Canaan Valley Tucker County, West Virginia Decentralized Wastewater Management Facility Plan July 28, 2005 Pio Lombardo, P.E Lombardo Associates, Inc.

Slides:



Advertisements
Similar presentations
Session 3 Outline What is a Illicit Storm Water Discharge? - Potential Sources What is required by the permit? What should I have in place prior to getting.
Advertisements

Fayette County Wastewater Management Plan October 6, 2005.
Antideg and Municipal Stormwater Discussion Sept. 23, 2009.
Lunenburg CWMP Phase II – Management Techniques and Alternatives Identification and Screening Lunenburg Comprehensive Wastewater Management Plan Workshop.
Status of Wastewater Implementation February 20, 2013 Elizabeth Wood Monroe County, Sr. Administrator – Sewer Projects.
Berkeley Charleston Dorchester Water Quality Management (208) Program Vonie Gilreath, Regional Planner, BCDCOG Coastal Community Workshop February 7, 2006.
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Metropolitan Council Environmental Services A Clean Water Agency Presented to the Environment Committee November 9, 2010 Information Item Master Water.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
Article 41 Wastewater Planning Capacity Study To determine whether the Town will vote to adopt a resolution supporting the Town Manager’s allocation of.
1 RATE SETTING WORKSHOP February 23, RATE CHANGES In accordance with Section of the Charter Plan of the District, any proposed rate change.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
Collection Systems for Community Wastewater Systems CAWPCA Spring Meeting April 26, 2013 Dave Prickett, PE.
Public Private Partnerships P3s What the Public Sector Considers When Selecting the Right Private Partner Jose A. Galan - Division Director Miami-Dade.
Lecture(1) Instructor : Dr. Abdelmajid Nassar Civil Engineering Dept. Master Program Civil Engineering Dept. Master Program
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Obtaining the goals.  Identify realistic future use of all water bodies – drinking water, irrigation water, livestock watering, bathing, fishing, recipient.
Connecticut Department of Energy and Environmental Protection.
Smart Growth / Smart Energy Toolkit Wastewater and Higher Densities Achieving Higher Density Development In Areas Without Sewer/Water Service Smart Growth.
DOMESTIC SEWAGE GENERATION, COLLECTION, AND TREATMENT IN CLASS I CITIES Sr. No.WastewaterYear (?)2007 (?) 1Generated, mld7,007 16,27135,558.
WEKIVA BASIN ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM STUDY Bureau of Onsite Sewage Programs Division of Environmental Health Florida Department of.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 5: Design and Plan Review— Non-Conventional Systems.
Developing a Waste Water Discharge Fee Programme in Sri Lanka Kolitha Himal Muthukuda Arachchi Deputy Director General, Pollution Control Central Environmental.
Importance of Health Information Systems Information explosion during 1990s  It is estimated that in the next 50 years, the amount of knowledge currently.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
THE COST AND LEVEL OF SERVIC E PRESENTED BY: COURTNEY REICH, AICP ECOLOGICAL PLANNING GROUP Stormwater Management Programs for Local Governments.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
OH NO! WHAT DO WE DO NOW. WHAT DO YOU DO WHEN YOU DISCOVER THAT YOU’VE NOT BEEN DOING SOMETHING THAT YOU ARE REQUIRED TO DO? THE STORY OF RCW WATER.
April 28, 2015 City Council Workshop. City Council Goal 1 Expansion  Objective: To enhance infrastructure in order to maintain quality neighborhoods.
City of Gooding Town Hall Meeting October 2, 2013.
Joint WRAP Update Meeting III January 26, WELCOME… Thank you for joining us Please sign in Tonight’s topic… How we plan to meet the County’s future.
Regional Wastewater Facilities Plan Update Hardin County Water District No. 2 July 11, 2006.
Finance Committee Meeting Water Rate Study Update Habib Isaac – Principal Gregg Tobler – Task Manager August 13, 2012.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
Integrated Constructed Wetlands Regulatory Aspects - the EPA’s role Aoife Loughnane Inspector, Environmental Licensing Programme Environmental Protection.
Canaan Valley Tucker County, West Virginia Decentralized Wastewater Management Facility Plan January 11, 2006 Pio Lombardo, P.E Lombardo Associates, Inc.
Dining Services Review Process and Master Plan Finance & Administration Advisory Committee November 28, 2012.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
June 10, 2008 Board of County Commissioners B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Transmittal Hearing.
Implementation of the Joint Operations Plan Regionalization of the Water Resource Carol Bryck Capstone Project Executive Masters of Public Administration.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005.
Department of the Environment Maryland Water Quality Revolving Loan Fund Financing Stormwater Infrastructure Jag Khuman, Director Maryland Water Quality.
1 Maribor Wastewater Treatment Plant Presentation of PPP Model in Maribor - Slovenia Conference Danilo ŠALAMON – Chief of the Infrastructure projects Department.
Fayette County Wastewater Management Plan February 14, 2006.
Road Map to the Future: The Consolidation of Sewer Infrastructure in Rutherford County, NC November 16 th, 2015.
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
After Permitting –or- just when you thought you were out of the woods There is NO After! Between Permitting Compliance Schedules Permit Amendments Permit.
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
City of Gooding Town Hall Meeting October 29, 2013.
Showcase cost-saving practices, scale- appropriate technologies, and economic development opportunities and case studies from Idaho communities. Provide.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
Water Charge Instruments for Environmental Management in Latin America: from Theoretical to Practical Issues Mexico Country Case Lilian SAADE HAZIN and.
Waste Discharge Permit: Paradise Irrigation District
The Feasibility Study: something we already know
Presented by: Deborah Early Icenogle Seaver Pogue, P.C.
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Feasibility Study Preparation Venelina Varbova
DCS Solutions: Don Jackson Chen Kiat Yong Sarah Doyle
Article 41 Wastewater Planning Capacity Study
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
No out of pocket cost No payback period Generate $$$ in energy savings Eliminate your electric bill Give you money annually to spend on other things.
Why Potable Reuse in Florida?
Presentation transcript:

Canaan Valley Tucker County, West Virginia Decentralized Wastewater Management Facility Plan July 28, 2005 Pio Lombardo, P.E Lombardo Associates, Inc

Facility Plan Greater level of detail than Feasibility Study Used for bonding purposes

Planning Process Existing conditions assessment Planning period projections Needs analysis Alternatives identification & evaluation Management, legal, & institutional issues Capital budget & user charges Preferred Plan

Existing Conditions Assessment I/I location and quantities Daily flow data Effluent monitoring results System deficiencies WVDEP compliance orders TMDLs

Planning Period Projections Analysis of future growth potential Estimation of future wastewater flows and loads Identification of future permits required

Needs Analysis Design standards I/I issues Flow capacities Treatment performance Physical condition

Alternatives Identification and Evaluation Collection Conventional gravity STEG/STEP Pressure/vacuum Treatment Fixed film Suspended growth Integrated fixed film & suspended growth Dispersal Direct discharge Drip irrigation Water reuse

Management, Legal, & Institutional Issues Public Hamrick PSD Other public management entity Private Individual facilities One RME for multiple facilities

Capital Budget & User Charges Construction costs Development costs O&M costs Existing debt service Proposed project financing  Projected user rates

Preferred Plan Needs definition Solutions CIP Financing plan Management structure Implementation plan

Public Participation Project advisory committee Interviews with WWTFs Public meetings Project website

Questions / Answers