1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.

Slides:



Advertisements
Similar presentations
Sharing of ISTS Charges & Losses Regulation
Advertisements

OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
Congestion When transmission demand >capability When Voltage levels in a corridor beyond operable limits When Real time line flow exceeds the TTC Most.
Development Of A Common Platform For Electricity Trading CERC Public Hearing Presentation By POWERGRID 19-December-2006.
Settlement system of Bilateral transactions under Open Access
PROCEDURE FOR:: REAL TIME CONGESTION MANAGEMENT. ASSESSMENT OF TTC TTC/ATC assessment is carried out after construction & solution of a base case power.
INDIAN POWER SECTOR. ADMINISTRATION AND MANAGEMENT As per Constitution of India, Electricity comes under concurrent list i.e. the development and management.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
Grid Integration of Renewable in India - Challenges and Policy Responses Sanjay Garg General Manager General Manager PGCIL/ Ministry of Power.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
OPEN ACCESS EXPERIANCES AND WAYAHEAD. OPEN ACCESS: DEFINITION AS PER ELECTRICITY ACT, 2003 Section 2 (47) “ Open access” means the non-discriminatory.
Load Forecast T SRINIVAS MANAGER SRLD C. LINKS PREAMBLE GENERATION ANALYSIS GROWTH OF I/C GROWTH OF I/C Vs DEMAND PHYSICAL INTERPRETATION ELECTRIC CONSUMPTION.
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
W E L C O M E Power Grid Corporation of India Limited.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
1 PRESENTATION ON “OPEN ACCESS – ELECTRICITY ACT 2003” TO THE OFFICERS OF KARNATAKA ELECTRICITY BOARD On POWER ENGINEERS’ DAY 23 RD January, 2005 by V.K.
Anil Thomas Asst. Executive. Engineer Southern Regional Power Committee Central Electricity Authority.
UI IN SR (FROM 01/01/03 TO 13/05/07) TOTAL UI TURNOVER :- 13,831 MU TOTAL UI AMOUNT DISBURSED:- 3,177 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
Workshop on State-Level Electricity Reforms: Firm Choices, Emerging Generation Markets and Externalities “Open Access: Experiences” ALOK ROY General Manager,
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
OPEN ACCESS IN INTER STATE TRANSMISSION. Gazette Notification of Open Access in inter state transmission systemGazette Notification of Open Access in.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
Overall National Grid Development: Constraints & Options
POWER GRID CORPORATION OF INDIA LTD
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
PRESENT CONDITIONS. FREQUENCY DURATION CURVE , , &
OPEN ACCESS EXPERIANCES AND WAY AHEAD WORKSHOP ON GRID SECURITY AND MANAGEMENT on 28 th and 29 th April, 2008 V K Agrawal, General Manager.
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
Issues related to UI pool. Payment to pool account by KPTCL and Pondy Till June 2010 payment to UI pool by KPTCL and Pondy was through cheque/DD. Pondy.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
Issues for discussion ON INTERTRIP SCHEME AT TALCHER II Present Scheme has worked satisfactorily as per the Logic designed On number of occasions unit(s)
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
UI IN SR (FROM 01/01/03 TO 12/08/07) TOTAL UI TURNOVER :- 14,596 MU TOTAL UI AMOUNT DISBURSED:- 3,434 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
Open Access.
Open Access.
Scheduling of Collective Transactions Through Power Exchange
Hon’ble Commission has issued Interim order dated 19/ directing :
“ Open access / Power Exchange Regulations/experiences of SR ”
Congestion regulations
IN INTER-STATE TRANSMISSION
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Settlement system under Open Access
OPEN ACCES IN INTER-STATE TRANSMISSION.
Presentation transcript:

1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC

2 Types of Inter-connections AC links (Synchronous mode) AC links (Synchronous mode) DC Links (Asynchronous mode) DC Links (Asynchronous mode)through - HVDC line and Convertors/Invertors - HVDC line and Convertors/Invertors - HVDC Back to Back system - HVDC Back to Back system

