 AL SALAM STREET UPGRADING C OST CONTROL V IA I NTELLIGENT P LANNING AND D ESIGN F OR GEOGRAPHICAL C HALLENGES February 2010.

Slides:



Advertisements
Similar presentations
Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
Advertisements

CONSTRUCTION DRILLING INC.
CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.
Neighborhood Meeting No.2 Golden Gate Bridge, Highway and Transportation Districts San Francisco Mid-Day Bus Parking Facility Contract No BT-1 March.
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
NEW TOWN HEIGHTS DLF – KAKKANAD WORK PROGRESS REPORT FOR THE MONTH OF MAY 2011 Click to proceed……..
Tunnelling Across a River Using Immersed Tube Tunnelling Click through the slide show to see key stages in creating a tunnel across a river using Immersed.
Project details • New headquarters for HKSB
Chapter 34 Bridge Construction.
Construction Flowchart
Christchurch Town Hall November 27th, Introduction What happened –Settlement –Lateral Spread –Measurements Analysis –Current capacity Repair and.
AFFILIATED ENGINEERS, INC. THE UNIVERSITY OF TEXAS MEDICAL BRANCH (UTMB) AT GALVESTON Presented to Houston Area Association of Hospital Engineering July.
2012 CSVA Conference VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making.
N.C. Department of Transportation Southeastern Rail Highway Safety Conference Presented by Michael J. Shumsky, P.E. NS/CSXT Mainline Grade Separation November.
MAJOR REVISIONS TO THE POLICY FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS Presented By: Mark Attaway March 29, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
SCDOT’s Strategic Direction Janet Oakley Secretary of Transportation South Carolina Alliance to Fix Our Roads September 22, 2014 Janet Oakley Secretary.
Florida State University Parking Analysis. Overview The designated site in question The designated site in question Data observed Data observed The “parking.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
TRENCHLESS TECHNOLOGY
Upgrade 138kV Underground Circuit From Polk to Garrott Substations ERCOT RPG Meeting January 13,
Other Construction Projects
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
Department of Civil Engineering,
Anatomy Terms Orientation and Direction. Superior – towards head Superior – towards head Inferior (caudal) – towards the lower part of a body part Inferior.
Underground Stations Typical Station Site Plan. Underground Stations Ground Conditions: Key Issues.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Mass Highway Department (MHD) Design Process Anticipate possible use of MHD funds Anticipate possible use of MHD funds New Design Guide for Project Development.
Demetrious C. Koutsoftas URS Corporation
October, 2009 MeRHIC Conventional Facilities Al Pendzick October, 2009 Internal Review.
CARSON CITY FREEWAY PHASE 2B-1 PHASE 2 PHASE 2A PHASE 2B.
The BIG DIG Team Summit Topic Presentation April 19th, 2005
Refurbished Booster RF John Reid December 12, 2012.
Recent Construction Sites of Micropiles in Germany Thomas F. Herbst Wessling / Munich Germany 5th IWM 2003 Seattle – Session 2.
Plan Scales (see DOT 1B-3) 22”x34” paper for final designs (preliminary usually ½ size, 11”x17”) 1. Plan view: a) Rural a) 1:1000 plan scale (or 1”=100’)
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
ESD 112 Land Acquisition. Review of Activities to Date Identified a variety of properties Conducted Board presentations/tours Conducted “level 1” due.
Transport Action Ontario Detroit River International Crossing (DRIC): Road Based Infrastructure In the Era of Climate Change.
Asphalt Pavement Association of Indiana Annual Winter Conference Michael B. Cline Commissioner, INDOT December 14, 2010.
City Council Presentation Progress Report No. 12 For September 2006 November 6, 2006.
Deep Residential Basement, Chelsea. Toureen Plant Toureen Plant Toureen Contractors City Basements Groundworks RC Frames Groundworks RC Frames Petrol.
Expo Line Transit Project Exposition Light Rail Transit Project Expo Board Presentation Monthly Project Status Update October 2, 2008.
Museum of Islamic Art Project Package # 3 Site Logistics and Progress Presentation.
Siting/Conventional Facilities Jonathan Hunt PIP-II Machine Advisory Committee 9 March 2015.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
بسم الله الرحمن الرحیم. Jet grouting.
Micropiles and self drilling rods in soil and rock engineering
Temporary Works – P8 Project Practice.
5th Street Bridge Replacement Project Contract No
A. Datum Corporation Bid package overview
I-84 Waterbury Project Project Overview July 2017.
LSST PROJECT PHASE #2 BASE FACILITY AND DATA CENTER CONSTRUCTION
CT Reinforced Earth Structures
A. Datum Corp. Bid package overview.
Diaphragm Wall Construction Long sections of the cut and cover use diaphragm walls to support the sides of the open excavation, while work on the.
SE 12th Street Roadway Improvements February 8, 2005.
Presenter Tony Bosnich Oct 2015
REVISION 2 Basement 1.
Contract 60X10 Informational Meeting Weber I-55
An Introduction to Subway Construction Technology
Minuteman Vocational Technical Regional High School Progress
Harbour Island Force Main Replacement
Commissioners Presentation
Utility Relocation: 11th/Mill
November Bond Election
Presentation transcript:

