Marty Olson Oregon Fish and Wildlife The Dalles Screen Shop.

Slides:



Advertisements
Similar presentations
YTAHP Yakima Tributary Access & Habitat Program Update –
Advertisements

Gravel Push-up Dam Removal, Lower North Fork John Day BPA Project A Cooperative Project of: The North Fork John Day Watershed Council & The.
Presented by Michael Jensen John Day Screen Shop Manager.
Space Man Sam: Grammar Mistakes By Aleis Murphy Duke University, Under the direction of Professor Susan Rodger July 2010.
JOHN DAY SCREEN AND PASSAGE PROGRAM: CURRENT ISSUES Presented by Michael Jensen John Day Shop Manager.
The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex.
Wastewater Collection (Sewer Alternatives). Sewer Basics Collection and transport of wastewater from each home/building to the point where treatment occurs.
1 Cost-Effectiveness Screening Issue for RTF August 30, 2007.
First installation of the BullDog™ PVC pipe-to-pipe restraint system occurred on August, Eliminated need for concrete thrust blocking Case History:
Chapter 3 Structural Infrastructure Copyright © 2012 by John Wiley & Sons, Inc. All rights reserved. Introduction to Infrastructure: An Introduction to.
This training was prepared by the U.S. Department of Agriculture (USDA) team of Sarah Librea-USDA Foreign Agricultural Service (Team Leader), Jon Fripp.
Ventricle Chamber Valve Imaging Chamber ECG Machine Aortic Compliance Chamber Buffer Chamber Secondary Compliance Chamber Flow Meter Pressure Sensors DAQ.
Enhancing Agricultural Water Resources at Cal Poly, San Luis Obispo Kevin Piper Director, Agricultural Operations College of Agriculture, Food and Environmental.
River Rainfall Runoff G.W.T Main objectives of the project: Designing the irrigation system for a specific area. The first step is to determine the water.
IOWA STATE UNIVERSITY Department of Civil, Construction and Environmental Engineering Cost Estimate for Different Wind Turbine Technologies Bin Cai Wind.
Sacred Heart Church Owatonna, Minnesota Presentation for Parish Feasibility Study 1.
Pipeline Replacement Project Why we need to replace the force main Silicon Valley Clean Water.
Construction Scheduling and Estimating.  Someone gets an IDEA  The IDEA inspires a PLAN to be created  The PLAN is used to build the SCHEDULE  The.
Project Location: El Chaguite, Yoro District, Honduras Northeastern University’s Student Chapter 1Project: El Chaguite Water System.
5.1.? Student Book © 2005 Propane Education & Research CouncilPage 1 Selecting the pump for a propane dispenser should include a complete understanding.
Open Channel Flow Closed pipe Pump or fan driving force No free surface Open channel Gravity driving force Free surface.
Scientific Method and Measurements Mrs. Steele
PRESENTATION PAPER ON SMALL SCALE IRRIGATION TECHNIQUES ABOUT IRRIGATION INFRASTRUCTURE IN UGANDA BY BYARUHANGA K. GODFREY (COUNTERPART STAFF SIAD PROJECT)
ODFW Fish Screening and Passage Program
22 Jul 2005CSE403, Summer'05, Lecture 12 Lecture 12: Scheduling, Estimation, and Prioritization (Part II) Valentin Razmov.
Low-flow Intake Technical Analysis Zaffar Eusuff Ph: (916) Bay-Delta Office California Department of Water Resources.
The Dalles Cooling Water Strainer At present The Dalles project has installed seven “Hellan” Fluid strainers or what is called on project as main unit.
Types of Positive Barrier Screens  Rotary Drum  Fixed Vertical Plate  Vertical Traveling – belt and panel  Non-Vertical Fixed Plate  Horizontal Fixed.
PICAYUNE STRAND RESTORATION PROJECT PUMP STATIONS PRELIMINARY DESIGN South Florida Water Management District Water Resources Advisory Committee April 6,
Allocation of Conserved Water Program Presented By Dwight French 3.
 Get a piece of paper  Make 8 flash cards  Be ready to take notes over PowerPoint.
Hydraulic Machines Used in Fish Screens September, 2006 Ryan L. McCormick, P.E. Oregon Dept of Fish & Wildlife.
