Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR

Slides:



Advertisements
Similar presentations
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW APRIL 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State___________.
Advertisements

1Year of IncorporationYear of commissioning 2. a. Share Capital as on 31/03/12 ( R lakhs) Government Holding (%) i. Paid up Capital as on 31/03/12 ( R.
NON-INT BEARING ADVANCES 1.Festival Advance 2.Flood/Drought Advance 3.Cycle Advance 4.Warmcloth Advance
 The National Rural Employment Guarantee Act-2005 was notified by Government of India on September 7,  The basic objective of MGNREGA is to enhance.
1 1 National Highways Development Project(NHDP) Ministry of Road Transport and Highways National Highways Authority of India.
1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.
ESTIMATES Mrs.Nirupma Kumar Prof. Fin & Investment.
 A number of mega steel plants coming up in this region.  This New-Line-A Connector between coal fields in Talcher to Banspani-Sukinda line.  Coal.
CAMPAIGN FOR DRI LOANS TO IAY BENEFICIARIES GUJARAT.
Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
MUSURUMILLI PROJECT 15 km 35.4 km Project cost : cr
SPILLWAY ( 77 mt) 31.5 Km SEEPAPALLY VAGU RESERVOIR Right Earth Dam226 Mt Left Earth Dam 522 Mt Non EPC Package Works under progress EPC Package Works.
Pranahita – Chevella Project PHASE - II
REVIEW ON NREGS – AP BY Hon’ble Chief Minister Date
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-
No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under.
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
(POLAVARAM) (Head Works)
TADIPUDI LIFT IRRIGATION SCHEME
Neotech Institute of technology Department of Civil Engineering
For Long Term Water Security SARDAR SAROVAR (NARMADA) PROJECT Sardar Sarovar Narmada Nigam Limited Dr. M.B. Joshi GM (Tech. & Coor.)
Hydro Electric Power Plant
PRESENTATION BY Manaranjan Mali, Addl.P.D Technical, DRDA, Nabarangpur.
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
DISTRICT RURAL DEVELOPMENT AGENCY, KENDRAPARA Success Story Presented By:- PANCHAYAT SAMITI Mahakalapara Dist-Kendrapara.
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
GNSS PROJECT (PHASE-I)
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
1 Presentation on Kaladan Multimodal Transit Transport Project (Port & IWT component) 23 rd February 2011.
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
SUCCESS STORIES GHATGAON PANCHAYAT SAMITI Dist-KEONJHAR.
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
1 Performance review of the D/o RD & PR for RURAL DEVELOPMENT & PANCHAYATI RAJ DEPARTMENT.
Corporate Office Ambience Corporate Tower, Ambience Mall, Ambience Island NH-8 Gurgaon
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
1. Sittwe Ch. 0.0 km Paletwa Ch. 158 Km Kaletwa (Ch 225 km Myeikwa (IM Border) Kyauktaw Bay of Bengal KolkataSittwe539 km SittwePaletwa158 km PaletwaKaletwa.
WEL COME PANCHAYAT SAMITI, MUNIGUDA. 1. Updation of information in the online module relating to Muster Roll, MB entry * Online entries are made on the.
PHASE – I & PHASE - II.
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
Company is giving a fix income on every lead which is complete by you or by your Executive, I.E. Rs. 900/- E.G. if a single field executive.
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
INTEGRATED COASTAL ZONE MANAGEMENT PROJECT AT SAGAR ISLAND MONTHLY PROGRESS REPORT AS OF 31 st JANUARY, 2016 GHOSH, BOSE & ASSOCIATES ( P) Ltd, 8, HARRINGTON.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
SOLAR EPC CONTRACTOR COMPANY PROFILE SURYA INTERNATIONAL.
PRESENTER: K.P.REDDY B.E (Elect), F.I.E S.E (Retd.) APGENCO Associate President, Telangana Retired Engineer's Forum 1.
:: Presented by :: (Rohit Gupta) DPC (Mahatma Gandhi NREGA) & District Collector Udaipur Mahatma Gandhi NREGA Udaipur.
11th National Food Security Mission Executive Committee Meeting on Department of Agriculture Andhra Pradesh 1.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
Karnataka Urban Infrastructure Development & Finance Corporation Working towards better urban living KARNATAKA MUNICIPAL REFORMS PROJECT 1.
Presented by Telangana Retired engineers forum 11.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
GOVERNMENT OF TELANGANA Irrigation & CAD Department
SOLAR EPC CONTRACTOR COMPANY PROFILE
Mid Day Meal Scheme MDM-PAB Meeting – GUJARAT On
City:- Corporation of City of Panaji
Polavaram Irrigation Project
بازاریابی و بازرگانی زمستان 93.
UGPL INITIATIVE IN SSP Sardar Sarovar (Narmada) Project, Gujarat
PPL1.6 Pumping Plant Project Overview
Virtual Review - #61 by Chief Minister Dt
Presentation transcript:

Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR JONNALABOGUDARESERVOIR Km 234 KALWAKURTHY ACHAMPET CANAL TUNNEL +338.00 YBR SBR +333.84 +407.00 JBR TUNNEL TUNNEL GODIPALLI GATTU RESERVOIR +502.00 1.60 km Under execution

MAHATMA GANDHI (Kalwakurthy) LI Scheme 9 Lift-I Lift Height : 95 M No. of Pumps 5 Nos. Total pumps capacity 150 MW 10 Lift-II 86 M 11 Lift-III 117 M 12 Total Power Required 450 MW

MAHATMA GANDHI (Kalwakurthy) LI Scheme 13 Land Acquisition Required : 12,454 acres Acquired 2,000 acres Requisitioned 6,592 acres 14 Est. Cost for LA Rs.67.50 Crs. 15 Est. Cost for R & R Rs.3.02 Crores 16 Forest Land 369 Acres 17 Mobilisation Advance Paid Recovered 2004-05 74.28 Crs 2005-06 107.39 Crs. 26.78 Crs. Total Rs. 181.67 Crs. Rs.26.78 Crs. 18 Target date for completion 6/2008

MAHATMA GANDHI (Kalwakurthy) LI Scheme Pkg No. Description Awarded Bid Amount Rs. in Crs. 28 Main canal from Singotam to Gudipallygattu and distributaries and field channels between Yelluru to Jonnalabogoda to irrigate 70,000 Ac. M/s. IVRCL-SEW-PRASAD (JV) 249.75 29 Main canal from Gudipallygattu to Kalwakurthy (160 Kms), CM & CD works, distributaries, field channels to irrigate 1,80,000 Acs M/s. MADHUCON PROJECTS LTD. 546.30 30 Branch canal from Gudipalligattu to Achampeta 80 KMS, CM & CD works, distributaries, field channels to irrigate 90,000 Acres 201.40 Lift 1 Execution of Kalwakurthy lift irrigation scheme at Regumangadda, Yellur(V), Kollapur mandal Mahabubnagar Dist. in AP on EPC Basis M/s. Patel Engineering limited 495.20 Lift 2 Execution of Kalwakurthy lift irrigation scheme at Jonnalabogoda village, Peddakothapally Mandal Mahabubnagar Dist. in AP on EPC Basis M/s. Navayuga - WRCL-SEW (JV) 578.036 Lift-3 Execution of Kalwakurthy lift irrigation scheme at Gudipallygattu village, Nagarkurnool Mandal Mahabubnagar Dist. in AP on EPC Basis M/s.Gammon India Limited 631.988 TOTAL 2702.67

MAHATMA GANDHI (Kalwakurthy) LI Scheme Package No. 28 / Cat-I : Earth work excavation and forming embankment and construction of CM & CD works and regulators from Yellur BR to Singotam BR and construction of CM & CD works to irrigate 70,000 acres of KLI scheme. Name of the Contractor : M/s IVRCL – SEW & PRASAD (JV) Agreement Amount : Rs. 249.75 Crores. Agreement Date : 20-03-2005 Period of Completion : 24 Months (8 milestones) Date of completion : 20-03-2005 Investigation : Main canal : Completed Distributary system : Under progress Designs (Canals) : Approved. Structures : 3 Nos. approved against 151 Nos. Execution - main canal : 12.50 KM in length in progress against 36.00 KM Distributaries : 15 Kms Length in progress Structures : 5 Nos. in progress. Qty. of earth work done : 30..00Lakh Cum against 54 Lakh Cum. Expenditure : Rs.77.06 Crs. (Including Mob. advance : Rs.15.49Crs) against Rs.249.75 Crs. Mob. Adv. Recovered : Rs. 15.49 Crs. Land Acquisition : Required 2500 Acres, Proposal submitted : 1090 Acres, Acquired: 730Acres DN & DD : 820 Acres

MAHATMA GANDHI (Kalwakurthy) LI Scheme Package No. 29 / Cat-I : Earth work excavation and forming embankment of Gudipallygattu branch canal and const.of CM & CD works and regulators to irrigate 1,80,000 acres ayacut of KLI scheme (160 KM) Name of the Contractor : M/s Madhucon (P)Ltd. Agreement Amount : Rs. 546.30 Crores. Agreement Date : 19-03-2005 Period of Completion : 24 Months Date of completion : 19-03-2007 Execution : Excavation is in progress in 11Kms length against total of 160Kms Design : 74 Kms length approved against 160 Kms. Investigation Main canal : Completed Distributaries : In progress Structures : In progress Earth work done : 8.0Lakh cum completed against 126 Lakh Cum. Expenditure : Rs. 41.92 Crs. against Rs. 546.30 Crs.( incl. Mob. Adv. Rs. 27.315 Crs) Land Acquisition : Required 5137.00 Acres, Proposal submitted : 1750 Acres DN & DD approved : 300 Acres Bottlenecks : Land acquisition : 5137 Acres required for Canals.

