1 Benefit Cost Analysis Typically used for public projects The goal is to determine if benefits exceed costs: Benefit / Cost Ratio > 1 The goal is NOT.

Slides:



Advertisements
Similar presentations
TRADABLE PERMITS IN WATERWAY TRANSPORT JIM FAWCETT ECONOMIST GALVESTON DISTRICT.
Advertisements

Cost-Benefit Analysis
Asst. Prof. Dr. Mahmut Ali GÖKÇE, Izmir University of Economics Spring, 2007 (c) 2001 Contemporary Engineering Economics 1 Benefit-Cost.
Chapter 3 Program Management and Project Evaluation Professor Hossein Saiedian McGraw-Hill Education ISBN
Engineering Economics in Canada Chapter 10 Public Sector Decision Making.
Transforming Transportation: The Role of Intelligent Transportation Systems Matthew J. Schiemer, PE August 18, 2011.
1 Lecture 1 INTRODUCTION TO MODULE 2 Module 2 Module 2 Principles of evaluation Principles of evaluation Depreciation Depreciation Income tax Income tax.
Economic Analysis in Transportation Systems CE 7640: Fall 2002 Prof. Tapan K. Datta, Ph.D., P.E.
CTC 475 Review Evaluating alternatives Evaluating alternatives Ranking Method (PW, AW, FW) Ranking Method (PW, AW, FW) Incremental Method (PW, AW, FW,
1 MER 439 Design of Thermal Fluid Systems Engineering Economics 3. Comparing Alternatives Professor Wilk Winter 2007.
Contemporary Engineering Economics, 4 th edition, © 2007 Benefit-Cost Ratio Lecture No. 66 Chapter 16 Contemporary Engineering Economics Copyright © 2006.
CTC 475 Review Comparing Alternatives Comparing Alternatives Ranking (PW,AW,FW) Ranking (PW,AW,FW) Incremental (PW,AW,FW,IRR,ERR,SIR) Incremental (PW,AW,FW,IRR,ERR,SIR)
(c) 2001 Contemporary Engineering Economics 1 Chapter 17 Economic Analysis in the Public Sector Framework of Benefit- Cost Analysis Valuation of Benefits.
VI-Economic Evaluation of Facility Investments 1. Project Life Cycle and Economic Feasibility 2.Basic Concepts of Economic Evaluation 3.Costs and Benefits.
1 Chapter 10 Introduction to Government Finance. 2 Federal, State, and Local Revenue Sources: Taxes: Payroll Income (Corporate and Personal) Property.
Presented By: Jeff Bagdade Traffic Engineer AAA Michigan Road Improvement Demonstration Program Economic Analyses Presented By: Jeff Bagdade Traffic Engineer.
1 Benefit Cost Analysis Typically used for public projects The goal is to determine if benefits exceed costs: Benefit / Cost Ratio > 1 The goal is NOT.
Lecture No. 54 Chapter 16 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Chapter 8 Annual Equivalent Worth Analysis
EVALUATING PROJECTS WITH THE BENEFIT / COST RATIO METHOD
Benefit/Cost Analysis Lecture slides to accompany
Creating a Win-Win Relationship Presented by: John McCarthy GO Airport Express.
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Airport Shuttle Agreements Presented by: John McCarthy GO Airport Express.
Notes for Chapter 6 ECON Benefit cost analysis Many definitions and perspectives  Determines optimal policy from the perspective of either government.
Economic Evaluation of Pavement Alternatives CEE 320 Steve Muench 9/12/ The majority roads are public facilities built with tax money to serve the.
1 Chapter 12 Benefit-Cost Analysis Framework of Benefit- Cost Analysis Evaluation of Benefits and Costs Benefit-Cost Ratios.
Lectures in Engineering Economy Prof. Corrado lo Storto DIEG, Dept. of Economics and Engineering Management School of Engineering, University of Naples.
Comparing Projects Using Time Value of Money
4-1 Model Input Dollar Value  Dollar value of time  Accident costs  Fuel costs  Emission costs.
COST BENEFIT ANALYSIS- PUBLIC SECTOR INVESTMENTS Lucky Yona.
CHAPTER 11 EVALUATING PROJECTS WITH THE BENEFIT / COST RATIO METHOD $$$ $
