NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005.

Slides:



Advertisements
Similar presentations
OFFICE OF SCIENCE 1 Large Synoptic Survey Telescope News since the February update Astronomy & Astrophysics Advisory Committee Telecon May 2012 Fred Borcherding/Nigel.
Advertisements

Directorate for Mathematical and Physical Sciences Facilities and Cyberinfrastructure April 2, 2014 Advisory Committee for Cyberinfrastructure Wayne Van.
NSF Regional Grants Conference St. Louis, MO
National Science Foundation & Directorate for Mathematical and Physical Sciences Celeste M. Rohlfing Head, Office of Multidisciplinary Activities
Conversation with ACCORD on GSMT 21 January 2005 Michael S. Turner, Assistant Director Directorate for Mathematical & Physics Sciences National Science.
AAS Congressional Visits Day Tom Statler & Maria Womack March 12, 2013.
NSF Program Update Astronomy & Astrophysics Advisory Committee 13 February 2006.
Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.
1 The Thirty-Meter Telescope (TMT) Richard Ellis, Steele Professor and California Institute of Technology TMT Board member Michael Bolte, Director, University.
Division of Astronomical Sciences Program Update AAAC 11 February 2008.
Keck Observatory and The System: Astro2010 Activities Mike Bolte, Shri Kulkarni, Taft Armandroff Keck Strategic Planning Discussions September 18, 2009.
OIR C OMMITTEE S TATUS R EPORT 2 nd face-to-face meeting Oct , 2014 Beckman Center of the National Academies Irvine, CA.
Program Status Physics of the Cosmos Program (PCOS) Cosmic Origins Program (COR) M. Ahmed Briefing to the PhysPAG January 8, 2012 AAS Meeting, Austin Texas.
1 1 AST Committee of Visitors February 2011 National Solar Observatory Overview Craig Foltz Program Officer NSO.
Sept 29-30, 2005 Cambridge, MA 1 Grand Challenges Workshop for Computer Systems Software Brett D. Fleisch Program Director National Science Foundation.
The FY 2009 Budget Thomas N. Cooley, NSF Council of Colleges of Arts and Sciences March 13, 2008.
AAAC Meeting February, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort at a.
Activities of and Prospective Issues before the Committee on Astronomy and Astrophysics Report by David Spergel, CAA Co-Chair Disclaimer: These slides.
NSF Program Update Astronomy and Astrophysics Advisory Committee February 15, 2005.
NSF Program Update Astronomy & Astrophysics Advisory Committee 11 May 2006.
NSF Program Update Astronomy and Astrophysics Advisory Committee May 16, 2005.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
A Roadmap forNationalOIRFacilities AAAC May 2005 OIR Long Range Planning Committee Document for submission to NSF AST and CAA May 2005.
AAAC Jim Ulvestad February 10, Outline Brief Facility and Science News Budget Outlook & Astro2010 Status Meta-issues 2 02/10/2012.
NSF Division of Astronomical Sciences AAAC October 15-16, 2009 Craig Foltz.
NSF Update AAAC 8 February Update Topics FY2007 Budget Situation FY2007 Budget Situation FY2008 Request FY2008 Request Senior Review Status and.
NSF Town Meeting AASCalgary 6 June Update Topics NSF personnel news and AST realignment NSF personnel news and AST realignment FY2006 Current Plan.
Brinkman Report: Setting Priorities for Large Facility Projects Sponsored by the NSF Key Issues Raised in Report Transparency of process (next slide) Involvement.
NSF Program Update Astronomy & Astrophysics Advisory Committee 12 October 2006.
Astro2010 Response MPS/AST COV 7 February, 2011 Jim Ulvestad.
N. RadziwillEVLA NSF Mid-Project Report May 11-12, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
