Free Space Optical Communications Senior Design Project Fall 2011 TEAM AWESOME
OVERVIEW Final Product Initial Project Specifications Actual Project Specifications Project Schedule Loose Ends Conclusion
FINAL TRANSMITTER DESIGN
FINAL RECEIVER DESIGN LT1226 Op-Amp
FINAL RECEIVER DESIGN
FINAL CHARGING CIRCUIT DESIGN
SpecificationsUnitsMin/MaxIdeal Wireless operating range feet > 2060 Time to set-up minutes < Number of pages in operating manual pages < 105 Battery life hours >= 25 Size of product package ft 3 < 1< 0.5 Number of wires needed # <= 5<= 3 INITIAL PRODUCT SPECIFICATIONS
SpecificationsUnitsMin/MaxIdeal Actual Wireless operating range feet > Time to set-up minutes < Number of pages in operating manual pages < 1056 Battery life hours >= 25>5.5 Size of product package ft 3 < 1< 0.53 Number of wires needed # <= 5<= 32.5 ACTUAL PRODUCT SPECIFICATIONS
PROJECT SCHEDULE
LOOSE ENDS Receiver Package Robustness
CONCLUSION Lessons Learned Project schedule is important Communication is key Managing time effectively & dividing the work load Highlights Finished one day after our projected finish date Got a lens incorporated into the system Got the 1Ghz op-amp to work Disappointments Receiver Failure during presentation