MAHATMA GANDHI (Kalwakurthy) LI Scheme Package No. 30 / Cat-I : Earth work excavation and forming embankment of Achempet branch canal (80 KM) and const.of CM & CD works and regulators to irrigate 90,000 acres ayacut of KLI scheme Name of the Contractor : M/s IVRCL-SEW – PRASAD (JV) Agreement Amount : Rs. 201.40 Crores. Agreement Date : 20-03-2005 Period of Completion : 24 Months (8 milestones) Date of completion : 20-03-2007 Investigation - canal : Completed Distributaries : In progress CM & CD Works : In progress Designs (Structures) : Length in 20 Km approved against 80 Kms. Execution : Excavation in progress in 12.00 KM length against total length of 80 Km Qty. of earth work done : 20 Lakh Cum against 25 Lakh Cum Expenditure : Rs. 51.86Crs. against Rs. 201.40 Crs. (incl. Mob. Adv. Rs. 10.07 Crs.) Mob. Adv. Recovered : Rs. 7.71 Crores. Land Acquisition : Required 2,600Ac Proposals submitted : 674 Acs DN & DD approved : 446Acs Land acquisition : Paid : Rs. 13.23 Crs.

MAHATMA GANDHI (Kalwakurthy) LI Scheme Package No. Lift-I / OC : Execution of Kalwakurthy lift irrigation scheme at Regumangadda ,Yellur(V), Kollapur mandal Mahabubnagar Dist. in AP on EPC Basis Name of the Contractor : M/s Patel Engineering Ltd (JV) Agreement Amount : Rs. 495.20 Crores. Agreement Date : 02-03-2005 Period of Completion : 40 Months Date of completion : 02-07-2008 Investigation (Tunnel, surge pool , Pump house, pressure mains) : Completed Qty. of earth work done : 65,000 Cum against 95,000Cum No. of machinery deployed : 36Nos. (Excavators- 6Nos, Dumers-30Nos.) Cistern : Work commenced Pump House & surge pool : Work commenced Land Acquisition : Required : 1784 Acres; Acquired : proposals submitted Expenditure : Rs. 53.09 Crs. (including Mob. adv,.24.41Crs.) against Rs. 495.20 Crs. Mob. Adv. Recovered : Rs. 1.31 Crs. Land Acquisition : Paid : Rs. 3.00 Crs.

MAHATMA GANDHI (Kalwakurthy) LI Scheme Package No. Lift-II / OC : KLI LIFT-II-Execution of Kalwakurthy lift irrigation scheme at Jonnala Boguda near Khanapur (V), Kodair Mandal, Mahaboobnagar Dist in AP on EPC Basis Name of the Contractor : M/s. Navayuga- IVRCL-SEW (JV) Agreement Amount : Rs. 578.03Crores. Agreement Date : 26-09-2005 Period of Completion : 52 Months (20milestones) Date of completion : 26-01-2006 Investigation (Tunnel, surge pool , Pump house, pressure mains) : In Progress Designs : Agency yet to furnish Earth work : Under progress Expenditure : Rs. 69.408 Crs. Mob. Adv.Rs.55.84Crs against Rs. 578.03 Crs. Mob. Adv. Recovered : Rs. 0.82 Crs.

MAHATMA GANDHI (Kalwakurthy) LI Scheme Package No. Lift-III / OC : KLI LIFT-II-Execution of Kalwakurthy lift irrigation scheme at Gudpally near Gouridevi paly (V), Gopalpet Mandal, Mahaboobnagar Dist in AP on EPC Basis Name of the Contractor : M/s.Gammon India Ltd. Agreement Amount : Rs.631.99Crores. Agreement Date : 26-09-2005 Period of Completion : 52 Months Date of completion : 26-01-2010 Tunnel, Surge pool, Pump house, : Under Investigation. Delivery mains & cistern (Investigation) : Completed Expenditure : Rs. 61.74 Crores (inc. mob. Adv. Rs.48.55Crs) against Rs.631.99 Crores. Mob. Adv. Recovered : Rs. 1.45 Crores.