Life-Cycle Cost Analysis (LCCA) of Buildings

Slides:



Advertisements
Similar presentations
LCC YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT.
Advertisements

Capital Budgeting Chapter 12. Capital budgeting: process by which organization evaluates and selects long-term investment projects – Ex. Investments in.
INVESTMENT ANALYSIS OR CAPITAL BUDGETING. What is Capital Budgeting? THE PROCESS OF PLANNING EXPENDITURES ON ASSETS WHOSE RETURN WILL EXTEND BEYOND ONE.
Capital Budgeting Processes And Techniques
Capital Budgeting Decisions
© Mcgraw-Hill Companies, 2008 Farm Management Chapter 17 Investment Analysis.
Capital Budgeting. FIN 591: Financial Fundamentals/ValuationSlide 2 Typical Capital Budgeting System.
Chapter 3 Program Management and Project Evaluation Professor Hossein Saiedian McGraw-Hill Education ISBN
Life cycle costing New 490 | CCE 491/591. Outline Intro to life cycle costing and importance to green design Examples Tools for your projects.
©A. Ward 2002 Capital Expenditure Appraisal Cash Flow - revisited Accounting Rate of Return Payback Period DCF Techniques Net Present Value Sensitivity.
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 26-1 CAPITAL BUDGETING Chapter 26.
EGR Evaluation Alternatives Present Worth Analysis Companies constantly evaluate whether or not to pursue projects. Mutually Exclusive Projects.
Copyright © 2012 Pearson Prentice Hall. All rights reserved. Chapter 10 Capital Budgeting Techniques.
Chapter 10 - Capital Budgeting
Chapter 4. Economic Factors in Design The basis of design decisions will be economics. Designing a technically safe and sound system will be only part.
Using of cash flow for the financial stability and causes for changes in the amount of financial means, for the short-term planning of incomes and expenses,
Chapter 17 Investment Analysis
Castellanza, 20 th October and 3 rd November, 2010 FINANCIAL INVESTMENTS ANALYSIS AND EVALUATION. Corporate Finance.
Capital Budgeting and Cost Analysis
EE535: Renewable Energy: Systems, Technology & Economics
CAPITAL BUDGETING AND LEASING Chapter 4. Investment The addition of durable assets to a business Disinvestment is the withdrawal of durable assets from.
Finance Competency For CFM Exam. Overview Operating & Capital Budgeting General Financial Concepts Management Accounting Principles Procurement Life Cycle.
 Life cycle costing, LCC, is the process of economic analysis to asses the total cost of ownership of a product, including its cost of installation,
BUSINESS ECONOMICS Class 6 1 and 2 December, 2009.
Present Worth Analysis Lecture No.15 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Capital Budgeting Chapter 9 © 2003 South-Western/Thomson Learning.
Capital Budgeting FIN 461: Financial Cases & Modeling
(c) 2001 Contemporary Engineering Economics 1 Chapter 7 Present Worth Analysis Describing Project Cash Flows Initial Project Screening Method Present Worth.
Chapter 8 – Net Present Value and Other Investment Criteria
© 2010 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible Web site, in whole or in part.
Leasing Chapter 27 McGraw-Hill/Irwin
4 C H A P T E R Capital Investment Decisions.
9-0 Net Present Value and Other Investment Criteria Chapter 9 Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Summer Time Value of Money Session 2 07/02/2015.
Capital Budgeting Decisions. What is Capital Budgeting? The process of identifying, analyzing, and selecting investment projects whose returns (cash flows)
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
AT Benefit Cost Analysis Model Highway Design, Project Management and Training Section Technical Standards Branch Presented by Bill Kenny, Director: Design,
Long-Term (Capital Investment) Decisions
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 26 Capital Investment Decisions
Economic Evaluation of PV systems in Jordan
Capital Budgeting Decisions
$$ Entrepreneurial Finance, 5th Edition Adelman and Marks 10-1 Pearson Higher Education ©2010 by Pearson Education, Inc. Upper Saddle River, NJ Capital.
Energy Economics A synthetic methane plant from coal is to be constructed at a cost of $4 billion dollars. It requires 14,000 tons/day of coal (10,000.
Introduction to Economic Analysis Part 1 February 10, 2014.
IB Business and Management
Phoenix Convention Center Phoenix, Arizona Introduction to Life-Cycle Cost Analysis Agency Energy ManagerLife-Cycle Cost Methodology Mike Mills, CPA, BEP.
Capital Budgeting The Capital Budgeting Decision Time Value of Money Methods of Capital Project Evaluation Cash Flows Capital Rationing The Value of a.
0 CHAPTER 10 Long-Term (Capital Investment) Decisions © 2009 Cengage Learning.
$$ Entrepreneurial Finance, 4th Edition By Adelman and Marks PRENTICE HALL ©2007 by Pearson Education, Inc. Upper Saddle River, NJ Capital Budgeting.
Cost Management.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Discounted Cash Flow Analysis Lecture.
Life-cycle cost analysis (LCCA)
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Engineering Economic Decisions Lecture.
LCCA Life-Cycle Cost Analysis Group 3A. Introduction “Life-cycle cost analysis (LCCA) is a method for estimating the total cost of ownership of a building,
Confidential & Proprietary Internal Kaplan Use Only. CAPITAL PROJECT ANALYSIS Unit 7.
Capital Budgeting Techniques
Copyright © Houghton Mifflin Company. All rights reserved.1 Financial & Managerial Accounting 2002e Belverd E. Needles, Jr. Marian Powers Susan Crosson.
Capital Budgeting Techniques. Capital budgeting is the process of evaluating capital projects, projects with cash flows over more than one year. The four.
Chapter 5 Present-Worth Analysis. 2 Loan versus Project Cash Flows Initial Project Screening Methods Present-Worth Analysis Methods to Compare Mutually.
Chapter 6 Annual Equivalent Worth Criterion. Chapter 6 Annual Equivalence Analysis  Annual equivalent criterion  Applying annual worth analysis  Mutually.
Assistant Professor Antti Peltokorpi
Chap 6 MAINTENANCE & LIFE CYCLE COST
Process Economics Factors that affect profitability
Chapter 7 Present Worth Analysis
Capital Budgeting and its Techniques
Time Value of Money & Cash Flow Estimation Prepared By Toran Lal Verma
Managerial Accounting 2002e
What Finance Brings to the Table & What Finance Needs from Your Area
Presentation transcript:

Life-Cycle Cost Analysis (LCCA) of Buildings Group 3c: Kalle Sinisalo Tuomo Pehkonen Jarmo Romo Laura Tolvanen Jere Raunama Kalle Vainikka

Life-Cycle of a Building The lifespan of a property or a building from its design and development until its disposal: Concept planning Design Construction Operations Replacement or Disposal

Life-Cycle Costs (LCC) Initial costs - Purchase, Acquisition, Construction costs Fuel Costs Operation, Maintenance and Repair Costs Replacement Costs Residual Values - Resale or Salvage Values or Disposal Costs Finance Charges - Loan Interest Payments Non-Monetary Benefits or Costs

Life-Cycle Cost Analysis (LCCA) “An economic evaluation method for determining the most cost- effective option out of competing alternative.”

Origin Came popular in the 1960’s. US government agencies began implementing to improve cost effectiveness of buildings and equipment procurement. Usage has spread around the business world for project evaluation and management accounting.

LCCA of Buildings Compares execution options Technically equally appropriate Different costs Takes into account the whole life-cycle of a building Implemented early on, during concept planning and design Radical changes possible Main purpose is cost-efficiency, not environmental effects Extent of study may vary

Tools Calculation software Process manuals, guidelines, principles Reduce time and effort Computation Documentation Process manuals, guidelines, principles Depending on preferences and interests of companies and agents Results are a collection of alternatives Comparing options for most cost-effective result Uncertainty of input values has an effect on the outcome values

Methods Pay-back Discounted pay-back Many quantitative techniques have been developed for analyzing life cycle costing of a building. These techniques can be used as a guide in choosing between alternative options in design Optimal solutions are often something in between these two main categories Pay-back This is one of the most used and trusted method because of its simplicity in calculations and interpretation. Used measure in this method is simply time it takes for return of initial investment Discounted pay-back In discounted pay-back method we consider time-value of money. This means that value of given sum changes over time. For example 100$ today is more valuable than 100$ in 5 years.

Methods Net present value (NPV) Method of net present value revolves around calculating NPV for every mutually exclusive investment choice

Processes

Steps Identify Alternatives Define Constant Parameters Identify Costs Consider alternatives which bring value for each project participant and end user Define Constant Parameters Time period and discount rate Identify Costs Operating expenditures (OPEX) and Capital expenditures (CAPEX) Generate LCCs for Each Alternative Evaluate all project alternatives using the same time period and discount rate Performe a LCCA Comparison Compare the net present value (Sum of cash flow) of each alternative Compare benefit-to-cost -ratio of best alternatives in order to select the most cost- effective options for the project budget

Example: Life-cycle costs of wooden windows Building costs Cost per unit (390€/m2) Proportion for operating and joint costs (15%) Reserve fo rise of the costs (2%) Profit and builder's costs (10%) Maintenance costs Painting every 8 years (137 €/m2) Reconditioning every 16 years (350 €/m2) Renovating every 40 years Current value with 40-year time period and 10% rate of interest:

Example: Life-cycle costs of wooden windows Operation costs Heat transfer through the windows (U-value 1,4 W/m2K): Cost of heating energy (0,077€/kWh): Current value with 40-year time period and 10% rate of interest: Total costs Life-cycle costs of wooden windows are:

Country specific variations LCCA in different countries Life cycle cost analysis programs are in principle the same in different countries Results may differ a lot from each other (the price of energy, circumstances, politics) The LCC-DATA (Intelligent Energy Europe) The LCC-DATA project aimed at easing and extending the use of Life Cycle Costs Analysis Database for in-use costs (operation, maintenance, management, energy, etc) The problem is still the lack of the use of LCC analysis. Companies also do not want to share their financial data