What is the “Project”? A temporary endeavor undertaken to create a unique product or service.

Slides:



Advertisements
Similar presentations
1 Unit C3 Finance, legal Affairs and Partner support CALL FOR PROPOSALS APPLICATION PROCEDURE SPECIFIC ADMINISTRATIVE AND FINANCIAL ISSUES Version
Advertisements

Project Control: Developing the As-Planned S-Curves
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Cost Estimation in a Construction Company Under the guidance of Prof. K. Narayanan Department of Humanities and Social Science Indian Institute of Technology,
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
CERTIFICATE 4 IN BUILDING BCGBC4004A. 18 week course First 10 weeks in classroom Following 8 in computer room 1.30pm pm (with 15 min break) Assessments.
Construction Project management Prepared by: Muath Saadeh Saadeh Abu-Sa’da Kamel Beshara.
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
AN-NAJAH NATIONAL UNIVERSITY FUCULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT GRADUATION PROJECT CONSTRUCTION PROJECT MANAGEMENT (Value Engineering)
Civil engineering department Graduation project (part 1)
What are they and what are they used for?. Contract Documents Architects working drawings Specifications Schedules Bill of Quantities.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
Chapter 14: Cost Approach. Cost Approach  The Cost Approach is most useful when:  Property is unique  Property is reasonably new and the improvements.
An-Najah National University Faculaty Of Engineering Civil Department Construction PROJECT MANAGEMENT CONSTRUCTION PROJECT MANAGEMENT Prepared by: sameh.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Graphic Language of Buildings Architectural Plans.
INTRODUCING THE COST APPROACH Chapter 11. Base cost Builder’s profit Building shell Building size and shape Comparative square-foot method Construction.
Vladimir Liberzon Oksana Sakhraui Victoria Shavirina Spider Management Technologies, Moscow, Russia
Building Industry Game B.I.G. - Building oror Building/Heavy Associated Schools.
EPC & Alliances. PONTICELLI REASONSTYPES Interview of Philippe LECOIS Business Development Manager.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Construction Contracts and Project Delivery Methods
STANDING COMMITTEE ON APPROPRIATIONS Presentation by Zandile Mathe Deputy Director General: NWRI 11 February Briefing by Department of Water Affairs.
An-Najah National University Engineering Faculty Civil Engineering Department Submitted in partial fulfillment of construction project management for the.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Construction PROJECT MANAGEMENT Supervisor : E. Barraq Jumaa Prepared by: Ahmad Faqra Amjad Zarour Nidal Haroon.
Construction Project Management “Tubas Governmental Hospital” Prepared by: Asma’a Abu-Aqel Naheel Al-Naser Presented to: Ir: Barraq Jumaa.
CE Estimation & Quantity Surveying UNIT – IV VALUATION Prepared by Prof. S.L. DAVID ANANDARAJ.
Chapter 11 Construction Engineering. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
An-Najah National University Faculty of Engineering Civil Engineering Department Construction Project Management “Medical Center In Al-Daheria” Prepared.
Project Management An Introduction to Project Management Supervisor :eng. Baraq Juma’a Prepared by: Khaled Mohammad Sawalha Suha Tarek Awwad
C ONSTRUCTION PROJECT MANAGEMENT Submitted in partial fulfillment of construction project management for the bachelor degree in civil engineering Fuad.
Estimating Activity Duration Time Interval –Time Interval is selected according to the nature of the activity (seconds - minutes …) –It is common practice.
Marketing & Tendering. Budget Forecasting Profit is the key to Business Success – Profit is amount of money after all expenses Materials Labour Insurances.
Construction Project Management Prepared By: Omar Al-Taher Supervised By: Dr Baraq Jum’aa.
P ROJECT M ANAGEMENT. Case study Assumptions Methodology Discussion.
* PROJECT OVERVIEW. 1. WHAT? 2. WHERE? * Objective and Method of construction 1. WHAT IS THE OBJECTIVE ? 2. WHICH METHOD USE ?
7 An-Najah National University Civil Engineering Department Management engineering prepared by : Mariam Al-Qarow Hala Harb Amani Saleh Submitted to: Dr.
Chapter 13 Estimates for Remodeling Work
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
TOPIC-7- PROJECT CASH FLOW
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Presented by: Brienne Berscheid Assistant Vice President & Construction Escrow Underwriter Construction Escrow Documentation Requirements.
MIS Project Management Instructor: Sihem Smida Project Man agent 3Future Managers1.
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Project Management Lecture 22
Light Rail Transit Project
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
{Beir Ziet Secondary Boys School }
Estimating the Cost of a Concrete Pad & Rebar (Revised: )
Construction Project Management
Construction Project Management
An-Najah National University
An-Najah National University
Construction Project Management
What is the best method for constructing schools in Palestine ?
Construction Approach and Productivity Issues
Construction Project Management
An - Najah national university Civil engineering department
Contractual Arrangement
Contract and tender form Phases of designing Phases of implementation
Construction Contracts
Construction Project Management
An-Najah National University Faculty Of Engineering civil Department
Muskat Secondary School Project
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Advancd Measurement and Contract Administration
Presentation transcript:

What is the “Project”? A temporary endeavor undertaken to create a unique product or service

What is the Project Management? Project Management is the sum of all activities such as Planning, organising, implementing and controlling a project in order to meet the client’s expectation from start to finish within the planned period, budget and quality.

Who is the project Manager? A project manager is a professional in the field of project management. Project managers can have the responsibility of the planning, execution, and closing of any project.

Management Functions Planning Organizing Leading Controlling

Management Skills Conceptual Skills Human Skills Technical Skills

Our Graduation Project

Project Overview Project title : “Hyatt Nablus Recreation Center” Project Title: Multiple Service Building Location: Bita Village – South Nablus

This Project consists of main building and external yards with retaining walls on the land with total area of 4 dunums. The main building is consisting of three floors with total area 1400 meter square.

Assumptions Working days are all days except Friday The electrical and mechanical works will be done by sub contractors. Fixing the value of Euro with (1Euro =5.0 NIS).

Construction Method The structural method that used is : finishing the structural part for the floor and then starting on the above floor structural work, and in the same time starting with finishing works for the previous floor.

Work Breakdown Structure

Bill of Quantity Preparation Calculations were made depending on Drawings to find the quantities and tabulating it.

Activity List The activity list entered in the (Primavera) program and it’s dependency also were managed on this program. The dependency of the activities were constructed according to our method of construction.

Activities Durations The activity duration depends on the productivity of labors and machines. [Duration = quantity budgeted for activity \ productivity]. At this project the productivity taken from site engineers and contractors.

Pricing The costing process based upon past experience for the contractor. The pricing for each element of unit was different from each other, some units were priced according to the area, others were priced according to the number of units.

Results

Cost Results Total cost of project calculated using Primavera project is (386,622.5€) The profit percentage is 10% (since project like this depend on labor so the risk is high) The over head percentage is 5% The actual cost of project was (340,000€)

Duration Results The total duration of the project as planed in this case study is 325 working days. actual work in the project was 365 working days.

Some reasons of the difference of the time and cost Material procurement Problems of finance for the project Political reasons Winter weather (rainy days)

S-Curve cost control of this project made By using (S-Curve), by comparing the actual cost with the plan cost of the project. For this project the S-Curve is done by plotting cumulative cost with time as shown.

Weather Risks Average rainy days of the last three years from msn weather data (for Nablus city),and depending on this calculation is done. 35 working days (40 calendar days) added to the end of project depending on rainy days and the beginning and finishing of the activities affected by rainfall.

Thank You!