F CDF Detector Operations Rob Roser Fermilab April 15, 2005.

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

WAO Travis Shrey RHIC Machine Specialist Collider-Accelerator Dept Brookhaven National Laboratory 10/30/2014.
CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
CDF CDF Operations Steve Hahn February 7, 2005 All Experimenters ’ Meeting.
Bob Wagner, ANL Dec 15, 2005 CDF Weekly Meeting
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
Silicon Tracking for Forward Electron Identification at CDF David Stuart, UC Santa Barbara Oct 30, 2002 David Stuart, UC Santa Barbara Oct 30, 2002.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Tevatron BPM Upgrade Project Manager Overview Stephen Wolbers Tev BPM Technology Choice Review December 16, 2003.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
F Run II Experiments and the Grid Amber Boehnlein Fermilab September 16, 2005.
L3 Filtering: status and plans D  Computing Review Meeting: 9 th May 2002 Terry Wyatt, on behalf of the L3 Algorithms group. For more details of current.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
CDF perspectives and Computing needs KISTI, Dec 5 th 2008 DongHee Kim.
Detector Operations Support: Muon Campus Peter Wilson PPD Engineering Dept Heads March 10, 2014.
Designing a HEP Experiment Control System, Lessons to be Learned From 10 Years Evolution and Operation of the DELPHI Experiment. André Augustinus 8 February.
Scientific Highlights : CDF Experiment 1.Introduction 2.CDF Run-II detector 3.Phyiscs highlights B Physics, Top, Higgs, … to be continued by Rob October.
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
CDF Detector Operations Budget and Resource Planning Rob Roser IFC Meeting October 17,
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
P5 recommendation on Tevatron running Report of June 8 meeting FNAL.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Infrastructure Upgrades Rick Finnegan April 22, 2008.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
CDF Performance and Improvements: Young-Kee Kim (U.Chicago), Sept , P5 Meeting0 CDF Performance and Improvements Detectors, Triggers, Offline, and.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Fermilab Users Meeting June R.J. Tesarek Fermilab CDF 2002 Toward Physics Richard J. Tesarek Fermilab For the CDF Collaboration.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Online Monitoring for the CDF Run II Experiment T.Arisawa, D.Hirschbuehl, K.Ikado, K.Maeshima, H.Stadie, G.Veramendi, W.Wagner, H.Wenzel, M.Worcester MAR.
DoE Review June 6, 2000 Cost Estimate  New Cost Estimate u Manpower Costs (Op. SWF) u Equipment Costs (Eq. M&S) u Contingency  Conclusions Mike Tuts.
Roma, Riunione CSN1: Maggio 2004F. Bedeschi, INFN-Pisa 1/13 CDF  Stato del Tevatron  Stato del rivelatore  Upgrades in corso  Richieste finanziarie.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
1 FY05 Shutdown at CDF Rob Roser for the CDF Operations Group January 18, 2004.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
H. MatisSTAR Inner Silicon Tracking Detector Review – July 8, SSD software and hardware maintainability Howard Matis.
HPS Summary Costs, Manpower, Schedule John Jaros Searching for a New Gauge Boson at JLab Jefferson Laboratory September 20, 2010.
Terry Wyatt, University of Manchester, UK 1 Manpower - Part 2 AvailabilityAvailability –Survey –Comparison of Needs and Availability –Caveats/to-do list.
Kaori Maeshima Fermilab Jan. 12, University Evolution: Search in High Mass Dilepton Channel in CDF Pre Run I Run 1A, Run 1B, and Run II......
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
1 Run IIb Event Builder upgrade Director’s Review Jan Steve TetherRon RechenmacherMarkus KluteBruce Knuteson MITFNAL/CDMITMIT RonSteve Motivation.
Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004.
News and Related Issues Ted & Kirsten May 27, 2005 TDWG News since last meeting (April 29th) Organization Issues: how to improve communication Future Plans:
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
TDAQ and L1Calo and Chamonix (Personal Impressions) 3 Mar2010 Norman Gee.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
14 Aug. 08DOE Review John Huth Future Harvard ATLAS Plans John Huth.
WBS 1.05 Commissioning Detector Scope, Cost & Schedule Sven Vahsen University of Hawaii.
Richard J. Tesarek Fermilab For the CDF Collaboration
LHC Science Goals & Objectives
TDAQ Phase-II kick-off CERN background information
Accelerator Operations Department Readiness (Part 2)
HCAL M&O-B Budget CMS Finance Board
Kevin Burkett Harvard University June 12, 2001
GlueX Electronics Review Jefferson Lab July 23-24, 2003
CLAS12 Timing Calibration
HL-LHC upgrade at IPHC news
Presentation transcript:

f CDF Detector Operations Rob Roser Fermilab April 15, 2005

f 2IFC Spring 05 Since we last met…. Survived Lengthy Shutdown –Installed new Preradiator system –Completed EM Timing installation on central calorimeter –Performed lots of detector maintenance –Isolated SVX and COT inert regions such that the silicon can be kept cold during COT work –Reworked the support structure of low beta quad magnets in our collision hall Commissioned new Level 2 decision system and it is now the default for data taking Replaced 25% of COT TDC’s with modified ones (fast clear)

f April 15, 20053IFC Spring 05 Since we last met…. Sped up TDC readout time dramatically Survived 4 kicker prefires Operating the detector smoothly now with average efficiency of ~85% Lowered silicon operating temperature to - 10C Accelerator is performing well! CDF is still an exciting and vibrant place to work at! We are having fun!