AST Supported Programs for Astronomical Instrumentation Division of Astronomical Sciences Program Officers: Andrew Clegg, Jeff Pier, Gary Schmidt.
TMT.PMO.PRE REL011 Thirty Meter Telescope Background and Status.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
The Advanced Technology Solar Telescope from the Perspective of the National Science Foundation.
Morris Aizenman Senior Scientist Directorate for Mathematical & Physical Sciences National Science Foundation Physics and Engineering Sciences Committee.
National Science Foundation Division of Astronomical Sciences Facility/Large Project Oversight and Role of Managing Organization Committee of Visitors.
1 Large Synoptic Survey Telescope Status Update for AAAC October 13, 2011 Nigel Sharp Division of Astronomical Sciences, NSF Kathy Turner Office of High.
“From the Ground Up: Balancing the NSF Astronomy Program” Senior Review Major Recommendations November 2006 Implications for GSMT.
Report from NSF/MPS Tony Chan Assistant Director Directorate for Math & Physical Sciences Fermi Lab Users Meeting June 7, 2007.
LIGO-G M Summary Remarks: Management of LIGO Gary Sanders California Institute of Technology NRC Committee on Organization and Management of Research.
NSF Division of Astronomical Sciences Senior Review Update Astronomy and Astrophysics Advisory Committee 11 October 2005.
U.S. Department of Energy’s Office of Science 20 th Meeting of the IEA Large Tokamak ExCo, May th Meeting of the IEA Poloidal Divertor ExCo, May.
AST Update Astronomy and Astrophysics Advisory Committee 10 May 2007.
1 ASTRONET Coordinating strategic planning for European Astronomy.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array FPGA Spectrometer.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
The View from NSF Very Wide Field Surveys in the Light of Astro2010 Space Telescope Science Institute June Nigel Sharp 1.
National Radio Astronomy Observatory NRAO and SKA Fred K. Y. Lo.
AAAC Jim Ulvestad December 1, Divestment issues  “Divestment,” in the parlance of the Portfolio Review, implies removal of a telescope from the.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
The Square Kilometre Array Dr. Minh Huynh (International Centre for Radio Astronomy Research and SKA Program Development Office) Deputy International SKA.
ALMA Town Meeting Introduction K. Y. Lo Director of NRAO.
Division of Astronomical Sciences Update (Life After the Senior Review) Astronomy and Astrophysics Advisory Committee 11 October 2007.
1 LSST Town Hall 227 th meeting of the AAS 1/7/2016 Pat Eliason, LSSTC Executive Office Pat Osmer, LSSTC Senior Advisor.
Senior Review of NSF Facilities NOAO Users Committee October 4, 2005.
Division of Astronomical Sciences Senior Review Astronomy and Astrophysics Advisory Committee 10 May 2007.
Giant Magellan Telescope Project Status and Relationship with the NSF Astronomy and Astrophysics Advisory Committee February 8, 2007 Patrick McCarthy -
Mid-Scale Projects Vernon Pankonin Team Leader. Mid-Scale Projects Programmatic Characteristics Not a formal funding program. Collection of proposals.
Jim Ulvestad Division Director, AST May 6, 2011 Division of Astronomical Sciences.
GSMT SWG Meeting November, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort.
DESpec in the landscape of large spectrographic surveys Craig Hogan University of Chicago and Fermilab.
LSST CORPORATION Patricia Eliason LSSTC Executive Officer Belgrade, Serbia 2016.
Large Synoptic Survey Telescope
NSF-NAC Jim Ulvestad, Division Director, MPS/AST
Astronomy and Astrophysics Advisory Committee Oct 11, 2005
Mark McKinnon EVLA Project Manager
Preliminary Project Execution Plan
Presentation transcript:

