How to Plan and Implement Effective Project Deployments Eric Andrus HP Services (916)748-9476

Slides:



Advertisements
Similar presentations
MIGRATION MIGR-09. How to Run Your Next Implementation... Don't Let It Run You! Patricia Johnson Senior Systems Consultant Strategic Systems Group, Inc.
Advertisements

Program Management Office (PMO) Design
STUNBICH STUNBICH INVESTMENT LIMITED ADVANCED LOGISTICS AND PROCUREMENT SERVICES RC:
ITIL: Service Transition
System Analysis and Design
Network Design and Implementation
Chapter 14 Network Design and Implementation. 2 Network Analysis and Design Aspects of network analysis and design Understanding the requirements for.
Selecting and implementing hospitality information systems
GAI Proprietary Information
Chapter 20 Introduction to Systems Development and Systems Analysis Copyright © 2012 Pearson Education 20-1.
1 Fundamental Principles of Solution Design and Implementation Chapter 3.
Supply Chain Management
Health Informatics Series
Professor Michael J. Losacco CIS 1150 – Introduction to Computer Information Systems Systems Analysis and Design Chapter 12.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
The Analyst as a Project Manager
Development Processes and Product Planning
SAM for Non-production Environments Presenter Name.
Cross-Docking Distribution Center (DC)
IN THE NEW PARADIGMS OF BUSINESS MANAGEMENT. ENTERPRISE RESOURCE PLANNING What is ERP? Business Challenges Today Why purchase an ERP solution ? Intway.
Development and Quality Plans
Centers for IBM e-Business Innovation :: Chicago © 2005 IBM Corporation IBM Project Management May 2006.
Effective Methods for Software and Systems Integration
Chapter 10.
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
1 CAPACITY BUILDING AND TRAINING ON PROCUREMENT Session 9 – The World Bank Procedures for IT Procurement September 21, 2005 by Arif Hassan.
SYSTEMS DEVELOPMENT Phases, Tools, and Techniques
Managing Offshore Software Development Projects Presented by Orlando Moreno Phone: web:
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
System Planning- Preliminary investigation
Understanding Information Systems. Information System (IS) An IS is a combination of people, hardware, software, computer networks, and data that organizations.
Chapter 2 Needs Identification. 2 Learning Objectives Review the project life cycle –identifying needs –proposing a solution –performing the project –terminating.
Software Quality Assurance Activities
From Research Prototype to Production
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
Module CC3002 Post Implementation Issues Lecture for Week 1 AY 2013 Spring.
10 Years of IT Service Management Cornelis A. Winkler Prins senior consultant & partner Service Management Partners, Inc.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Industry SDLCs and Business Climate. Justin Kalicharan Credentials Director and Senior Technology Officer Over 14 years of coding experience in various.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Explain why the global market is important.
An Integrated Control Framework & Control Objectives for Information Technology – An IT Governance Framework COSO and COBIT 4.0.
Information Technology Project Management Buying Packaged Software: RFPs and Vendor Selection.
Computer Calamities The University of California Berkeley Extension Copyright © 2007 Patrick McDermott Field, Tom, “When Bad Things.
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
NETE Computer Network Analysis and DesignSlide 1 Documenting Network Design NETE-4635 Computer Network Analysis and Design.
3 1 Project Success Factors u Project management important for success of system development project u 2000 Standish Group Study l Only 28% of system development.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Group HR 1 Tata Motors GEMS – Operations Session 7 : 20 th of November 2012 Logistics and 3PL.
Systems Integration Project (SIP) Southeastern Pennsylvania Chapter November 6, 2002.
Oktalia Juwita, S.Kom., M.MT. SYSTEMS DEVELOPMENT Dasar-dasar Sistem Informasi – IKU1102.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Global Opportunities Glencoe Entrepreneurship: Building a Business Global Entrepreneurship Ways to Enter the Global Market 4.1 Section 4.2 Section 4 4.
Chapter 12 The Network Development Life Cycle
Chapter 6 SYSTEMS DEVELOPMENT Phases, Tools, and Techniques.
Requirements in the product life cycle Chapter 7.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Accounting systems design & evaluation 9434SB 18 March 2002.
Best Practices for Conducing and Evaluating a TMS RFP Chris Norek, Ph.D., Senior Partner, Chain Connectors, Inc.
1 ITOM 6.2 Data Center Migrations Tricks of the Trade Andy Abbas Co-Founder and VP.
ITEC 275 Computer Networks – Switching, Routing, and WANs
ITIL: Service Transition
Management Information Systems
Systems Analysis and Design in a Changing World, 4th Edition
Information Systems Selection
ENTERPRISE BUSINESS SYSTEMS
Case Study on Selection of a Work and Asset Management System
Systems analysis and design, 6th edition Dennis, wixom, and roth
Systems analysis and design, 6th edition Dennis, wixom, and roth
Today’s Agenda Dealing with Vendors Consultants Contracts
Presentation transcript:

