LBT Q4 2007 Engineering Review DYB. 21-Dec-2007LBT Q4 2007 Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.

Slides:



Advertisements
Similar presentations
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
Advertisements

LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review Primary Mirror Cells Biddick/Gusick/Kern.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
DT1 Gas Section Debrief of 2005 activities.. The Purpose of the Debrief  Compare plan and achievements.  Analyze how the work is done ? Do we meet the.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Eng/SW Review MCSC – Mount Control System.
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.
EUROPE Nov 27 –Dec 10 November 27 - Dec 10.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
LBT Q Engineering Review SAB Static Balancing.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Engineering/Software Review ROTRotators.
1 LBT Q Eng/SW Review PWR: Site electrical power.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Engineering Review Primary Mirror Cells.
 SOFTCON SYSTEMS PVT. LTD. (SSPL) offers unique, creative and practical automation solutions in the field of Process & Power on an LSTK / EPC basis with.
L.Vitale INFN and Univ. Trieste
PLC-based control systems at SOLEIL - ICALEPCS 2017
SCHEDULE Nov 1st - Assembly Table Complete
Teleconference ACS – FREIA 17th October 2017
Teleconference ACS – FREIA 31st October 2017
Status of the cryogenic system for B180
Status of CO2 Cooling tests at CERN for Pixel phase 1
Activity this week Activity next week
LERF Readiness Review: Charge
Operator Training Requirements
Teleconference ACS – FREIA 19th June 2017
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Presentation transcript:

LBT Q Engineering Review DYB

21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning Phase System is functioning and we are able to run the system with the MCS. System is functioning and we are able to run the system with the MCS. System senses swing arm configuration and performs the reconcile command and manual trim commands. System senses swing arm configuration and performs the reconcile command and manual trim commands. All hardware and electronics installed except bypass valves and insulation. All hardware and electronics installed except bypass valves and insulation. Bypass valves still need to be installed. Bypass valves still need to be installed. Pipe insulation work in progress Pipe insulation work in progress Final system and software tests are in progress. Final system and software tests are in progress. Current Completion Date is February/March, Slip from Nov 30 th due to scarcity of time on telescope. Current Completion Date is February/March, Slip from Nov 30 th due to scarcity of time on telescope.

21-Dec-2007LBT Q Engineering Review Open Issues Technical Technical Installation of bypass valves and insulation, and final shake down of PLC software. Installation of bypass valves and insulation, and final shake down of PLC software. Schedule Schedule Telescope time and impact on acceptance tests and any punchlist work. Telescope time and impact on acceptance tests and any punchlist work. Financial Financial None None Resource Resource Need ETS techs help to complete insulation due to competing priorities of mountain staff. Need ETS techs help to complete insulation due to competing priorities of mountain staff. PLC Programmer’s time needed to complete debugging of software. PLC Programmer’s time needed to complete debugging of software.

21-Dec-2007LBT Q Engineering Review Progress (Q4/2007) Procurement Procurement Bypass Valves, Level Sensors, Longer and Flowmeter Cable (Planned 2 nd week Nov.) (Completed 1 st week of Dec.) Bypass Valves, Level Sensors, Longer and Flowmeter Cable (Planned 2 nd week Nov.) (Completed 1 st week of Dec.) Installation Installation Insulation (Planned Oct) (Slip to January dependant on ETS help) Insulation (Planned Oct) (Slip to January dependant on ETS help) Bypass Valves, Level Sensors, and vent lines through cable wrap (Planned Nov) Level sensors and vent lines completed in Dec. Bypass valves will be installed Dec 27 th. Bypass Valves, Level Sensors, and vent lines through cable wrap (Planned Nov) Level sensors and vent lines completed in Dec. Bypass valves will be installed Dec 27 th. Commissioning Commissioning Software Tests (Planned Oct ) (Continuing into January) Software Tests (Planned Oct ) (Continuing into January) Commission Level Sensors and Calibrate Overflow Sensors (Planned Nov) (Completed in November.) Commission Level Sensors and Calibrate Overflow Sensors (Planned Nov) (Completed in November.) Acceptance Tests and Handover (Planned Nov) (Now planned to complete acceptance tests in February/March) Acceptance Tests and Handover (Planned Nov) (Now planned to complete acceptance tests in February/March) Documentation (Planned Nov) (Complete in January) Documentation (Planned Nov) (Complete in January)

21-Dec-2007LBT Q Engineering Review Progress Cont. (Q4/2007) Level sensor and support tube installed Vent Lines in Drape

21-Dec-2007LBT Q Engineering Review Planning (Q1/2008) Installation Installation Complete Insulation (January) Complete Insulation (January) Bypass Valves (Dec 27 th) Bypass Valves (Dec 27 th) Commissioning Commissioning Complete Software Tests (January) Complete Software Tests (January) Acceptance Tests and Handover (February/March) Acceptance Tests and Handover (February/March) Documentation (January) Documentation (January)