3 Features of AC links Low cost (up to some distance) Low cost (up to some distance) Increased Fault level and Inertia Increased Fault level and Inertia Synchronous operation (same frequency) Synchronous operation (same frequency) No control on Power flow No control on Power flow Fault in one Region may affect other Region Fault in one Region may affect other Region Over voltage problems Over voltage problems Huge Power is lost in Equalizing the frequencies thereby loosing the advantage in Differential frequency Huge Power is lost in Equalizing the frequencies thereby loosing the advantage in Differential frequency No run back schemes No run back schemes

4 Features of DC Links Higher capital cost Higher capital cost Asynchronous operation Asynchronous operation Immunity from faults in both Regions Immunity from faults in both Regions Control on Power flow Control on Power flow Optimization through frequency Optimization through frequency Differential Differential

5 High lights of various HVDC links Bypass arrangement (ex.Bhadrawati,Gazuwaka) Bypass arrangement (ex.Bhadrawati,Gazuwaka) Power order setting Power order setting Minimum Power for deblocking Minimum Power for deblocking Ramping rate variation Ramping rate variation Run Back systems / Power Demand Overrides (PDOs) Run Back systems / Power Demand Overrides (PDOs) Automatic Filter switching for Reactive power requirement Automatic Filter switching for Reactive power requirement

6 TALCHER KOLAR LINK ONE OF THE LONGEST HVDC LINES IN THE WORLD ONE OF THE LONGEST HVDC LINES IN THE WORLD DESIGNED TO EVACUATE 2000 MW DESIGNED TO EVACUATE 2000 MW COMMISSIONED IN ADVANCE TO UTILISE NON- PEAK SURPLUS POWER OF EASTERN REGION COMMISSIONED IN ADVANCE TO UTILISE NON- PEAK SURPLUS POWER OF EASTERN REGION COMMISSIONED 9 MONTHS AHEAD OF SCHEDULE COMMISSIONED 9 MONTHS AHEAD OF SCHEDULE COST INCURRED Rs 3,100 CRORES AGAINST APPROVED COST OF Rs 3,866 CRORES:- SAVING OF NEARLY 800 CRORE RUPEES COST INCURRED Rs 3,100 CRORES AGAINST APPROVED COST OF Rs 3,866 CRORES:- SAVING OF NEARLY 800 CRORE RUPEES THE PROJECT HAS USED APPROXIMATELY 90,000 TONNES OF STEEL AND 16,000 KM OF CABLES THE PROJECT HAS USED APPROXIMATELY 90,000 TONNES OF STEEL AND 16,000 KM OF CABLES

7 TALCHER-KOLAR IMPORT OF 12728MUs FROM ER THROUGH TALCHER-KOLAR UPTO OCT-04 YEAR ---> MONTHS TOTAL ENERGY (IN MU) MAX FLOW (IN MW) TOTAL ENERGY (IN MU) MAX FLOW (IN MW) TOTAL ENERGY (IN MU) MAX FLOW (IN MW) JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TOTAL MAX

8 Defense Mechanism Run Back scheme in Gazuwaka HVDC Power level reduces to 250MW, - If Gazuwaka East bus Voltage <320kV - If Gazuwaka ICT O/L alarm actuates - If Jeypore ICT trips - If Jeypore-Indravati Line trips Power level reduces to 150MW, - If East side frequency <49Hz and if df/dt>=-0.3 Hz./sec. if df/dt>=-0.3 Hz./sec.

9 Defense Mechanism for Talcher Kolar HVDC link In case of any pole tripping, Inter-trip signal generated to trip associated AC lines at Yerraguntla(AP), Kolar, Hoody, Somanahalli(Karnataka) Sriperambadur, Salem and Hosur (TN) Mode of Oprn. Power Level for Inter-trip Mono polar >400MW and pole trips Bi-polar >800MW/pole and one pole trips Bi-polar >200MW/pole and both pole trip contd..