f Accelerator Performance

f April 15, 20055IFC Spring 05 Integrated Lum to Date (FY05)

f April 15, 20056IFC Spring 05 Peak Luminosity Recycler is already having a significant impact!

f April 15, 20057IFC Spring 05 Accelerator Performance

f CDF Performance

f April 15, 20059IFC Spring 05 Luminosity Delivered/Recorded

f April 15, IFC Spring 05 Data Taking Efficiency A good measure of how well the CDF experiment is operating Goal is to operate consistently at high data taking efficiency Sources of inefficiency include: –Trigger dead time and readout; this is an explicit choice each experiment makes (average ~5% over the duration of a store) –Start/End Stores (4%) –Beam conditions (high losses, etc) –Problems (detector, DAQ, or trigger, ~5%/store typ)

f April 15, IFC Spring 05 Data Taking Efficiency

f April 15, IFC Spring 05 CDF Central Tracker Aging BEFOREAFTER CDF was experiencing aging (significant (25%) reduction in gain) in its central outer tracker during FY04 Addition of a gas recirculation system and the addition of ~100ppm of oxygen to the 50/50 Ar-Eth mixture has solved the problem. COT back to “as new” condition

f April 15, IFC Spring 05 CDF Central Tracker Aging (2) What was the impact of this aging experience on CDF and CDF data? Until we understood the problem, we ran the COT in a compromised mode to protect it from further damage. SL1 and 2 (those closest to the beam) were turned off The gain in SL 3,4,5 was reduced by 40-50% We operated that way from Friday February until May and accumulated ~100pb of data in that condition This data is analyzable. Some groups have used it already. Others are now incorporating it into their analyses as well. In times of crisis – the collaboration really pulls together and works on the problem

f April 15, IFC Spring 05 CDF Preradiator Installation Replaced existing system in order to get finer segmentation – required for higher luminosities Completed during the FY04 shutdown New system is fully operational

f April 15, IFC Spring 05 CDF Silicon -- Current Status Powered Good (Errors < 1%) Bad (not used) With Errors( > 1 %)

f April 15, IFC Spring 05 Kicker Prefires Random discharge of one of 10 kicker thyratrons while beam is in the machine. –CDF silicon has received in excess of 150 rad per incident and has suffered permanent damage to the silicon. –Electronics damage sometimes observed in other systems can be fixed Mitigation -- Trying to minimize the risk, but it will never be zero. –Installed additional collimators to shield experiment –Monitor accelerator conditions closely Calendar Year# of Prefires ?

f April 15, IFC Spring 05 Damage to SVX3D Chips

f April 15, IFC Spring 05 SVX and SVT SVX detector is crucial for CDF Secondary Vertex Trigger (SVT) for Level2 SVT uses r-phi information only SVT requires 4/5 working ladders in a wedge At the moment 3 dead wedges for SVT, 16 wedges are 4/5 F Z

f Budgets (the exciting stuff!)

f April 15, IFC Spring 05 Budgets – M&S + G&V In the out years (FY08, FY09), less monies available for spares In FY05, ~1.2M of CDF’s budget is required to buy cryogens, gas, maintenance, computer licensing… Only $500k is discretionary

f April 15, IFC Spring 05 FNAL’s contribution to 2005 M&S Budget CategoryExplanationFY05 Actual Computing On-line DAQ, Level 3, Licensing maintenance, slow controls… $400k Consumables Argon, Ethane, LN2, He, Alcohol $400k T&M Electrical, Rigging, HVAC Personnel $15k Infrastructure Maint HVAC, Compressors, Engines, Pumps… $135k General Operating Office Supplies, phones, pagers, vehicles, misc. catch-all $100k Mech Support Pipes, Fittings, bolts, tools, safety $100k Run IIB L2 Trigger, Scaffolding, etc. $150k Total$1,300k $1300k is not sufficient to operate CDF – Counting on foreign contributions

f April 15, IFC Spring 05 Foreign Contributions to M&S At the last IFC, we agreed upon a $$$ amount per FTE. I have begun to invoice funding agencies based upon this agreement These invoices are for FY04 effort. Thus far I expect –Japan ~50,000k yen –Helsinki, UK, Spain have contributed via the above tax –Others should still expect to be invoiced – delays typically from not knowing the proper FTE count Any comments complaints from the way this is being handled?

