in alphabetical order)