 AL SALAM STREET UPGRADING C OST CONTROL V IA I NTELLIGENT P LANNING AND D ESIGN F OR GEOGRAPHICAL C HALLENGES February 2010

 Contract 1 Contract 5001 Contract 4 Contract 3 

Introduction Part 1 Part 2 Part 3 Louis Berger, Abu Dhabi Program Manager

 Louis Berger, Abu Dhabi Program Manager SUMMARY Department of Municipal Affairs Abu Dhabi Municipality Employer Samsung – Saif Bin Darwish JVContractor Parsons International LtdConsultant Dhs 3,105, 000,208.10Original Contract Value Dhs 3,111,864,476.16Estimated Contract Value to date May 15, 2008Start Date October 31 st, 2010Completion Date 900 daysConstruction Period 50% % Work Performed 54.4% % Work Planned PART 1 DESIGN P ROJECT D ESCRIPTION M ONTHLY E XECUTIVE R EPORT – S EPTEMBER 2009

 Louis Berger, Abu Dhabi Program Manager PHYSICAL PROGRESS Section 1 Base Slab and Excavation Works PART 1 DESIGN

 Louis Berger Group, Abu Dhabi Program Manager

 Louis Berger, Abu Dhabi Program Manager

 Louis Berger, Abu Dhabi Program Manager

 Louis Berger Group, Abu Dhabi Program Manager PROGRESS STATUS SECTION 1 TO 4

 Louis Berger Group, Abu Dhabi Program Manager PROGRESS STATUS SECTION 1

 Louis Berger Group, Abu Dhabi Program Manager PROGRESS STATUS SECTION 2

 Louis Berger Group, Abu Dhabi Program Manager PROGRESS STATUS SECTION 3

 Louis Berger Group, Abu Dhabi Program Manager PROGRESS STATUS SECTION 4

 Louis Berger, Abu Dhabi Program Manager DIAPHRAGM WALLSTYPES OF DIAPHRAGM WALLS SIMPLE DIAPHRAGM WALLS DIAPHRAGM WALLS WITH GROUTED GROUND ANCHORS (WHERE ADJACENT BUILDINGS ARE FAR AWAY ) DIAPHRAGM WALLS WITH STRUTS (WHERE ADJACENT BUILDINGS ARE CLOSER TO THE TUNNEL ) DIAPHRAGM WALLS WITH JET GROUTED ANCHORS (WHERE UTILITIES ARE RUNNING PARALLEL TO THE TUNNEL)

 Louis Berger, Abu Dhabi Program Manager JET GROUTING TYPES OF JETGROUTED EXCAVATION SUPPORT SYSTEMS JETGROUTED DIAPHRAGM WALLS WITH JETGROUTED ANCHORS JETGROUTED DIAPHRAGM WALLS WITH JETGROUTED ANCHORS + GROUTED GROUND ANCHORS JETGROUTED DIAPHRAGM WALLS WITH GROUTED GROUND ANCHORS

 Louis Berger, Abu Dhabi Program Manager WATER PROOFING WATER PROOFING SYSTEM USED IN THE PROJECT

 Louis Berger, Abu Dhabi Program Manager UTILITY ROOMS UTILITY ROOMS ALONG THE TUNNEL

 Louis Berger, Abu Dhabi Program Manager RESTRICTED SITE ACCESS RESTRICTED SITE ACCESS DUE TO BUILDINGS AT CLOSE PROXIMITY

