25-Oct-2013 Upgrades Week “Muon plans for the Phase 2 TP” J. Hauser, UCLA  Phase 2 muon plans (presented at ECFA),  What’s new since Upgrade Week  New.

Slides:



Advertisements
Similar presentations
USCMS Collaboration Meeting, Boulder, CO, May 17, 2012 (via EVO)
Advertisements

Proposal for a new design of LumiCal R. Ingbir, P. Ruzicka, V. Vrba October 07 Malá Skála.
Level-1 Trigger CMS Week, Brussels 14 Sep C.-E. Wulz Deputy Trigger Project Manager Institute of High Energy Physics, Vienna Prepared with slides/material.
13-Feb-2014 Phase 2 upgrade “ME0 stack options” J. Hauser, UCLA  In Shashlik and CFCAL HE designs, space of  z~30 cm exists behind 10 lambda for muons.
1 Run 9 PHENIX Goals and Performance John Haggerty Brookhaven National Laboratory June 4, 2009.
Status of the ATLAS MM project
1 News and Miscellaneous UPO May Didier Contardo, Jeff Spalding -Phase 2 Scope and Cost exercise.
1 Dayabay RPC Detector Zhang Jiawen Outline  Motivation  RPC introduce  RPC for Daya Bay  Efficiency and noise  Module structure  Module.
CMS Phase 2 Upgrade: Scope and R&D goals CMS Phase 2 Upgrade: Scope and R&D goals October 21, 2014 Jeremiah Mans On behalf of the CMS Collaboration.
Upgrading the CMS simulation and reconstruction David J Lange LLNL April CHEP 2015D. Lange.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
Silicon Tracking for Forward Electron Identification at CDF David Stuart, UC Santa Barbara Oct 30, 2002 David Stuart, UC Santa Barbara Oct 30, 2002.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
The CMS Upgrade Program ECFA High Luminosity LHC Experiments Workshop Aix-les-Bains, October 1, 2013 J. Spalding, on behalf of the CMS Collaboration 1.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Reviews o Document to RRB o DESY week.
T. Kawamoto1 Small Wheel upgrade project Muon week, upgrade meeting T. Kawamoto.
Workshop 24 Jun 11 AB Workshop on GEMs for CMS high  Last September’s workshop showed that MPGD technology is now mature. Stable operation of large area.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Muon Detector Jiawen ZHANG Introduction The Detector Choices Simulation The structure and detector design The Expected performance Schedule.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
PHENO 2010 Christopher White, IIT 1 The Daya Bay Reactor Antineutrino Experiment Christopher White 1.
1 News and Miscellaneous UPO Mar Didier Contardo, Jeff Spalding o General news o ESP and Manpower needs o Cost scale for phase 2 o June Upgrade.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
ATLAS micromegas activities (MAMMA)
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
1 News and Miscellaneous UPO Apr Didier Contardo, Jeff Spalding News from Oct. RRB HL-LHC Pile-up for simulation Upcoming events: DESY week – Taipei.
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
Phase 2 muon plenary, 11-Feb-2015 Jay Hauser  Based on three main arguments:  Age/reliability  Radiation tolerance  Maintainability  Bonus: L1 trigger.
RPC Trigger Electronics Review Subjects: Link System Low Voltage Link System Upgrade Krzysztof Doroba, University of Warsaw Krzysztof Doroba, RPC TRigger.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
TMB-to-MPC Trigger Data Format Changes related to GEM US CMS EMU Workshop Vadim Khotilovich, Texas A&M University.
CERN-Korea Committee 1 CMS report. CMS publications 2 Pub rate steady, ~2.5/week 391 papers submitted: +23 CRAFT based +25 ready for CWR or later +6 PubDraft.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
L1 Global Muon Trigger Simulation Status URL of this presentation:
+ GE2/1 Case Considerations Alexei Safonov. + CMS Muon Upgrades CMS Technical Proposal in its part related to muon systems lists following: MEX/1 electronics.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
1 Towards Phase 2 TP releases 2013 Didier Contardo, Jeff Spalding Status of current simulations studies and ongoing issues Needs for TP preparation.
DT UPGRADE STRATEGY M.Dallavalle for the DT Collaboration 6/26/12 Muon IB1.
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
Muon Upgrade Simulations Status. Muon Upgrade Goals  Muon upgrades aim to achieve the following:  Sustain triggering at current thresholds up to |h|=2.4.
Effects of Endcap Staging/Descoping D.Acosta University of Florida.
27-Jan-2014 Upgrade Steering Group “Update on Phase 2 TP - muons” J. Hauser, UCLA  Update on progress for TP:  2 slides follow to be shown at USG02 (Upgrade.
GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping 1  Recall descoping scenarios for 235 and 200 MChF:  Tiziano:
Phase-2 Muon Performance Projections and Evaluation D. Abbaneo, M. Abbrescia, E. Barberis, C. Bedoya, M. Dallavalle, J. Hauser, K. Hoepfner, V. Khotilovich,
RPCs with Ar-CO2 mix G. Aielli; R.Cardarelli; A. Zerbini For the ATLAS ROMA2 group.
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Muon Upgrade Simulations Status Alexei Safonov Texas A&M University.
News and Misc UPO Meeting Jan 16, 2012
UPO meeting Nov. 29, 2013 D. Contardo, J. Spalding News
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Gas Detectors (GEM) The 6th Egyptian school for high energy physics
SLHC Muon Upgrades and Impact on Trigger
Japan Participation in Phase-II TDAQ Upgrade
Third Workshop on GEMs for CMS
for the transition region on behalf of the RPC upgrade group
Status of Full Simulation for Muon Trigger at SLHC
Not baseline: ASIC, DCFEB R&D if L1A latency > 10 ms
Why Micromegas? Muon Upgrade Workshop, 27/01/2012 Jörg Wotschack.
Francesco Forti University and INFN, Pisa
Anna Colaleo - INFN-Bari On behalf of the CMS Muon group
ATLAS Muon Spectrometer and
Changes in Level 1 CSC Trigger in ORCA by Jason Mumford and Slava Valuev University of California Los Angeles June 11,
Phase 2 R&D – Brief Introduction –
Presentation transcript:

25-Oct-2013 Upgrades Week “Muon plans for the Phase 2 TP” J. Hauser, UCLA  Phase 2 muon plans (presented at ECFA),  What’s new since Upgrade Week  New upgrade management (presented today at MB)  Organizing to write the muon section of the Phase 2 TP 1

25-Oct-2013 Upgrades Week “Muon plans for the Phase 2 TP” J. Hauser, UCLA Three main aspects: 1. Aging studies, replacement  GIF++ tests for CSC and RPC chamber aging, DT components  Freon replacement for RPC gas after LS3  DT minicrate replacement 2. Forward muon trigger and redundancy  GE1/1 and GE2/1 based on improved L1 trigger, redundancy in the most intense region  RE3/1 and R4/1: timing for background rejection and PU mitigation 3. Forward muon tagging extension (ME 0 )  Large eta coverage (~ ) for big acceptance, S/N boosts in modes with muon  Hermeticity for modes excluding muons

25-Oct-2013 Upgrades Week “Muon plans for the Phase 2 TP” J. Hauser, UCLA  Proposed at ECFA workshop

25-Oct-2013 Upgrades Week “Muon plans for the Phase 2 TP” J. Hauser, UCLA  If endcap calor not replaced, propose GE1/1 as envisioned in LS2  Endcap calor replacement: now in detailed engineering discussions  Space will likely be available for ME0  Is it the “ME0” we are used to? (eta>2.1 for muon tagging, ~6 layers)  Or is it “ME0/1” and “ME0/2” where the latter covers 1.6<eta<2.4 and has more lever arm to ME1/1 than GE1/1?

25-Oct-2013 Upgrades Week “Muon plans for the Phase 2 TP” J. Hauser, UCLA  Pros:  More trigger lever arm than GE1/1, could be more than 2 layers  Could match precisely to eta=2.4 boundary of ME1/1  Can seek an “integrated” solution, more cost-effective?  Cons:  No opportunity to install in LS2  Could suffer neutron “leakage” from higher eta or higher punch- through from jets than GE1/1

23-Oct-2013 Upgrades Week “Towards the muon part of the Phase 2 TP” J. Hauser, UCLA 6  The leading motivation is to improve muon triggering in this region  Rate reduction from bending angle and increased efficiency from added redundancy

23-Oct-2013 Upgrades Week “Towards the muon part of the Phase 2 TP” J. Hauser, UCLA 7  “Close” chambers have worse separation, still pretty good  Bending angle works well in ME 0 to reduce trigger rate close far Tools used: fast simulation with CSC sim hits — propagate CSC sim to GEM layer — emulate detector channel resolution — compute bending angle New simulation results (Krutelyov)

23-Oct-2013 Upgrades Week “Towards the muon part of the Phase 2 TP” J. Hauser, UCLA  Presented today at MB  There is a muon phase 2 “box” in the organization chart  Responsible to upgrade management  IMO, should also be responsible to muon IB  This is not a permanent structure, it is intended for converging on the TP plans and document (to be submitted to the RRB in Fall 2014)  Longer-term muon management structure, including the Phase 2 upgrade:  Subject of discussion, SP-elect does not want to jeopardize LS1 upgrade and subsequent commissioning  Will discuss this at the muon IB in December with the SP-elect

23-Oct-2013 Upgrades Week “Towards the muon part of the Phase 2 TP” J. Hauser, UCLA  From MB176 today:

25-Oct-2013 Upgrades Week “Muon plans for the Phase 2 TP” J. Hauser, UCLA  Muon responsible(s?) in the upgrade organization need to be selected, and form a sub-organization  Should coordinate with muon PMs and IB  Participate in TC meetings – endcap replacement discussions  Engineering studies – define muon endcap “envelope”  Internal costing review(s)  Decisions on which muon items to be proposed  All will be carefully reviewed by LHCC - need excellent motivation  Drafting the TP muon section (first draft due by Mar. 31)