NSF Program Update Astronomy and Astrophysics Advisory Committee Oct 11, 2005

Status of Decadal Survey Recommendations Small Initiatives: –National Virtual Observatory (NVO) - Framework development funded; discussion with NASA planning long-term support through joint solicitation, currently in legal review; Cyber funds in ’06 and beyond?

Status of Decadal Survey Recommendations Update Moderate Initiatives: –Advanced Technology Solar Telescope (ATST) Advanced to “Readiness” at last NSB meeting –VERITAS - Awaiting outcome of NEPA and NHPA processes Construction re-start ~December at earliest

Status of Decadal Survey Recommendations Major Initiatives: –Atacama Large Millimeter Array (ALMA) – update tomorrow – Giant Segmented Mirror Telescope (GSMT) – joint technology development program proposal funding in process – Large Synoptic Survey Telescope (LSST) - $14M development award in place.

Status of Quarks to Cosmos recommendations Update – CMB Research Task Force – Final report today – Interagency initiative on Physics of the Universe

Physics of the Universe Interagency Plan Update Highest priority, ready – LSST – CMB Research Task Force – Final report this afternoon – Dark Energy Task Force formed under AAAC and HEPAP Status report tomorrow

GSMT Planning National Optical Astronomy Observatory (NOAO) Science Working Group has formulated a detailed science case. National Optical Astronomy Observatory (NOAO) Science Working Group has formulated a detailed science case. Consortium formed to undertake an extensive technology development and site characterization effort. Consortium formed to undertake an extensive technology development and site characterization effort. Would result in a public-private partnership with private funds supporting approximately 50% of the $70M estimated cost; proposal to NSF for the remaining 50%. Public funds would support community effort in several major groups. Would result in a public-private partnership with private funds supporting approximately 50% of the $70M estimated cost; proposal to NSF for the remaining 50%. Public funds would support community effort in several major groups. Current estimate is that this effort would take five to seven years. Proposal funding has begun. Current estimate is that this effort would take five to seven years. Proposal funding has begun. NSF has met with consortium and with individual Boards to discuss timing and are continuing a constructive dialogue NSF has met with consortium and with individual Boards to discuss timing and are continuing a constructive dialogue Funds in FY2005 appropriation limited; similar for FY2006; Planned growth awaits outcome of Senior Review Funds in FY2005 appropriation limited; similar for FY2006; Planned growth awaits outcome of Senior Review

LSST Planning National Optical Astronomy Observatory (NOAO) Science Working Group formulated detailed science case. National Optical Astronomy Observatory (NOAO) Science Working Group formulated detailed science case. LSST Corporation established. LSST Corporation established. Pan-STARRS underway in Hawaii with DoD funding. No operations money at all and insufficient resources for software. Pan-STARRS underway in Hawaii with DoD funding. No operations money at all and insufficient resources for software. NSF provided $1.3M in FY03 for detector development for LSST Camera; NOAO has been funding telescope design at roughly $1.7M/year. NSF provided $1.3M in FY03 for detector development for LSST Camera; NOAO has been funding telescope design at roughly $1.7M/year. DOE labs have expressed strong interest in participating in the project through provision of the camera. DOE science budget a problem? DOE labs have expressed strong interest in participating in the project through provision of the camera. DOE science budget a problem? Technology development program ($14M) underway in FY2005, FY2006 (Physics of the Universe) Technology development program ($14M) underway in FY2005, FY2006 (Physics of the Universe)

The ATST Project The Advanced Technology Solar Telescope

Improvements over current state of the art: Resolution – ~7X improvement Light grasp – 10X improvement (solar physics is actually photon starved in some experiments) Technical Specifications: 4-m, off-axis Gregorian (all reflective), alt-az mount. Integrated adaptive optics. Hybrid enclosure with thermal control and dust mitigation. Wavelength sensitivity from microns (near- UV through thermal infrared). Field of view: 3 arcminutes (5 arcminute goal). Angular resolution < 0.03 arcsecond. Polarization accuracy < 0.01%. ATST will be the world’s flagship facility for ground-based solar physics observation and the first large US solar telescope constructed in the past 30 years. The Telescope

Marching toward MREFC ATST team had planned aggressively for an FY06 start of construction. This will not happen. Additional funding will be required to pay marching army and produce final design (note that current MREFC rules preclude funding design from MREFC). AST will fund through FY06 (FY07). The next steps:  ATST and AST craft development plan for FY06-7.  Site selection complete – environmental impact study underway.  Brought to MREFC panel in March 2005; advanced to readiness 9/05  In-depth cost review endorsed costing models completed  Attempt to address critical path items – early procurement of primary mirror possible through AFOSR partnership  Let contracts for final design to design and engineering firms.  Complete Project Execution Plan.  Final design review in early  Construction begins in FY2008?