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Benefit Cost Ratio Course Outline 8.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Benefit-Cost Ratio Lecture No. 53.
Net Present Worth Review NPW can compare mutually exclusive projects or prioritize investments (using Incremental Analysis) Criteria: Choose highest NPW.
Page 1 Reducing Emissions, Increasing Efficiency, Maximizing Profits Part 2: Is Recovery Profitable? p Savings associated with pressure reduction p Costs.
1 Reviewing Complex Flow Perpetuity If there is a mix of recurring and non-recurring or one-time cash flows that must be capitalized for perpetuity: 1.)
Maintenance & Rehabilitation Strategies Lecture 5.
Cost/Benefit Analysis Review Cost/Benefit can done using NPW or EAW, pick one! (choose whichever method is easiest for the problem statement) Criteria:
© 2012 by McGraw-Hill All Rights Reserved 9-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 9 Benefit/Cost.
Maximizing Fees ASSOCIATION OF INDIANA COUNTIES 2008 ANNUAL CONFERNCE Vevay, IN September 24, 2008.
1 Reviewing Complex Flow Perpetuity If there is a mix of recurring and non-recurring or one-time cash flows that must be capitalized for perpetuity: 1.)
Economic Impact of an Incident In Highway Scene Management.
Utah Research Benefits Value of Research Taskforce July 29, 2015 Cameron Kergaye Utah Department of Transportation.
1 Benefit Cost Analysis Typically used for public projects The goal is to determine if benefits exceed costs: Benefit / Cost Ratio > 1 The goal is NOT.
Cost-Benefit Analysis and Government Investments
Briefing for Transportation Finance Panel Nov 23, 2015 Economic Analysis Reports: 1.I-84 Viaduct in Hartford 2.I-84/Rt8 Mixmaster in Waterbury 3.New Haven.
Benefit/Cost Ratios, Internal rate of Return, valuation, and depreciation.
Water Resources Planning and Management Daene C. McKinney Economic Analysis of Alternative Water Plans: 1. Benefit/Cost Analysis.
1 1. Order alternatives from lowest to highest initial investment. 2. Let Alternative A 0 (do nothing) be considered the current best. 3. Consider next.
Alternative Selection Construction Engineering 221 Economic Analysis.
Engineering Economics Exam 2 Review. CASH FLOW DIAGRAM Yes -- you do need the Sticks!!
Chapter 6 Annual Equivalent Worth Criterion. Chapter 6 Annual Equivalence Analysis  Annual equivalent criterion  Applying annual worth analysis  Mutually.
Chapter 12: Benefit-cost analysis Framework of benefit- cost analysis Valuation of benefits & costs Benefit-cost ratios Incremental B-C analysis.
Economic Analysis in the Public Sector Benefit/Cost Analysis.
City of Tucson: Financial Sustainability Plan
TM 661 Chapter 5 Solutions 1 5.4) Consider the net cash flows and salvage values for each of alternatives 1 and 2 having lives 3 and 5 years respectively.
Researchers: Charlaine V. Reyes Dyeor Kristy M. Balisi Advisers:
Project Feasibility Analysis
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
PE 3 Economic Analysis alternative 1 – Stake Body Truck Purchase
Contemporary Engineering Economics
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
CTC 475 Review Evaluating alternatives Ranking Method (PW, AW, FW)
Cost/Benefit Analysis Review
Applying Annual Worth Analysis
Presentation transcript:

1 Benefit Cost Analysis Typically used for public projects The goal is to determine if benefits exceed costs: Benefit / Cost Ratio > 1 The goal is NOT to maximize B/C Ratio. Interest rates used are typically lower than those used by businesses. Typically 4% - 8% (6.5% is typical) OMB requires 10% (except water proj.)

