Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
ENTITIES FOR A UN SYSTEM EVALUATION FRAMEWORK 17th MEETING OF SENIOR FELLOWSHIP OFFICERS OF THE UNITED NATIONS SYSTEM AND HOST COUNTRY AGENCIES BY DAVIDE.
NAESB Measurement and Verification Model Business Practice Retail Electric Demand Response 5/29/09 update.
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
SSC-NM0053 Determination of Greenhouse Gas Emissions Reductions Based on Whole- Building Simulation of Building Mitigation Efforts Using eQUEST/DOE-2.2.
BASELINE STANDARD UNFCCC secretariat workshop
T HE W ORLD B ANK C ARBON F INANCE U NIT UNFCCC W ORKSHOP : S TANDARDS FOR BASELINE SCENARIO IDENTIFICATION AND BASELINE EMISSION CALCULATIONS M ARCH 2011.
TÜV NORD Calibration regarding project assessment requirements 7th CDM Joint Coordination Workshop 2011 Bonn,
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
. CDM Project Cycle Calibration Melanie Eddis ERM Certification and Verification Services (ERM CVS) CDM Coordination Meeting UNFCCC, Bonn March 2012.
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
Software Analysis Tools
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Ensuring Effective Monitoring, Certification and Verification of Emissions by Jed Jones Lloyd’s Register.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Yuji MIZUNO Institute for Global Environmental Strategies Baseline for Waste Management Project Regional Workshop in Asia on Capacity Development for the.
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
World Bank Workshop on CDM Methodologies and Technical Issues Associated with Power Generation and Power Saving Project Activities December 3, 2005 Montreal.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
POWER GRIDS AND CDM METHODOLOGIES Workshop for CDM stakeholders The World Bank Buenos Aires December 8, 2004.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
Case Study 5: Gemina rice husk project, Nicaragua Sandra Greiner Carbon Finance Unit The World Bank World Bank methodology event.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Creating the Carbon Asset: PCF Approaches to Baselines and Additionality Sao Paulo, Brazil November 20-22, 2002.
CDM Methodology World Bank Carbon Finance: Interpretations and Approaches to Baselines, Monitoring and Calculation of Emission Reductions Bonn, 6 June.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Carboncredits.nl Baseline Methodologies Dispatch Analysis Gerhard Mulder Project Officer.
CDM Project Developers Workshop.  Boundaries & Leakage  Calculating emissions reductions  Any other issues Session II.
CDM Project Developers Workshop.  Baselines – what, types of baselines, baseline scenarios, baseline emissions.  Additionality – what, why, how  Establishing.
Min Hydro-Egypt 1 Tunis, Sept 22-24, 2004 TIMS/EEAA Jerba-CDM-Investment-Forum UNEP RISOE / APEX EGYPT : Damietta Barrage Small Hydropower Project Eng.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
AIT Critical aspects in PDD: meeting CDM Criterion Sudhir Sharma Asian Institute of Technology Bangkok, Thailand 23 rd March 2004.
Harnessing the carbon market to sustain ecosystems and alleviate poverty Monitoring of AR Projects Monitoring of AR Projects BioCarbon Fund Training Seminar,
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
ENDA TM / CDM-PDD1 Analysis of a CDM-PDD illustrated by the El Gallo project Second Regional Workshop on CD4CDM August 2004 Maputo, Mozambique Dr.
AIT Baselines and Additionality Sudhir Sharma Asian Institute of Technology Bangkok, Thailand 24 th March 2004.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
Conclusions Buenos Aires, – December 5 th, 2004 CDM Methodologies and Project Design Workshop for CDM Project Developers.
El Gallo Hydroelectricity Project PDD Analysis
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)
CHAPTER 4 ALTERNATIVES. --- “The driving impetus for conducting environmental impact studies is to comparatively present the effects of proposed alternatives.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
Steps for Submission of New Baseline Methodologies National Workshop on Baseline Methodologies CD4CDM Project (Phase II) 31 March – 1 April 2004 Sami Mostafa.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
Some open questions in power sector methodology Sandra Greiner Carbon Finance Unit The World Bank World Bank methodology event Dehli,
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
Session 4.2. Criteria for baseline setting and monitoring Dealing with methodological matters in the ERUPT programme Zsolt Lengyel SenterNovem Carboncredits.nl.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
Case study 1 Review comments on Baseline Methodology Waste heat use project Prepared by Nguyen Van Hanh Vietnam.
CDM Project Design Document CDM Project Design Document Training Course May 22, 2003 CCIC Conference Room Manila Observatory Ateneo de Manila University.
Conservativeness in baselines WB workshop for CDM project developers Buenos Aires, 5 December 2004 Lambert Schneider.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Update on Methodological Issues Annual Meeting of the Host Country Committee Köln, May 2006.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
Baseline approaches and methodologies: interpretation of Para 48(a)-(c) M&P Buenos Aires, – December 5 th, 2004 Johannes Heister – World Bank, Carbon Finance.
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
Clean Development Mechanism
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
Chuck Goldman Lawrence Berkeley National Laboratory
ARNM0002 REFORESTATION OF GRASSLANDS WITH NATIVE SPECIES
Perspective on consolidated methodologies & additionality tool
CDM Methods and project design: Baselines
Software Analysis Tools
CDM Activity Cycle under the Marrakech Accords
EM&V Planning and EM&V Issues
Presentation transcript:

Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003

Contents Recommendations by the Meth Panel on Baseline Methodology Evaluation of the Proposed New Baseline Methodology by the Meth Panel

Recommendations on Baseline Methodology “C” – Methodology Not Approved May be resubmitted in accordance with the procedures for submission and consideration of proposed new methodologies of the Executive Board

Recommendations on Baseline Methodology Reasons for Non Approval 1.The methodology shall explicitly demonstrate that the project activity is not the baseline 2.Cost calculations do not follow a specified methodology and are not applied conservatively 3.Ex post calculation of baseline emission rates is not justified

Recommendations on Baseline Methodology Reasons for Non Approval 4.The elaboration of the baseline scenario must be specified by the baseline methodology and not left to the monitoring methodology 5.Discrepancy between the load characteristics of of the proxy plant used to demonstrate additionality and the marginal dispatch plants used to determine ex post baseline emission factors

Details of the Evaluation 1.The methodology shall explicitly demonstrate that the project activity is not the baseline No reference should be made to “environmental additionality” and the methodology must explicitly demonstrate that the project activity is not the baseline CDM M&P does not use this term. Additionality has been defined in the CDM M&P and clarified in the CDM-PDD glossary. What is required is a demonstration of how the proposed new methodology implements this decision. If the costing formula were clearly specified, the methodology might be capable of a demonstration that the project activity is not the baseline. However, there are two methodological problems: 1) Costing formula is not specified 2) The comparison should be between the expansion of the grid with the project activity registered under the CDM and without such registration

Details of the Evaluation 2.Cost calculations do not follow a specified methodology and are not applied conservatively The project participants should select a specific costing approach in their methodology and document it fully. The EPRI TAG Method is only cited as an example. The methodology should specify that conservative assumptions are used for cost calculation (long lifetime of the project activity, short lifetime of alternatives, low discount rates, realistic assessment of value of hydro generation) The methodology should require to rigorously document the method and parameters used to generate the costs of the different options evaluated for the least cost analysis.

Details of the Evaluation 3. Ex post calculation of baseline emission rates is not justified In order to ensure that: a) the methodology yields a conservative result; b) is not rendered invalid should current dispatch data become invalid in the future; c) the precise algorithms are clear ex ante, the methodology should include a calculation of an ex ante baseline emission factor, consistent with the elements of a methodology identified by the EB. The baseline emission factors must be reported explicitly in the draft CDM-PDD.

Details of the Evaluation 3. Ex post calculation of baseline emission rates is not justified (…Continuation) Specifically, the ex post calculation of baseline emission rates methodology has the following problems: The methodology seems to introduce unnecessary uncertainty – the emission factors for the baseline are known, as they must be estimated for the purpose of reporting the emissions reductions. The principle of transparency demands that such estimates be stated Emission factors MUST be reported explicitly in the draft PDD as the proposed new methodology relies heavily on the argument that there will be emission reductions that will take place The project developer MUST justify why the ex post monitoring of the grid in the “with the project” situation is a fair representation of what would have occurred in the absence of the project activity

Details of the Evaluation 4.The elaboration of the baseline scenario must be specified by the baseline methodology and not left to the monitoring methodology The reasonableness of the baseline scenario is open to methodological question: Taking only the highest cost/ last plants fired may be a workable estimation method, but is likely to err on the high (non-conservative) side where peaking units have a higher emission factor that other plants. The baseline methodology should show how the least-cost methodology can be implemented in a consistent and a transparent manner. A thorough explanation is needed to explain why coal is considered as the most attractive scenario given the national expansion plans of Guatemala which does not mention coal as a significant player.

Details of the Evaluation 4.Discrepancy between the load characteristics of of the proxy plant used to demonstrate additionality and the marginal dispatch plants used to determine ex post baseline emission factors There is lack of clarity in distinguishing peak and base-load. This lack of clarity has implications on the cost. (Example: The coal plant used as proxy to demonstrate addtionality will most likely run at night and in lower demand season when avoided costs are low) If El Canada Project can store and release more during peak periods, then it can provide higher valued output.