Task Force on Safety of Personnel in LHC underground areas following the sector 34 accident of 19-Sep-2008 Status report LPC 07/05/2009 B. Delille, S.

Slides:



Advertisements
Similar presentations
ICHS 2007, San Sebastian, Spain 1 SAFETY OF LABORATORIES FOR NEW HYDROGEN TECHNIQUES Heitsch, M., Baraldi, D., Moretto, P., Wilkening, H. Institute for.
Advertisements

Task Force on Safety of Personnel in LHC underground areas following the accident in sector 3-4 on Ghislain Roy, on behalf of the Task Force.
13 Oct 2005 ICALEPCS RAMSES: The LHC RAdiation Monitoring System for the Environment and Safety G. Segura CERN on behalf of the RAMSES team.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
HSE Preliminary General Requirements for FCC layout and air management A. Henriques & M. Widorski on behalf of the HSE Unit 17/12/2014 FCC I&O Meeting.
Laurent Tavian Thanks to contribution and helpful discussions with M. Jimenez, V. Parma, F. Bertinelli, J.Ph. Tock, R. van weelderen, S. Claudet, A. Perin,
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
CFD team supports CERN development 19 May M.Battistin CERN May 19 th 2011 C omputational F luid D ynamics team C omputational F luid D ynamics team.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
CRYOGENICS AND POWERING
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
The Sector 3-4 incident at the LHC: fault tree and corrective measures Ph. Lebrun Risk Analysis Review Committee CERN, 5 March 2009.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Helium Spill Test in LHC tunnel to define length of restricted working areas  Actual situation  Evolution  How to continue  Set-up of the spilling.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
Wu. Y., International Conference on Hydrogen Safety, September Initial Assessment of the Impact of Jet Flame Hazard From Hydrogen Cars In.
Safety systems (AL3) and systems relevant to Safety Steve Hutchins with thanks to: Karl Gunnar Lindell, Rui Nunes, Silvia Grau, Henrik Nissen, Patrice.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
05 Novembre 2003Chamonix XIV Workshop, January How to deal with leaks in the QRL and magnet insulation vacuum Paul Cruikshank for AT/VAC Germana.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Associated detection/extinction systems D. Swoboda.
7/23/ J.Coupard. 1) Cryogenic risks 2) Cryogenic phases from RT/floating to nominal and additional safety rules A. Sectors warmed-up to RT or considered.
Update of the cryogenic risk analysis following the 19 September 2008 incident M. Chorowski Wrocław University of Technology, Poland CERN, TE Seminar
For more info:
COOLING & VENTILATION FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 16/9/2009 CLIC TWO BEAM MODULES REVIEW
L. Serio COPING WITH TRANSIENTS L. SERIO CERN, Geneva (Switzerland)
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
LHC Performance Workshop Chamonix 2009 Ralf Trant Laurette Ponce Summary of Session 02 Safety.
SOME CEDAR NEWS Lau Gatignon / EN-MEF TD meeting 12/07/2011  Summary of HAZOP and Zoning meeting  Forthcoming CEDAR related work at CERN.
The cryogenic system of the HIE-ISOLDE project and its related hazards for persons N. Delruelle on behalf of the TE/CRG group HIE-ISOLDE Safety Review.
Review of Sector th of February Tunnel Access During Powering Tests Hugues Thiesen, AB-PO.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
Duy Phan, EN-STI-RBS. Description of the hazards  An Oxygen Deficiency Hazard (ODH) exists when the concentration of O2 ≤ 19.5 % (by volume)  Cold burns.
Safety related issues of the unexpected Argon release into the tunnel Maciej Chorowski, Ziemowit Malecha, Jarosław Poliński.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
LHC’s Modular Machine ITER – Machine ProtectionB. ToddJuly 2010 Thanks to : TE/MPE/MI, CERN Machine Protection Panel, et al 1v0 Protection System.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
First Outcome of the Task Force on Safety of Personnel in LHC underground areas following the sector 34 accident of 19-Sep-2008 R. Trant on behalf of the.
2 K Coldbox Safety and ESH
IT-4189 Supply and installation of a cryogenic distribution system
Equipment simplified model SMR UR safety
CENF – Personnel Protection System Preliminary Study
Installation of an Instrument on a CERN machine
CENF – Personnel Protection System Preliminary Study
News from Integration WG
HEL – Safety aspects Christelle Gaignant
Helium spill in LHC tunnel
Keeping LHC cold during LS periods Preliminary proposal
Cryogenic Risk Assessment in LHC
J.M. Jimenez On behalf of TE-VSC group
COOLING & VENTILATION INFRASTRUCTURE
Modeling and Analysis of a Hydrogen Release in a Large Scale Facility
Assumption for a given sector
RSFs & categorisation 20 May, 2019.
Presentation transcript:

Task Force on Safety of Personnel in LHC underground areas following the sector 34 accident of 19-Sep-2008 Status report LPC 07/05/2009 B. Delille, S. Evrard, J. Inigo-Golfin, G. Lindell, G. Roy, L. Tavian, E. Thomas, R. Trant, C. Vollinger 1

Mandate  I Establish the sequence of facts related to safety of personnel, based on e.g. AL3 data and FB emergency intervention records.  II Analyse the LHC underground environmental conditions with respect to Safety of personnel and explain their development, in relation with original risk analyses (incl. tests) performed.  III Recommend preventive and corrective measures for the Safety of Personnel in the LHC underground 2

 Available data:  AL3 data (ODH, AFD);  FB intervention report;  He mass flow estimates;  Pt4: video surveillance A and B from access point  Manual actions on ventilation system & P3 outlet air measurements;  Sequence of facts from technical TF;  Eyewitnesses’reports from Pt4;  Geometry of tunnel [volume, length, …];  Position of equipment  Safety valves;  ODH sensors & AFD sensors;  Ventilation doors & inlets/outlets;  Available simulations:  EN-CV CFD simulation from March 2009  Wroclaw University of Technology, simulation from March 2009  Wroclaw University of Technology, ODH simulations from 1999  He spill and temperature simulations ( M. Vadon et. al.) from 2002  Available tests:  Wroclaw University of Technology, ODH propagation scaled tests from 1999  He spill test with QRL test cell inside a simulated tunnel from I SEQUENCE OF FACTS

4 ODH data From R. Nunes I SEQUENCE OF FACTS

Mass-flow discharge 5 Measurements on air outlet Pt3, 19-Sep-08 From L. Tavian & J. Inigo-Golfin Discharge temperature : ~40 – 60 K I SEQUENCE OF FACTS

Static Approach (I)– tunnel of volume V o filled only with air of pressure p o. (II) – tunnel after injecting some amount of helium under assumption that both gases do not mix together.  Adiabatic or isothermal compression of air 6 From M. Chorowski (WUT) II ANALYZE - EXPLAIN

Tunnel pressure increase 7 ~ :19:30 Door ~1.12 bar From L. Tavian II ANALYZE - EXPLAIN

The “scenario”  The accident results into He-release of ~2 tons within ~2 minutes;  Mass-flow of 15 to 26 kg/s for about 40 sec increases static pressure in “closed” ventilation area of sector 34 ;  At roughly 120 mbar static overpressure the sector door in UL44 gives in, thus creating a flushing of all sector 34;  Tunnel air and helium release to surface via UL44 and PM shaft to the SD surface bldg. 8 II ANALYZE - EXPLAIN

Preliminary result & conclusion Reoccurrence of an interconnect arc flash/MCI at any part of the cold machine cannot be excluded. and therefore the retained recommendations are  He release has to be confined to ventilation sector concerned in combination with a controlled release to the surface  No access to machine tunnel ventilation sector during machine conditions under which an interconnect arc flash/MCI might reoccur 9 III Recommendations