 Louis Berger, Abu Dhabi Program Manager RESTRICTED SITE ACCESS RESTRICTED SITE ACCESS DUE TO BUILDINGS AT CLOSE PROXIMITY NO OR LIMITED ACCESS

 Louis Berger, Abu Dhabi Program Manager UTILITY BRIDGES UTILITY BRIDGES FOR UTILITIES CROSSING THE TUNNEL

 Louis Berger, Abu Dhabi Program Manager UTILITY BRIDGES UTILITY BRIDGES FOR UTILITIES CROSSING THE TUNNEL UTILITY BRIDGES

 Louis Berger, Abu Dhabi Program Manager UTILITY BRIDGES UTILITY BRIDGES FOR UTILITIES CROSSING THE TUNNEL

 Louis Berger, Abu Dhabi Program Manager COMPLEXITY COMPLEXITY IN CONSTRUCTION – SECTION 3 & 4 TUNNEL UTILITY CORRIDOR EXISTING 400 KV CABLE

 Louis Berger, Abu Dhabi Program Manager COMPLEXITY COMPLEXITY IN CONSTRUCTION – SECTION 2

 Louis Berger, Abu Dhabi Program Manager COMPLEXITY COMPLEXITY IN CONSTRUCTION – SECTION 2

 St. No.2 St. No.4 St. No.5St. No.7St. No.9 St. No.11St. No.13 Louis Berger, Abu Dhabi Program Manager TRAFFIC MANAGEMENT COMPLEXITY IN TRAFFIC MANAGEMENT LIVE TRAFFIC TEMP. PAVEMENT WORKS UTILITY RELOCATION WORKS PERMANENT CONSTRUCTION

 St. No.2 St. No.4 St. No.5St. No.7St. No.9 St. No.11St. No.13 Louis Berger, Abu Dhabi Program Manager TRAFFIC MANAGEMENT COMPLEXITY IN TRAFFIC MANAGEMENT LIVE TRAFFIC TEMP. PAVEMENT WORKS UTILITY RELOCATION WORKS PERMANENT CONSTRUCTION

 St. No.2 St. No.4 St. No.5St. No.7St. No.9 St. No.11St. No.13 TRAFFIC MANAGEMENT COMPLEXITY IN TRAFFIC MANAGEMENT Louis Berger, Abu Dhabi Program Manager LIVE TRAFFIC TEMP. PAVEMENT WORKS UTILITY RELOCATION WORKS PERMANENT CONSTRUCTION

 St. No.2 St. No.4 St. No.5St. No.7St. No.9 St. No.2 St. No.4 St. No.5St. No.7St. No.9 St. No.11St. No.13 TRAFFIC MANAGEMENT COMPLEXITY IN TRAFFIC MANAGEMENT Louis Berger, Abu Dhabi Program Manager LIVE TRAFFIC TEMP. PAVEMENT WORKS UTILITY RELOCATION WORKS PERMANENT CONSTRUCTION

 St. No.2 St. No.4 St. No.5St. No.7St. No.9 St. No.2 St. No.4 St. No.5St. No.7St. No.9 St. No.11St. No.13 TRAFFIC MANAGEMENT COMPLEXITY IN TRAFFIC MANAGEMENT Louis Berger, Abu Dhabi Program Manager LIVE TRAFFIC TEMP. PAVEMENT WORKS UTILITY RELOCATION WORKS PERMANENT CONSTRUCTION

 St. No.2 St. No.4 St. No.5St. No.7St. No.9 St. No.2 St. No.4 St. No.5St. No.7St. No.9 St. No.11St. No.13 TRAFFIC MANAGEMENT COMPLEXITY IN TRAFFIC MANAGEMENT Louis Berger, Abu Dhabi Program Manager LIVE TRAFFIC TEMP. PAVEMENT WORKS UTILITY RELOCATION WORKS PERMANENT CONSTRUCTION

 Louis Berger, Abu Dhabi Program Manager CAVITY ISSUE JET GROUTED CUT OFF WALL WITH SECANT PILES FOR RESOLVING CAVITY ISSUES POSSIBLE CAVITY AREA DIAPHRAGM WALL JET GROUTED CUTTOFF WALL SECANT PILES

 Louis Berger, Abu Dhabi Program Manager CAVITY ISSUE JET GROUTED CUT OFF WALL WITH SECANT PILES FOR RESOLVING CAVITY ISSUES