10 Defense Mechanism for Talcher Kolar HVDC link Further PDOs at HVDc Kolar, Condition Power reduced to If only 2 lines are available 500MW If only 3 lines are available 1000MW If only 4 lines are available 1500MW

11 Experience of SR in operation of IR links Congestion in associated AC network in Congestion in associated AC network in (ex. 1)Over loading of Raipur-Rourkela, (ex. 1)Over loading of Raipur-Rourkela, Raipur-Bhadravati, Chandrapur-Bhadravati in case of more import from WR. 2) Over loading of Chadrapur-Parli 2) Over loading of Chadrapur-Parli in case of more export to WR in case of more export to WR 3) Over loading of Jeypore-Jayanagar, Jeypore- Meramundali, Jeypore-Indravati, Talcher- Banjinagar(220kV), Gajuwaka-Vijayawada in case of more import from ER through Gazuwaka 3) Over loading of Jeypore-Jayanagar, Jeypore- Meramundali, Jeypore-Indravati, Talcher- Banjinagar(220kV), Gajuwaka-Vijayawada in case of more import from ER through Gazuwaka Reduced fault level at Jeypore Reduced fault level at Jeypore contd…

12 Experience of SR in operation of IR links Problems in Converter transformers at Gazuwaka ( HENCE SUGGESTED FOR STANDBY CONVERTER TRANSFORMERS AT ALL THE PLACES) Problems in Converter transformers at Gazuwaka ( HENCE SUGGESTED FOR STANDBY CONVERTER TRANSFORMERS AT ALL THE PLACES) Harmonics in neutral of Kolar ICT and flow of the same in associated system Harmonics in neutral of Kolar ICT and flow of the same in associated system Over voltage at Kolar due to Switching of filters Over voltage at Kolar due to Switching of filters High losses in Monopolar- Metallic return mode. High losses in Monopolar- Metallic return mode. Annual Maintenance of Poles. Annual Maintenance of Poles. CURTAILMENT OF STOA CURTAILMENT OF STOA

13 LOSSES IN HVDC SYSTEM POWER ORDER IN MW %LOSS%LOSS MAX CAPACITY MIN. CAPACITY (50MW )

14

15 Loss optimization IR flows can influence SR System Loss By importing more through Kolar By importing more through Kolar By exporting to WR from Ramagundam- Chandrapur Link By exporting to WR from Ramagundam- Chandrapur Link During high frequency, More import from Gazuwaka preferred. During high frequency, More import from Gazuwaka preferred.

16 Losses applicable for various transactions 1. For share from ER ISGS- ER+SR losses 2. For Talcher St-II power through Kolar, - SR losses 3. For Talcher-St-II power when wheeled through Gazuwaka – ER+SR losses through Gazuwaka – ER+SR losses through Bhadravati – ER+WR+SR losses through Bhadravati – ER+WR+SR losses 4. Wheeling of ER power through SR – ER+ SR losses – ER+ SR losses

17 Normative % Losses of Central sector in various Regions ER ~ 3 to 3.5% ER ~ 3 to 3.5% SR ~ 2.8 to 3.8% SR ~ 2.8 to 3.8% WR ~ 6 to 6.5% WR ~ 6 to 6.5% NR ~ 3 to 4% NR ~ 3 to 4%

18 Priority of Exchanges through IR links Long Term transactions Long Term transactions (ISGS Allocation to Beneficiaries of the same region) Wheeling of ISGS share of Beneficiaries in other regions any other long term transactions approved STOA Transactions STOA Transactions

19 PROCEDURE FOR CURTAILEMENT In case of transmission constraint, if curtailment is necessary then, In case of transmission constraint, if curtailment is necessary then, Short term customers first Short term customers first Long term customers next Long term customers next Within the category, OA customers have OA customers have curtailment on pro rata basis

20 Commercial Aspects Metering and Scheduling points : SR-WR South Bus of HVDC Bhadravati SR-ER East Bus of HVDC Gazuwaka AC Inter connector of Talcher St-I and St-II