2 Benefit Cost Analysis The challenge is to quantify the benefits and costs. The equation… B/C = (Benefits – Disbenefits) to the public (Costs) to sponsoring agency You can use NPW, EAW, even NFW – whichever is easier in a particular problem – Hint: Choose EAW or Capitalized Cost to avoid equal lifetime issues!

3 Benefit Cost Analysis Steps: 1. Define the planning horizon. 2. Specify the Discount Rate (MARR) to be used. 3. Develop the cost and benefit-disbenefit profiles in monetary terms. 4. Compare the benefits to costs using a specified measure of worth, such as annual equivalent or present worth. 5. If the B/C ratio is: > 1project is justified = 1barely justified – political < 1not justified 6. Repeat steps 3 – 5 for alternative viewpoints

4 Cost-Benefit Profiles Primary Benefits – (Users) measurable: Prevention of costs / savings from implementation Time savings from implementation Secondary Benefits – (Users) difficult to measure: Environment conservation / improvement Pain & suffering avoidance Disbenefits – (Users) quantified: Time lost due to requirements User fees for Operation & Maintenance Costs – (Sponsor): First costs & Salvage Sponsor Operation & Maintenance (– Revenue) Operation fees paid by users (+ Revenue)

5 Quantification Examples Benefits due to reduction in deaths: Number of deaths avoided Average income stream of victims Benefits due to reduction in property damage: Number of incidents Average property damage per incident Disbenefits due to user fees: Average number of users Average fee charged Disbenefits due to delay time: Number affected Average delay duration Average wage rate of patrons Costs (+ Revenues due to user fees): Average number of users Average fee charged

6 Vehicle Inspection Program Ex. State inspects motor vehicles as part of licensing system. Vehicles not passing inspection must be repaired prior to license renewal. Primary Benefits (Users): Reduction in deaths due to accidents Reduction in property damage due to accidents Secondary Benefits (Users): Pollution avoidance costs Savings to accident victims families Avoidance of pain & suffering Disbenefits (Users): Cost of inspection fees Opportunity cost of time to bring car to inspection Opportunity cost of time waiting for inspection Vehicle usage costs for inspection process

7 Vehicle Inspection Program Ex. Sponsor Costs (State): Capital recovery costs of inspection facilities Operating costs of inspectors & admin. staff Sponsor Revenues (State): Inspection revenues (user fees) Quantifying Benefits: Deaths avoided 304 victims of fatal accidents avoided Income stream lost: $ per victim Property damage avoided total accidents avoided annually 63% of accidents are property only Average property damage: $1 845 per accident Total Benefits to Users:$ / year

8 Vehicle Inspection Program Ex. Quantifying Disbenefits: Cost of inspection fees vehicles inspected annually $5 fee per inspection Opportunity cost of time to bring vehicle to inspection vehicles inspected annually 1.02 hours of inspection travel per car (round trip) Average wage rate: $14.02 per hour Opportunity cost of time waiting for inspection Average waiting time: 9 minutes (0.15 hr) vehicles inspected annually Average wage rate: $14.02 per hour Vehicle usage costs for inspection process vehicles inspected annually Operating cost per mile: $0.35 Average round trip to station: 20 miles Total Disbenefits to Users:$ / year

9 Vehicle Inspection Program Ex. Quantifying Sponsor Costs: Capital recovery of facilities costs Similar facilities annual cost: $ per yr Operating costs for inspectors & admin Annual operating costs:$ per year Revenue from inspection fees vehicles inspected annually $5 fee per inspection Total Costs to Sponsor:$ / year IS IT WORTH IT? B/C = B – D = – = 2.29 C Economically Justified, Politically …