WASHINGTON DEPARTMENT OF FISH & WILDLIFE FISH PASSAGE AND FISH SCREENING STATUS
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
H YDROELECTRICITY. W HAT IS IT ? Hydroelectricity is the term used to refer to electricity generated by water power or ‘hydropower’. The gravitational.
Preparing for Birth Chapter 6.
1 Structural Soil “Olympia Style” Presented on December 3, 2001 Bellvue, WA By: Joe Roush, Urban Forester City of Olympia.
Infrastructure Update RV Travel Park expansion 13 sites exist today Plans developed by Army for 40 site expansion Expansion can be supported by existing.
Water Right Transfers OAR Chapter 690 Divisions 380, 382, 385, 77 CWRE Workshops – October, 2012 Susan Douthit District Analyst.
Micro-hydropower for the home, farm, or ranch: A brief overview
LWC-04 On Whimpey Creek Horizontal Plastic Belt POD Screen.
Laura Capellan 4 th Block.  A radiology technician makes about 52,000 dollars a year  After taxes the monthly income would be 3,340 dollars  Needing.
PAIN ACTION CANADA Update on the national campaign May 21, 2015.
Fire Recovery Facilities –Physics Computing Services is finally able to relocate back into 1301 as of this week. They will probably be completely off of.
FLIGHT CONTROLS AND HYDRAULICS. FLIGHT CONTROLS The flight control systems are mechanical linkages, actuated by conventional controls, and are used to.
Future Perfect Tense Lesson #16 Workbook page: 110.
Early Learning & Vroom in Oregon. Oregon’s Early Learning Hubs: A Community-Based Approach In 2013, the Oregon Legislature passed a statute authorizing.
Post Mid-Term Review and Layout Drawings October 9, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
Bob Edwards Oregon Dept. of Fish and Wildlife.  Is there an existing structure?  What is the integrity of the structure?  Is the location of the structure.
November 2005 READY TO PCS Instructor: xxxx. November 2005 Objectives Develop PCS financial planning and budgeting skills to determine moving expenses.
AIRCRAFT PNEUMATIC SYSTEMS
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Flint Hills Map Exhibit Unit:
Attachment 1-5: Fluid Power Circuit Examples
Troubleshooting Hydraulic Pumps
SBS- Counterweight Support and Magnet Assembly - Status
How to get paid by having Energy Storage
Residential Wall Systems
JGLA Annual Fall Educational Meeting
Field Performance Assessment of
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Select Funding Change for E-Reimbursement
Select Funding Change for E-Reimbursement
Residential Wall Systems
The Decision Making Process
1 Q: Who are we? 4/15/2019.
Presented by Prof.Nachimani Charde
Review 2 Second partial.
Presentation transcript:

Marty Olson Oregon Fish and Wildlife The Dalles Screen Shop

  Unscreened 27cfs Gravity Diversion  Very high priority site  AC power located at the site  Irrigation District has an easement for the canal  Match funding from the local Watershed Council The Perfect Screen Location

  Original Estimate, $142, ($ per CFS)  ODFW $75,000  Applicant $67,000  8 weeks for civil works, steel fab, and installation. Original Budget

 “If it seems too good to be true it probably is” Author Unknown

 Site Conditions  Extremely high water  Additional backfill, geotextile cloth, pumps and labor.  Exceeded civil works budget.  Additional $35,000

 Unanticipated Expenses

 By-Pass Installation

 “Even if you fall on your face, you’re still moving forward” Victor Kiam

 Moving Ahead…

 Ready for Concrete

 Civil Works Finished

 Component Fabrication and Installation

 We’ve Been Victimized!

 “Say you prayers and eat your vitamins, everything will be OK” Hulk Hogan

 Electric power… anyone?

 Hydraulic Drive Complications  Problematic pressure valve  Cylinder alignment Issues  Too complicated to troubleshoot.

 “Mistakes are painful when they happen, but years later a collection of mistakes is what we call experience” Denis Waitley