Present Status of EPICS Development at the 3GeV Proton Beam Transport Facility Control System in J-PARC JAERI Motoki OiTetuya KaiSinichiro Meigo Sinichi.

Slides:



Advertisements
Similar presentations
2013 Apr.30-May.03 Shuei EPICS Collaboration Meeting 2013 Spring 1 Acquisition of Long Waveform using Yokogawa SL1000 Shuei YAMADA KEK / J-PARC.
Advertisements

1 IOC for upgrading BPM DAQ software WANG,Jian ( 王坚 ) Univ. of Sci. & Tech. of China.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda,
Development of a Linux- based small-size controller using PoE technology T. Masuda, T. Fukui, R. Tanaka SPring-8 ICALEPCS2005, Oct , Geneva, Switzerland.
Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE Tracker KEK Mar. 30, 2005.
Stephanie Allison LCLS Integration with SLC October 12, 2004 Integration with SLC LCLS Facility Advisory Committee Oct 12, 2004 Introduction.
EPICS on TPS RF System Yu-Hang Lin Radio Frequency Group NSRRC.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy P0 Feedback Project: Merging EPICS with FPGA’s Nicholas.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
1 A PC/Linux-based Control System with EPICS for RFGTB S. Araki, K. Hirano, J. Odagiri, T.T. Nakamura and N. Terunuma High Energy Research Accelerator.
Mother Board MOTHER BOARD Holds CPU, memory, PCI bays, etc.
Development of EPICS Embedded Image Processing System Takashi Obina, Jun-ichi Odagiri, Ryota Takai KEK, Accelerator Laboratory.
BPM DAQ for KEK Linac EPICS IOC using WindowsXP-based Oscilloscope for BPM DAQ System in KEK e-/e+ Linac Masanori Satoh (KEK Linac) June 13-16, 2011 EPICS.
B.A. (Mahayana Studies) Introduction to Computer Science November March The Motherboard A look at the brains of the computer, the.
APS BPM and power supply applications on micro-IOCs W. Eric Norum
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
① ③ ⑤ ④ ④ ⑥ 1. E – Podium : General ① ② ② ③ ④ ⑤ ⑥ ( E-Podium basic Structure ) 1. Mechanical : Steel Body, ABS Plastic Sliding Cover, Door (Locking Type)
K.Furukawa, Feb Controls Activity at KEK Controls Activities at KEK Issues for ILC Kazuro Furukawa, KEK.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
UCN-nEDM DAQ DAQ and Slow Control L.Lee 1 July 3, 2013.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View.
Beam diagnostics control for J-PARC LINAC Guobao SHEN J-PARC Center Japan Atomic Energy Agency Mar
EPICS at APS in June.2006, n.kami, KEK J-PARC Status N. Kamikubota, KEK and J-PARC Control members * Try to enhance updates in the last 1 year.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
LCLS Undulator Positioning Control System Shifu Xu, Joseph Xu, Josh Stein Control Group, AES/APS, ANL June 15, 2006.
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
Detectors and read-out DetectorNo. of ch.Read-out method Device candidates CsI(Tl)768Flash ADCCOPPER + 65 MHz FADC FINESSE Active Polarimeter600 x 12 x.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
Status of EPICS at KEK Tatsuro NAKAMURA KEK Jun
ArgonneBeamTest_ ppt1 Argonne Beam Test preparation Tsunefumi Mizuno Tuneyoshi Kamae
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
EPICS Collaboration Meeting, Dec.2004, Tokai, by N.Kamikubota, KEK miniEPICS N.Kamikubota, J.Odagiri, G.Shen, N.Yamamoto, K.Furukawa and T.Katoh KEK.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
Converting PROSCAN CS to EPICS Status Damir Anicic, Paul Scherrer Institute, Villigen, Switzerland For EPICS collaboration meeting 2008, Shanghai,
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 EPICS IOC Embedded on PLC for TPS Pulse Magnet Power Supply Control Chun-Yi Wu TPS Control.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
1 Current Status of The Control System for J-PARC Accelerator Complex Hiroshi YOSHIKAWA J-PARC Center at KEK/JAEA October 16, 2007 ICALEPCS2007 at Knoxville.
1. EPICS IOC on CompactRIO EPICS Collaboration Meeting Fall 2011.
Shinasol Enterprise Co,. Ltd. Phone) Fax)
Sep. 17, 2002BESIII Review Meeting BESIII DAQ System BESIII Review Meeting IHEP · Beijing · China Sep , 2002.
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
Stephen Norum LCLS Oct. 12, LCLS Machine Protection System Outline Overview of interim MPS Update on the interim MPS.
Connecting LabVIEW to EPICS network
Data transfer performance of SRS (J-PARC E16 Experiment) YUHEI MORINO RIKEN Nishina Center 1.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
1 BROOKHAVEN SCIENCE ASSOCIATES Open-Source Distributed Deterministic Device Control Larry Doolittle Alex Ratti Bob Dalesio.
Raw Status Update Chips & Fabrics James Psota M.I.T. Computer Architecture Workshop 9/19/03.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
ULTRA meeting: Turin th Jan 2002 Gino. IASF. PA. CNR. IT 1 I A S F Sez.Palermo ULTRA U v L ight T ransmission and R eflection in A tmosphere.
Magnet Low Current PS Upgrade Kristi Luchini,Sandeep Babel, Till Straumann, Mitch D’Ewart, Briant Lam, Dave MacNair May 19, 2016 VME to Emedded Industrial.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Outline: Introduction Architecture Future.
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
“Implementation and Initial Commissioning of KSTAR Integrated Control System,” Mikyung Park NFRC, KOREA The 6 th IAEA Technical Meeting,
Development Plan for Reliable Card-size IOC N. Kamikubota and S.Yamada, J-PARC/KEK May 2015 in MSU, kami, KEK/J-PARC.
Current Status of IPM-Linac Control System
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
ATF/ATF2 Control System
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Status of Fast Controller EPICS Supports for ITER Project
Overview 1. Inside a PC 2. The Motherboard 3. RAM the 'brains' 4. ROM
EPICS status and future at KEK Control Group / Commissioning Group e-/e+ Injector Linac, KEK, Japan Masanori Satoh.
Present Status of EPICS Development at the 3GeV Proton Beam Transport Facility Control System in J-PARC JAERI Motoki Oi Tetuya Kai Sinichiro Meigo Sinichi.
LCLS Machine Protection System
Presentation transcript:

Present Status of EPICS Development at the 3GeV Proton Beam Transport Facility Control System in J-PARC JAERI Motoki OiTetuya KaiSinichiro Meigo Sinichi SakaiHidetaka KinoshitaKenji Sakai Masanori Kaminaga

Contents  Outline of 3NBT monitor system  Goal of 3NBT EPICS system  About CC/NET  Data Read & archive performance test  Channel access data missing and Tick frequency  Profile monitor test in KEK  Summary

3GeV Proton Beam Transport Facility(3NBT) 3NBT Material & Life science Facility (MLF) 50GeV PS Experimental Area Beam loss : ~1W/m Length : 310m Magnet : 108 Proton monitor : 89

・ Monitor all of the proton beam monitors at 25Hz ・ Archive all of proton beam monitor data with data tag ・ Control and monitor the beam line components (Magnet power supply, vacuum, etc.) ・ Joint 3NBT to CCR and MLF control with EPICS network Goal of 3NBT EPICS system

Outline of 3NBT Monitor system EPICS IOC EPICS OPI Data Archiver Profile Monitor Loss MonitorHalo Monitor Current Monitor ADC CC/NET EPICS IOC CAMAC modules CC/NET: CAMAC controller CCR EPICS OPI 3NBT Control MLF EPICS IOC EPICS OPI Total 1100 data DAQ at 25Hz LAN Data flow

PC104Plus Single Board Computer Interface: PCI and CAMAC CPU:Crusoe500MHz Memory : 310MB Main Drive: Compact Flush 1GB Network : 100Mbps Ethernet OS : 2.4 kernel Linux What is CC/NET TRIG-IN BUSY-OUT Ethernet RBG OUT PS/2 USB

DAQ mode of CC/NET CC/NET have three DAQ mode Single modeProgrammed Dynamic Memory I/O mode Access mode SmallSmallLarge LowMiddleFast HighLowMiddle Over head DAQ Speed CPU load Pipeline method used in PIO and DMA mode

EPICS DAQ test sequence START Channel ArchiverEPICS IOC Data Archive Channel Access NIM module CAMAC module Linux WS CC/NET EPICS IOC ADC Repeat at 25Hz Clock generator Gate generator Base clock Gate signal Trig signal : delay 200 nsec CAMAC DAQ Max 368 data Max 23 ADC EPICS Channel Archiver 2.1 2

Data Taking Change the NELM / Record and examine CC/NET-EPICS DAQ performance test 16ch ADC x 23 slot = 368 data / CAMAC module 368 data / waveform is not reasonable. 64 data / Profile monitor 4 data / Halo monitor 4 data / Loss monitor 64 data is reasonable

Data Read & Archive performance For small Number of Element, PIO mode is the better CPU load DAQ time

Data missing in Channel Access CC/NET EPICS IOC Linux WS Channel Archiver Linux WS EPICS IOC Data Missing 0%Data Missing ~1% CCR, MLF EPICS IOC In the channel access between EPICS IOC to EPICS IOC, we got data missing. As a cause of data missing, I expect Linux tick frequency. Default tick frequency is 100 Hz. DAQ frequency is 25 Hz. These are near in order. Change Linux tick 1000 Hz Compare Data missing ratio

Tick and DAQ frequency DAQTick (Hz)100Hz1000Hz 1Hz0.1%0.1% 10Hz0.2% 0.2% 25Hz0.8% 0.2% 33Hz0.7% 0.2% 50Hz0.6% 0.2% PIO modeWaveform 368 element Channel Access Data missing CC/NET to Linux IOC CA performance is a little bit improved. This CA result is not perfect but enough for monitoring with I/O display

Profile Monitor Test in KEK 3NBT line transports 1 MW power proton beam, we have to develop long life profile monitor. SiC wire type profile monitor is developed. Profile monitor performance is tested in KEK proton beam dump line.

Proton Energy : 500 MeV Proton current : 182x10 10 ppb Frequency : 0.45 Hz Beam port : Beam dump line to Beam dump from KEK-PS KEK NML Beam Dump Profile monitor Beam dump to KENS NML Beam dump

Profile monitor test component INV AMP Data ArchiverMEDM Prototype profile monitor ADC CC/NET EPICS IOC Linux WS CAMAC H:16 V:16 wires SiC clad tungsten wire  100  m Oscilloscope Signal check Profile monitoring 32ch

Horizontal Channel No ADC count MEDM window Vertical Inv AMP ADC EPICS IOC x32ch Raw signal Results Successfully get proton beam profile with SiC wire profile monitor!!

Summary ・ EPICS for 3NBT control system is under construction ・ Data archive at 25Hz from CAMAC-CC/NET to Channel archiver on Linux WS is successful, but data transport among EPICS IOC has still data missing. ・ 25Hz DAQ data taking becomes better with changing the linux tick to 1000Hz. ・ SiC wire proton beam profile monitor test was succeeded.

Future plan ・ Improve the EPICS data missing problem. ・ PLC (FA-M3) data I/O operation test. ・ Design 3NBT OPI display. ・ Design and test the DAQ and data archive system with full scale system.