Recommendations (1/3) [Results of technical TF: Limit via machine protection systems the maximum possible amount of immediate He-release to 1100 kg (or 1500 kg for mid- arc)]  2-phase approach for machine powering (low- & high energy powering) – Threshold current value between phase I and phase II still has to be defined and agreed; – Technical means to control the different access phases still has to be defined and confirmed; – The TF expects an Engineering Spec. from the powering and access study team (see talk R.Schmidt, LMC ); – Areas possible to access in powering phase II: see later this talk. 10 III Recommendations

Recommendations (2/3)  Seal machine tunnel towards experimental caverns  Protect service caverns from ODH & overpressure from machine tunnel environment in case of MCI  Improve ventilation doors at the end of machine tunnel ventilation sector (pressure & tightness)  Controlled relief of the pressure from the ventilation area to the surface, i.e. mechanically improved ducts 11 III Recommendations

Recommendations (3/3)  Close beam pipe gate valves when no beam in the machine.  Empty the LHC from LHe when going into machine shutdown;  Heavy handling and transport restrictions for machine tunnel;  Equip machine tunnel sectors with sensors monitoring T, p & air speed [REs & LSSs]. 12 III Recommend

Preliminary compensatory measures for ‘09 shutdown: machine (1/2) Controlled release to surface from ventilation sector concerned via UL → PM-shaft → SD surface bldg.  UL doors “open”  No access to adjacent ventilation areas: see access matrix  SD bldg. with ODH/evacuation alarm and overpressure protected 13 III Recommend

14  Max local pressure if only 1 UL door ‘open’ per sector 3.3km  P = 90 mb PM shaft SD building  P = 20 mb III Recommendation Preliminary compensatory measures for ‘09 shutdown: machine (2/2) MCI: 40 kg/s at 200K Maximum local pressure expected 110 mb [final configuration with improved ventilation ducts: ~70 mbar]

Choice 1: UL doors open  Low overpressure (~20mb)  light sealing of Experimental caverns  No access to UL, US, restrictions in SD Choice 2: UL doors tights  High overpressure (~110mb)  heavy sealing + structure reinforcements  No access restrictions to Exp. facilities. All underground points have different topologies. Unique recommendation from TF but individual solutions only. 15 III Recommendations Preliminary compensatory measures for ‘09 shutdown: The impact for experiments (in brief)

Preliminary compensatory measures for ‘09 shutdown: experiments  Access to service cavern during phase II powering ONLY with implemented separation from machine tunnel  Access to experimental cavern during phase II powering ONLY with implemented separation from machine tunnel n.B.: Remember general condition of beam pipe gate valves being closed and protected against overpressure while NO beam 16 III Recommendations

Access matrix – DRAFT for 2009/10 17 III Recommendations  Sealing of experimental cavern is assumed to be completed  The matrix may change depending on the local implementation of the recommendation

Open Points Risk to personnel following “mechanical impact” to experiment beam tube and/or inner detectors from arc flash resulting in a loss of He containment into beam pipe. May similar scenario happen to ATLAS/CMS SC magnets? 18 III Recommendations

Proposal for other follow-up actions  Safety TF: elaborate detailed “matrix of access” to tunnel sectors/experiments/adjacent tunnels;  R. Schmidt’s team: Establish the threshold value for the current limit between the machine phases I & II;  EN/CV: carry out an implementation study for pressure release via ventilation ducts to the surface  EN/HE: implement re-enforced and “tight” ventilation doors  GS/SEM: implement SD bldg. protection  GS/ASE: install ODH/evac. Alarm in SD bldg’s  GS/ASE & BE/OP: Feasibility study for access interlocks other than RP during different machine phases.  TE/CRG: monitoring of T,p for future incident analyses (no online monitoring);  Working Group for structural integrity (initiated by S.Myers); 19 III Recommendations