f Staffing CDF for the Duration…

f April 15, IFC Spring 05 Collaboration Support Universities provide the lion’s share of the manpower needed to operate the experiment –16 physicists on shift every day –60 experts on call daily via pagers MOU’s have been written between each member institution and the experiment to clarify the commitment of each. –Initial set expiring –Current set in place through FY07

f April 15, IFC Spring 05 MOU’s (1) Original MOU’s were established in 2001 These MOU’s detail each institution’s commitment to –Personnel Commitments (Names and FTE’s) –Experiment Operations –Detector sub system / electronics Maintenance –Run II Upgrade work –Offline Responsibilities –MOU’s do not discuss physics analysis / related topics MOU’s are currently being renegotiated for the period FY05-FY07 –Arranging for longer term commitments at this time has been difficult due to funding uncertainties

f April 15, IFC Spring 05 MOU’s (2) CDF has had preliminary MOU discussions with 53 of its 58 institutions –Next step will be to redistribute tasks that have been dropped by some institutions Process is expected to take 6 months Will start negotiations in Jan. 06 Finding strong support from most to stay involved through at least FY07

f April 15, IFC Spring 05 Lab Support (Engineering and Technical) Technical team consists of a project engineer, a process systems engineer, and 13 mechanical/electrical technicians –We are running “lean” with this size crew. –We are not doing everything we want to do Resources are assigned via a matrix organization – not in the line management of CDF Operations Dept. 4 technicians provide professional 24x7 coverage of the process systems and insure the safe operation of the detector and provide rapid response to problems Because we are such a small group, we are not 100% self-sufficient. We require additional lab resources during times of detector access

f April 15, IFC Spring 05 Resource Availability Direct (though not necessarily linear) correlation between resources and data taking efficiency. CDF can operate with less resources, but at the cost of reduced efficiency We have been operating for almost 5 years now and have been pushed hard to be lean and efficient –M&S and Staffing Levels are not what they were even a few years ago much less what they were in Run I We can operate better and more efficiently but it takes more $$$. –We know what to do – we just can’t afford to do it and so we do the best we can…

f Challenge Ahead…

f April 15, IFC Spring 05 Operations Challenge FY05 – 1e32FY06 – 2.2e32FY07 – 2.8e32 Instantaneous Initial Luminosity

f April 15, IFC Spring 05 Challenge Ahead… Dealing with the factor of >2 increase in luminosity still expected –Our current trigger table can be made to work with “reasonable” dead time up to 1.5e32. –Beyond that, we can no longer have an all inclusive trigger – we have to make some physics decisions –Established a committee to prioritize the physics –Building new trigger hardware (ready this summer) adding Stereo track information into both L1 and L2 triggers, new L2 decision crate, new TDC readout…. new event builder and Consumer server logger

f April 15, IFC Spring 05 Maintaining Staff CDF is dependent upon manpower for two specific needs –Maintain detailed understanding of each of the systems –Warm bodies to play an operational role I would like an increased presence in operations from the foreign institutions Silicon will always be labor intensive!

f April 15, IFC Spring 05 Summary CDF is operating well. –Typical data taking efficiencies in the mid 80%’s. –All detectors are still in excellent condition We can operate better – but it takes more $$$. –Engineering to address cumbersome interfaces –Additional professional help on shift –Upgrading equipment that continues to be a source of downtime The upcoming years will be an exciting time – with increasing statistical precision, we are anxious to analyze the data. CDF is committed to operating well through 2009

f April 15, IFC Spring 05 Associate Head, Detector Infrastructure Stefano Moccia - Steve Hahn Detector and Computing Operations Head Rob Roser Deputy Head Willis Sakumoto Deputy Head Rick Snider Associate Head, Detector Subsystems Operations Manager Bob Wagner Aron Soha Sungwon Lee Building Manager Craig Olson Safety Coordinator Dee Hahn Admin. Support Nancy Michael Associate Head, Computer Infrastructure Data Handling Farms CAF Data Bases Process Systems Bill Noe(Leader) Dean Becker Warren Bowman Cutchlow Cahill Steve Gordon Jim Humbert Jim Loskot Bruce Vollmer Electrical and Mechanical Dervin Allen(Leader) Roberto Davila Lew Morris Wayne Walden George Wyatt Slow Controls Steve Hahn(Leader) JJ Schmidt JC Yun Daily/Weekly Ops Shift Crews Sci-Co Aces(2) Co Silicon M. Stanitzky RS Lu COT David Ambrose Morris Binkley Aseet Muhkerjee Muons Guram Chlachidze Phil Schlabach Monitoring/Valid Kaori Maeshima Calorimeter Larry Nodulman Willis Sakumoto Calibrations Trigger L1/L2 Cheng Ju Lin Peter Wittich Online Database William Badgett TOF Gerry Bauer Mathew Jones Fumihiko Ukegawa DAQ Frank Chlebana William Badgett Level 3 Gilles Lentdecker CSL ? Associate Head, Detector Operations Masa Tanaka CLC Jaco Konigsberg Sasha Suhkanov Forward Koji Terashi DQM Mario Martinez Trigger Dataset Working Group Kirsten Tollefson Kevin Pitts Radiation Monitoring Rick Tesarek