How to Plan and Implement Effective Project Deployments Eric Andrus HP Services (916)

Presentation Objectives 1.Deployment RFPs and what to look for in a service provider 2.How to efficiently deploy solutions to multiple sites and/or countries 3.How to avoid common deployment pitfalls

What is a Request for Proposal (RFP)? A Request for Proposal (RFP) is a document for helping a prospective purchaser define the needs and requirements of a project. Deployment services “The RFP step child” What makes a good deployment RFP and why should I write one? Keep it simple and clear (overview/scope/timeframe/deliverables/etc.) Detailed roles and responsibilities and the level of service required Any special legislative or other governing requirements that might exist Explain the project assumptions A well written RFP will save you headaches and money If all else fails, pay someone to write it for you. Gartner - The ABCs of RFPs -- Know Them, Use Them (Sep. 2001) RFP Planning

Selection process – Formal evaluations (use RFP teams) – Conduct presentations and use a checklist – Do your homework (customer references and read appropriate white papers) What to look for? (list these in your RFP) – Relationship including the senior executive relationship – Quality – Price – Experience and tools – Market Share – Contingency planning “Show me a perfectly deployed project and I will show you a project you don’t know much about.” Choosing the Right Deployment Vendor

Don’t forget the Project Manager Do I need a project manager just to manage the deployment? Clearly identify the role of the vendor project manager Should the project manager be certified? The Seven Deadly Sins 1.Mistaking half-baked ideas for viable projects 2.Dictating unrealistic project deadlines 3.Assigning underskilled project managers to high-complexity projects 4.Not ensuring solid business sponsorship 5.Failing to break projects into manageable "chunks" 6.Failing to institute a robust project process architecture 7.Not establishing a comprehensive project portfolio to track progress of ongoing projects “The project is only as good as your Project Manager.” Selecting the Right Project Manager

Set realistic timelines and schedules Use multiple vendors if appropriate Create a project team with the vendor Clear documented instructions Contingency plans Ramp up your Help Desk Scheduling and Coordinating the Rollout Forty percent of IT projects are canceled before completion. Thirty-three percent of the remaining projects are "challenged" by cost/time overruns or changes in scope. Together, failed and challenged projects cost U.S. companies and government agencies an estimated $145 billion a year. Train your users Have a next day support process Dedicate your deployment resources Review the project reports carefully Implement a clear Change Management process Test the tools (pilots) The costs of poor planning Points to remember

Pilots Pilot, Pilot, Pilot Many project failures can be traced back to poor, or no, project pilots. Pilots will test the assumptions on which your deployment strategy was built and verify that they are still applicable. A well developed pilot is an invaluable tool for refining your project instructions, installation processes, scripts and user acceptance. Three easy steps to piloting 1.Develop a pilot strategy and decide what you are trying to test. 2.Rollout the pilot on a limited scale or timeframe to gather the necessary data to justify your deployment plans. 3.Learn from the pilots. Understand what worked and quantify the results.

When does it make sense to pre-integrate my systems? Multiple site/country deployments Must minimize user and/or site disruption High need for solution consistency Need a controlled staging environment Typical services available Shipping logistics and customs documentation Supply chain integration with manufacturing Hardware integration and software loads System labeling and cabling Benefits of pre-integration Risk reduction Faster time to market Reduced implementation costs Integration and Staging

Questions you will need to answer Should I outsource or use in-house teams? Roaming or regional installers? What time of day/week should I install? How much can the users do? How long will each installation take? Issues to address Site preps Coordinating the shipment and storage of the new hardware Level of qualification of the installers Help Desk Handling reschedules Legacy system disposal On-site Installation

How do I get my systems overseas? Select a vendor familiar with international deployments Hire a consultant (mistakes can land you in jail) Know the tricks of the trade Choose a Freight Forwarder experienced with IT equipment Understand country restrictions (pre-loaded software) Patience is a virtue Plan for delays Customs, VA taxes and tariffs Country/Region Specific Issues

Things I have learned Every deployment project has problems, so plan for them Domino effects can kill your project Don’t discount the importance of the project manager Detail the roles and responsibilities for each vendor Listen to vendor suggestions The CIO Best Practice Exchange Best Practice Sharing

Information about Hewlett Packard deployment services can be found at: Available Services Volume Deployment Factory Integration Onsite Installation Project Management Relocation Management HP services

Questions