Planning (Activity Accelerating) O/IR roadmap team convened by NOAO has posted report O/IR roadmap team convened by NOAO has posted report Radio/mm/sub-mm convened by AUI has posted report Radio/mm/sub-mm convened by AUI has posted report CMB Roadmap – this meeting CMB Roadmap – this meeting Dark Energy Task Force – end of 2005 Dark Energy Task Force – end of 2005

Building a Sustainable Program Promises to be transformational Promises to be transformational Built on underpinnings of community involvement in planning, advice, advocacy and “formal” agency recognition of those structures Built on underpinnings of community involvement in planning, advice, advocacy and “formal” agency recognition of those structures Realistic (ambitious is OK, but….) Realistic (ambitious is OK, but….) Supportable by the astronomical community Supportable by the astronomical community Supported by the astronomical community (over the long haul – now 15 years) Supported by the astronomical community (over the long haul – now 15 years) Appeals to broader scientific community Appeals to broader scientific community “Understands” and meshes with agency processes (helping to shape them if possible) “Understands” and meshes with agency processes (helping to shape them if possible)

Near Term Intermediate Term Horizon Facilities Gemini GSMT EVLA I VLA GBT LOFAR EVLA Phase II LSST SKA OWL? LOI? CHARA ALMA CARMA VLA GBT LOFAR LSST GSMT NAIC ATST

NSF and AST Developments New Deputy Director – Dr. Kathie Olsen New Deputy Director – Dr. Kathie Olsen  NSF program officer, Deputy Div Dir  NASA Chief Scientist  OSTP Deputy Director for Science New Positions in AST New Positions in AST  Two facilities/large projects managers  Additional grants program rotator  Additional program officer for ESM (upgrade)  Upgraded administrative position – finance and project support

Operating budgets and grant increments to realize the Decadal Survey recommendations ___________________________________________

Astronomy Division Budget - FY2005

Facilities - $119.1 M National Optical Astronomy Observatory (NOAO) National Solar Observatory (NSO) Gemini Observatory National Radio Astronomy Observatory (NRAO) National Astronomy & Ionosphere Center (NAIC) University Radio Observatories $24.1 M $10.6 M (excludes TSIP, AODP) $15.5 M $47.0 M $10.5 M $11.3 M

Astronomy Division Budget - FY2005 Astronomy Research & Instrumentation - $75.4 M Astronomy & Astrophysics Research Grants (AAG) Particle Astrophysics Education & Special Programs (ESP)  CAREER, REU, Postdoctoral fellowships Advanced Technologies & Instrumentation (ATI)  Technology Development & Design for future facilities Electromagnetic Spectrum Management (ESM) Science & Technology Centers (STC)  Center for Adaptive Optics (CfAO) NSF/MPS Priorities and programs  e.g. Cyberinfrastructure, Math Sciences

AST Budget FY

Astronomy Division Budget Growth Annual budget has grown by 60% since 2000 ($73 M) But with $52M in directed appropriations in FY $32M to NRAO - $4M to NAIC - $4M to NOAO - $5M to ‘grants’ - $7M to instrumentation Unable to plan for the increase and limited discretion over its use. Growth has stopped (FY2005 budget down by $2M from FY2004)

Astronomy Division Budget Growth Observatory budgets FY

How can we afford it? Proposals and studies will sharpen cost Proposals and studies will sharpen cost Planning will provide phasing, decision points, down-selects Planning will provide phasing, decision points, down-selects Overall plan must meet fiscal reality Overall plan must meet fiscal reality How? How?