21 TSTPP St-II scheduling and Despactch TSTPP St-II furnishes DC to SRLDC with a copy to ERLDC. TSTPP St-II furnishes DC to SRLDC with a copy to ERLDC. SRLDC to carry out rest of the Scheduling process SRLDC to carry out rest of the Scheduling process Talcher/ Gazuwaka set points to be decided in consultation with ERLDC Talcher/ Gazuwaka set points to be decided in consultation with ERLDC Talcher HVDC controlled by ERLDC. Talcher HVDC controlled by ERLDC. Gazuwaka HVDC controlled by SRLDC. Gazuwaka HVDC controlled by SRLDC. In case of Talcher Pole tripping TSTPP St-II Power wheeled through Gazuwaka/Bhadrawati In case of Talcher Pole tripping TSTPP St-II Power wheeled through Gazuwaka/Bhadrawati

22 TSTPP St-II UI accounting TSTPP St-II – a SR ISGS embedded in ER system TSTPP St-II – a SR ISGS embedded in ER system TSTPP St-II ER frequency and to pay to SR pool TSTPP St-II ER frequency and to pay to SR pool Net injection of TSTPP St-II = (Talcher HVDC Energy- flow on I/C betweenTalcher St-I&II) Net injection of TSTPP St-II = (Talcher HVDC Energy- flow on I/C betweenTalcher St-I&II) Variation in TSTPPSt-II Generation results in ER-SR UI, if HVDC set point not changed Variation in TSTPPSt-II Generation results in ER-SR UI, if HVDC set point not changed Sometimes –ve UI occurs if ER – SR SCHEDULE flow is not changed in accordance with ER-SR frequency differential. Sometimes –ve UI occurs if ER – SR SCHEDULE flow is not changed in accordance with ER-SR frequency differential.

23 Inter Regional UI settlement IR UI calculated by each REB at respective frequency IR UI calculated by each REB at respective frequency IR UI Payment on 1 st charge basis without pro-rata reduction/averaging out IR UI Payment on 1 st charge basis without pro-rata reduction/averaging out Importing Region to pay on lesser of the two principle. Importing Region to pay on lesser of the two principle. Differential due to difference in UI rates on a/c of frequency deposited by importing region in their IRE account. Differential due to difference in UI rates on a/c of frequency deposited by importing region in their IRE account. WR UIER UI

24 IRE Settlement Such accrued amounts of IRE account to be shared on 50:50 basis between Beneficiaries of both Regions Such accrued amounts of IRE account to be shared on 50:50 basis between Beneficiaries of both Regions By way of credit in Transmission charges of CTU By way of credit in Transmission charges of CTU

25 Status of IRE a/c settlement in SR & other regions 100% settled to SR constituents except for provision for Revisions 100% settled to SR constituents except for provision for Revisions Rs. 5 cr. Released WR constituents Rs. 5 cr. Released WR constituents Release to ER will start next week. Release to ER will start next week.

26 INTER-REGIONAL EXCHANGES WR A/C DETAILS UPTO 93 WKS TILL 10/10/04 1.NET ENERGY TRANSACTION IS 146 MU (IMPORT BY SR). 2.AMOUNT ACCRUED IN SREB – IRE DUE TO DIFF. IN WR A/C = 41.83Crs 3.AMOUNT TO BE ACCRUED IN WREB – IRE DUE TO DIFF. IN SR A/C = 27.71Crs 4.AMOUNT DUE TO SR CONSTITUENTS ON 50:50 BASIS = 34.73Crs 5.AMOUNT ALREADY DISBURSED TO SR CONSTITUENTS = 33.39Crs

27 Procedure for Bidding RLDC concerned shall invite bids if transmission capacity reservation sought by short term customer is more than the availability in a particular transmission corridor The floor price of the bids for short term customer shall be about 1/4 th rate chargeable from long term customer and will be in Rupees per MW per day. If customer gets the quantum of power he has bid for – he has to pay the price quoted by ‘last’ customer. If customer gets a quantum lesser than that he has bid for – he gets to pay his bid price

28