UCLA group meeting1/9 CSC update – my random summary Another good week for LHC: L=0.9E32 reached (nearly the goal of 1E32 in 2010) Test run with 50 ns.

Slides:



Advertisements
Similar presentations
Experimental Particle Physics PHYS6011 Joel Goldstein, RAL 1.Introduction & Accelerators 2.Particle Interactions and Detectors (2) 3.Collider Experiments.
Advertisements

Level-1 Trigger CMS Week, Brussels 14 Sep C.-E. Wulz Deputy Trigger Project Manager Institute of High Energy Physics, Vienna Prepared with slides/material.
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
June 6 th, 2011 N. Cartiglia 1 “Measurement of the pp inelastic cross section using pile-up events with the CMS detector” How to use pile-up.
1 Measurement of f D + via D +   + Sheldon Stone, Syracuse University  D o D o, D o  K -  + K-K- K+K+ ++  K-K- K+K+ “I charm you, by my once-commended.
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
UCSB Top Quark Analyses On CDF J.Lamb, C.Hill, J. Incandela, C. Mills DOE Visit January 20, 2004.
5-Jan-2010 XEB Meeting at CERN 1 Debriefing from first data: CSC muons n Lessons learned u LHC is a quiet machine  CSC HV can remain on at all times,
An offline look at TIF data David Stuart UC Santa Barbara May 2, 2007.
CMS Alignment and Calibration Yuriy Pakhotin on behalf of CMS Collaboration.
1 Towards an Upgrade TDR: LHCb Computing workshop May 2015 Introduction to Upgrade Computing Session Peter Clarke Many peoples ideas Vava, Conor,
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
Coincidence analysis in ANTARES: Potassium-40 and muons  Brief overview of ANTARES experiment  Potassium-40 calibration technique  Adjacent floor coincidences.
W properties AT CDF J. E. Garcia INFN Pisa. Outline Corfu Summer Institute Corfu Summer Institute September 10 th 2 1.CDF detector 2.W cross section measurements.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Introduction Ricardo Gonçalo (RHUL) Higgs Weekly Meeting – 19 April 2012.
Cover for special hardcover edition of Phys. Lett. B featuring CMS+ATLAS Higgs results 31 July 2012G. Rakness (UCLA)1 The articles were submitted today.
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.
Ratio of Three over Two Jet Cross Sections: Update 36 pb -1 P.Kokkas, I.Papadopoulos, C.Fountas University of Ioannina, Greece QCD High p T Meeting 17.
Since last meeting, no collisions LHC has been working towards increasing the intensity in single bunches towards achieving the 2011 integrated luminosity.
Various Wrote Run Coordination job description – Found this exercise to be useful as CSC Operations guy, so decided to do it as Deputy Run Coordinator…
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
Draft of talk to be given in Madrid: CSC Operations Summary Greg Rakness University of California, Los Angeles CMS Run Coordination Workshop CIEMAT, Madrid.
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
UCLA group meeting1/11 CSC update – a 2-week summary Status of CMS at LHC: L=2*10 32 reached 25-Oct-2010 (=the original goal for 2011) and 42 pb -1 collected.
28 July 2006 CERN REU Status Report 1 Lindsey Gray, University of Florida RCT Trigger Supervisor and Database Project Status Lindsey Gray Advisors: Dr.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
Status of RPC trigger analysis and Muon Trigger efficiencies for W-> μν study By Archana Sharma, Suman B. Beri Panjab University Chandigarh India-CMS Meeting.
DPF2000, 8/9-12/00 p. 1Richard E. Hughes, The Ohio State UniversityHiggs Searches in Run II at CDF Prospects for Higgs Searches at CDF in Run II DPF2000.
LHCb: Xmas 2010 Tara Shears, On behalf of the LHCb group.
UCLA meeting, 2012 Hauser1 Since last week Technical Coordination workshop Gave talk on CSC upgrades New 2013 timeline – ME4/2 seems okay, ME1/1 is tight,
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
CSC High Pileup Sumulations Vadim Khotilovich Alexei Safonov Texas A&M University June 15, 2009.
Upgrade Result Approval: CMS and Tracker Frank and Andrea 21/5/14Pixel phase 1 MB1.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
Search for High-Mass Resonances in e + e - Jia Liu Madelyne Greene, Lana Muniz, Jane Nachtman Goal for the summer Searching for new particle Z’ --- a massive.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
Susan Burke DØ/University of Arizona DPF 2006 Measurement of the top pair production cross section at DØ using dilepton and lepton + track events Susan.
A Low Voltage Problem Seen by TMB Greg Rakness University of California, Los Angeles CSC Operations + DPG Meeting 28 July 2010.
Recall: CFEB inefficiencies Collision Run June 2010G. Rakness (UCLA)1 validation/run135445/ExpressPhysics/Site/PNGS/hORecHits.png.
Penny Kasper Fermilab Heavy Quarkonium Workshop 21 June Upsilon production DØ Penny Kasper Fermilab (DØ collaboration) 29 June 2006 Heavy Quarkonium.
TeV Muon Reconstruction Vladimir Palichik JINR, Dubna NEC’2007 Varna, September 10-17, 2007.
Living Long At the LHC G. WATTS (UW/SEATTLE/MARSEILLE) WG3: EXOTIC HIGGS FERMILAB MAY 21, 2015.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
Eduardo RodriguesLHCb Collaboration Week, 26th November Studies of Generator-level Selection Eduardo Rodrigues, CERN I. Proposal II. Procedure III.
Observation of Exclusive Charmonium Production and    in pp Collisions at CDF II James Pinfold University of Alberta For the CDF Collaboration.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Introduction 08/11/2007 Higgs WG – Trigger meeting Ricardo Gonçalo, RHUL.
David Lange Lawrence Livermore National Laboratory
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
Sundry LHC Machine Development starts 19 June –Original plan to have 90m comm. next week was torpedoed by private discussions between spokesperson and.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
904 Status Recall last Group Meeting…
UCLA Meeting: Notes TMB upgrade for ME1/1 issues
Topic A In case anyone is interested in ALCT 3.3v
Global PID MICE CM43 29/10/15 Celeste Pidcott University of Warwick
Status of Full Simulation for Muon Trigger at SLHC
CSC Organization in 2013 Jay Hauser To be updated at
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
CSC Trigger Primitives Test Beam Studies
Search for Narrow Resonance Decaying to Muon Pairs in 2.3 fb-1
The np -> d p0 reaction measured with g11 data
Update on POLA-01 measurements in Catania
Susan Burke, University of Arizona
Plans for the 2004 CSC Beam Test
Presentation transcript:

UCLA group meeting1/9 CSC update – my random summary Another good week for LHC: L=0.9E32 reached (nearly the goal of 1E32 in 2010) Test run with 50 ns bunch spacing “soon”? Possibilities up to 3.5E33 (!) and 4.2 fb -1 (!) in Running could be extended into 2012 See the following for discovery of Higgs background

UCLA group meeting2/9 4-mu event! Masses and lack of other activity are consistent with a Z 0 Z 0   +  -  +  - event This is the main background to the high-mass Higgs search Went unnoticed by “exciting event selection” tools for 2 weeks, ahem

UCLA group meeting3/9 CSC – other good news CSC efficiencies verified to be significantly higher in DT- CSC overlap region after technical stop fixes muon L1 pre- and post-firing shown to be at ~1% level in DTs and few per mill in CSC (e.g. Chris study) Neutrons start to show up in data (see Greg talk) CEOs plus daily CSC validations shifts appear sufficient

UCLA group meeting4/9 CSC update – issues I Muon slow particle trigger idea presented  Nobody in GMT group can write firmware for it anymore  Calorimeter slow particle group is somewhat interested Neutron run taken at L~2E31 Clear evidence of extra hits seen in TMB counter rates Would like to see the actual rates, neutron cross-sections per chamber type CFEB muonic timing  Width of the distribution not obviously narrowed… to be investigated

UCLA group meeting5/9 CSC update – issues II 2ns tweaks can improve ALCT timing substantially: From Chris’ talk to L1 trigger DPG 23-Sept- 2010

UCLA group meeting6/9 CSC update – issues III TMB 3.3v supply droop below 3.135v spec Is it corroding fuses? Investigating TMBs taken from collision hall, gold- plated fuses (tomorrow Greg, Misha) CERN does elemental analysis with electron microscope (EDS, 1 week) Is it corroding CRB-backplane connections? Full characterization of ~75 drooping TMBs by Clare by Weds. Ops meeting?

UCLA group meeting7/9 CSC update – issues IV CSC efficiencies: not a very clear picture Certainly much better than before Technical Stop Hardware (CSC-TF) has seen many changes, so keep it unchanged for the rest of this year Numerous conflicting analyses - suggest to: Define a sample of well-identified but unbiased muons as denominator Break down by every trigger & offline selection level Show eta-phi plot of losses Have high statistics Must compare to correct Monte Carlo simulation version to understand properly Algorithms were always tuned so MC performs well!

UCLA group meeting8/9 CSC update – issues V High luminosity (3.5E32?) and 50ns bunch spacing issues Wide readout windows again lead to missing (CLCT) or duplicate (CFEB, ALCT) CSC data Any other issues? Anyone? CSC daily monitoring shifts need streamlining The work seems to have begun

UCLA group meeting9/9 CSC update – issues VI Overall CSC group structure Probably heading towards Ops, DPG, and Upgrade deputies by ~December CSC Detector Performance Group (DPG) Muon DT has proposed fully merging CSC, DT, and RPC groups Not much enthusiasm by CSC collaborators Current meetings work pretty well, ~40 people Establish the sub-structure? Good to organize high-priority activities Good to know who to ask about specific issues Bad if people feel locked into the structure

UCLA group meeting10/9 Stuff mentioned before Don’t need to go through these again today

UCLA group meeting11/9 CSC nagging concerns I Changes to data structure ALCT timing information from Chris  DIGIs? Mini-scope etc. in TMB Allowed now for future CMSSW version 3.9 ?? Improved documentation General muon DPG detector performance article? Might naturally break into 3 papers, but preferably not. CSC synchronization article Twikis, especially on timing, online changes Storage and tracking of firmware versions ALCT, TMB, CCB, MPC, DDU, DCC, CSCTF, VCC, etc.

UCLA group meeting12/9 CSC nagging concerns II Triggers & datasets: where do all of these go? Single high-Pt triggers and datasets Onia triggers and datasets Single low-Pt (e.g. b physics) triggers and datasets Halo muons CSC activity triggers Everyone sees a “piece” of the puzzle… Would like to assemble known information… Are we missing anything? Need to improve DIGI information on timing, e.g. CSC anode timing?

UCLA group meeting13/9 CSC upgrade Technical Proposal muon section in decent shape, maybe more verbiage on physics justification David S. and Taylor to work on actual justification during Fall Upgrade ME4/2: Panels via CERN – try for sole-source procurement ME4/2 electronics – make at least one endcap of CFEBs to decouple schedule from ME1/1?