Hall A DAQ meeting January 12 th 2015. Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus.

Slides:



Advertisements
Similar presentations
Trigger & DAQ Ole Hansen SBS Collaboration Meeting 19 March 2010.
Advertisements

Compton integrating method Beam test summary PREX/Happex Collaboration Meeting Alexandre Camsonne.
Update on GEM Activities for the 12 GeV Program in Hall A at JLab
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
GlueX Collaboration Meeting June 3-5, GeV Trigger Electronics R. Chris Cuevas 1.Hardware Status  Production Updates 2.DAq and Trigger Testing 
GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
Hall A Gmp / DVCS Fall preparation September 16 th 2014 Hall A meeting Alexandre Camsonne 1.
Outline Experiments Setup and DAQ configuration Fastbus for SBS: performance and status GEn/GMn - trigger and DAQ GEp - trigger and DAQ GEM readout Outline.
Hall A 12 GeV DVCS Status report December 16th 2013 Hall A collaboration meeting Alexandre Camsonne.
 Brief status update of DAQ/Trigger production hardware  Firmware development for HPS application  CLAS12 CTP ‘upgrade’ notes  Summary Status of the.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
Hall A meeting October 15 th 2013 Alexandre Camsonne.
Beamline - Harp stepper motor controller cards, software – in process, Javier - Dispersive and non-dispersive measurement capability? - Ninth dipole, Doug.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Jin Huang M.I.T. For Transversity Collaboration Meeting Sept 24, JLab.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, JLab.
Solid SIDIS DAQ Solid collaboration meeting June 2 nd /3 rd 2011 Alexandre Camsonne.
1 Trigger and DAQ for SoLID SIDIS Programs Yi Qiang Jefferson Lab for SoLID-SIDIS Collaboration Meeting 3/25/2011.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Yi Qiang May 11,  The last week of E and E  Finished the productions with 3-pass and 2- pass beam with abundant statistics.  BigBite.
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
David Abbott - Jefferson Lab DAQ group Data Acquisition Development at JLAB.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
News on GEM Readout with the SRS, DATE & AMORE
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
SoLID review DAQ recommendations Alexandre Camsonne.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Methods to reduce dead time and achieve higher trigger rate. Sparsification Event blocking Parallel DAQ systems SFI Sequencing.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
SoLID DAQ for Transversity and PVDIS Alexandre Camsonne SoLID collaboration meeting July 9 th 2014.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
SBS / A1n DAQ Alexandre Camsonne 02/27/2013. APV25 Standard VME access ok : can configure board Check address assignment in VME64X crate Need to debug.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Hall–D Level-1 Trigger Commissioning Part II A.Somov, H.Dong Jefferson Lab 12 GeV Trigger Workshop, July 8, 2010  Play Back Test Vector in Hall-D commissioning.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
R. Michaels, JLAB PREX Mtg, July 2008 Compton DAQ (General) Remaining experts : Sirish Nanda, Alexandre Camsonne, me Recent Exercises Port to vxWorks 5.5.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
R. Michaels, JLab PREX Mtg, July 2008 Recent Cavity Monitor Tests Credit: John Musson, Anna Boehle, Vince Sulkosky Good position & current for 10 nA to.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Overview of E906 Electronics, Readouts, and DAQ System E906 DAQ workshop Ting-Hua Chang (7/6 – 7/7/2009)
Counting Mode DAQ for Compton
Data Acquisition (DAQ) Status
Hall A Compton Electron detector overview
Large CMS GEM with APV & SRS electronics
Alexandre Camsonne August 27th 2016 SoLID collaboration meeting
VETROC for Edet DAQ Bob Michaels (presenting) Scott Barcus Alexandre Camsonne Ben Raydo and the GRINCH group (Todd Averett et. al.) Compton Meeting.
Open Tasks for PrimEx-II Run
during Fall GMp run (high current)
Example of DAQ Trigger issues for the SoLID experiment
SoLID DAQ for Transversity and PVDIS
Alexandre Camsonne January 12th 2016 SoLID collaboration meeting
Alexandre Camsonne September 12th 2015 SoLID collaboration meeting
Possible parasitic measurement during Fall GMp run
August 19th 2013 Alexandre Camsonne
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Experiment DAQ and trigger GMn SBS Collaboration Meeting
Presentation transcript:

Hall A DAQ meeting January 12 th 2015

Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus SBS GEM readout FADC/ARS test stand BigBite DAQ

To do list / Gmp DVCS vkLtSNXv9YiQ03gXwI_OkozhJdkWlD1IlxgIPtw w/edit?usp=sharing vkLtSNXv9YiQ03gXwI_OkozhJdkWlD1IlxgIPtw w/edit?usp=sharing

BCM / unser UNSER New BCM – Not count at 0 current (might be negative offset ) – Saturate at 30 uA ( Optimize for DVCS or GMp)

Raster Overall works – Need check saturation ( double blob ) – Spikes – Should be ok for DVCS and GMp ( issue for He3)

Raster current plots

Raster

Compton Integrated DAQ being worked Counting DAQ photon ? Edet : – Plan stand/ semi standalone DAQ – Need BPM, cavity power – Could fit in CMU crate or use separate crate – Need setup EPICS : motion and detector – Replace detector and survey

EDTM Working in LHRS Need automatic start Need adjust priority Change to ROC DP server ? External script driving EDTM

F1 TDC Need tested spares Duplicate signal for important signal ? Cabling clean-up Power / heating

Halo monitor (GMp) Proposal – 4 fingers ( scintillator or quartz ) – Fast electronics group discrimiator ( 3 K$ 16 channels) – EPICS readout Most likely halo will be fine if it can go through Compton

Gas Cerenkov Mysterious inefficiency for bad runs – Photons ? Do we want to put 1 FADC for readout ?

SBS Fastbus 3 FB crates V1495 ready New TI Test flipping and sync with 3 new TI Could test with 6 crates ( 3 TI master + 3 TI slave ) – Need setup 6 crates – Order optical fibers

SBS GEM 1 VXS crate UVA Bryan working on MPD ( 1 month depending on priority ) INFN software working Need – Start development optical link / SSP readout SRS : readout UDP packet, need decoding program

FADC/ARS test stand 2 nd floor counting house FADC, CTP, SSP, new TI Intel CPU Need CODA setup and cabling

Bigbite DAQ 2 FB crate Computer srcdaq setup Portserver CPU booted Need setup FB readout and TS crate Need setup GEM crate